Table 1.
Description of some evaluation factors used in the article.
| Evaluation Actor | Definition/Description |
|---|---|
| Latency | The time it takes for data to pass from one point on a network to another [11]. |
| Energy consumption | Using energy suitably and sufficiently with the least energy loss [12]. |
| Cost | The cost of reserved dedicated hosts in the cloud layer and file transfer into or out of the cloud in the considered period [13]. |
| Throughput | The production rate at which something is processed [14]. |
| Makespan | The total time required to complete all tasks [15]. |
| Effectiveness | The degree to which something is successful in producing the desired result; success [16]. |
| Execution time | The final stage of a computer program’s life cycle is in which the code is being performed on the computer’s central processing unit as machine code [17]. |
| Deadline | A task must be completed within the specified time frame [18]. |