Table 5.
Study | Deadline | Cost | Latency | Throughput | Effectiveness | Execution Time | Makespan | Energy Consumption |
---|---|---|---|---|---|---|---|---|
Zhang et al. [29] | ✗ | ✓ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ |
Study | Deadline | Cost | Latency | Throughput | Effectiveness | Execution Time | Makespan | Energy Consumption |
---|---|---|---|---|---|---|---|---|
Zhang et al. [29] | ✗ | ✓ | ✗ | ✗ | ✗ | ✗ | ✗ | ✗ |