Skip to main content
. 2022 Dec 21;13:1087947. doi: 10.3389/fpsyg.2022.1087947

Table 2.

Construct reliability and validity analysis.

Construct and items Factor loadings S. E T value Reliability and validity
Role conflict (Ryan, 2008)
RC 1 0.733 0.112 37.264 Cronbach’s α = 0.822
CR = 0.839
AVE = 0.568
RC 2 0.798 0.111 38.359
RC 3 0.827 0.110 28.398
RC 4 0.644 0.117 38.027
Emotional exhaustion (Tate et al., 1997)
EE 1 0.727 0.111 24.843 Cronbach’s α = 0.861
CR = 0.880
AVE = 0.648
EE 2 0.833 0.112 30.821
EE 3 0.842 0.115 25.689
EE 4 0.812 0.112 17.847
Turnover intention (Bothma and Roodt, 2013)
TI 1 0.803 0.126 34.791 Cronbach’s α = 0.900
CR = 0.881
AVE = 0.650
TI 2 0.875 0.129 32.033
TI 3 0.734 0.130 31.481
TI 4 0.807 0.122 31.465
Workplace relational conflict (Doucet et al., 2009)
WRC 1 0.899 0.093 53.489 Cronbach’s α = 0.894
CR = 0.902
AVE = 0.821
WRC 2 0.914 0.091 55.922

S. E = Standard error of the mean; CR = Composite reliability; AVE = Average variance extracted.