Table 7.
Study | Deadline | Cost | Latency | Throughput | Effectiveness | Execution Time | Makespan | Energy Consumption |
---|---|---|---|---|---|---|---|---|
Pavithra et al. [14] | ✗ | ✗ | ✓ | ✓ | ✗ | ✗ | ✗ | ✗ |
Xia et al. [30] | ✗ | ✗ | ✗ | ✗ | ✓ | ✓ | ✗ | ✗ |
Darwish et al. [31] | ✗ | ✗ | ✗ | ✗ | ✓ | ✓ | ✗ | ✗ |
Bhatia et al. [32] | ✗ | ✗ | ✗ | ✗ | ✓ | ✓ | ✗ | ✓ |
Barzegaran et al. [33] | ✗ | ✓ | ✓ | ✗ | ✓ | ✗ | ✗ | ✗ |
Wang et al. [34] | ✗ | ✗ | ✗ | ✗ | ✓ | ✗ | ✗ | ✗ |