The value of production scheduling optimization.

Mining cost (¥/t) Stripping cost (¥/t) Processing cost (¥/t) Concentrate price (¥/t) Lower limit of production capacity/104t
72 9 105 900 800
Discount rate/% Concentrate grade/% Processing recovery rate/% Pit closure period/a Upper limit of production capacity/104t
8 66 80 1 5000
Price increase rate/% Cutoff grade/% Mining recovery rate/% Infrastructure period/a Infrastructure investment base/104 ¥
2.5 25 94 2 25,000
Cost increase rate/% Waste rock grade/% Waste rock mixing rate/% infrastructure investment of each ton of ores( ¥/t)
2 10 6 350