Skip to main content
. 2022 Sep 14;78(12):5049–5056. doi: 10.1002/ps.7148

Figure 2.

Figure 2

Project structure to address each problem statement. As this is a global activity, separate region‐specific subgroups within each subcommittee were established to maximize input and fully address each problem. The numbering represents the order in which these problem statements will be addressed as they build on each other, for example 1a and 1b are being addressed simultaneously with separate groups of subject matter experts.