Skip to main content
. 2023 Jan 12;16(2):748. doi: 10.3390/ma16020748

Table 5.

Analysis of disposal phase. The values must be intended for 1 m2 of hull surface. Please consider that all the waste flows are valid for both paints.

Waste Disposal Scenario Quantity [kg]
Water Purification process 1.14 × 101
Plastic sheet Recycling 7.87 × 10−3
Paper scotch Recycling 3.81 × 10−3
Abrasive disc 1 Inert material landfill 1.08 × 10−1
Gelshield 200 Hazardous waste incineration 5.24 × 10−3
Thinner Hazardous waste incineration 1.36 × 10−3
Paint 2 Hazardous waste incineration 2.10 × 10−3

1 Considering both 60 and 120 abrasive grit. 2 Item valid for both TRD and EXP paintings.