TABLE 3.
Pipeline | Composition | Score | Time |
Stage 6 | |||
P6_01_H | - -shrink-factor 10 × 7 × 4 × 1 | 0.2419 | 3 d 17 h |
P6_02_H | Coarser affine - -shrink-factor 30 × 21 × 12 × 1 |
0.2834 | 6 d 12 h |
P6_03_H | - -shrink-factor 30 × 21 × 12 × 3 | 0.2147 | 2 h 29 m |
P6_04_H | - -shrink-factor 30 × 21 × 12 × 1 | 0.2544 | 6 d 12 h |
P6_05_H | - -shrink-factor 40 × 28 × 16 × 4 | 0.2232 | 2 h 43 min |
P6_06_H | - -shrink-factor 20 × 14 × 8 × 2 | 0.2314 | 18 h 12 m |
P6_07_H | - -shrink-factor 10 × 7 × 4 × 2 | 0.2382 | 10 h 29 m |
The shrink factors in the b-spline and SyN stages are the main variables to be optimized.