Table 7.
Item | Cost |
---|---|
Manpower [EUR/h] | 16.68 |
Electricity [EUR/kWh] | 0.34 |
Diesel [EUR/L] | 1.90 |
Water [cEUR/L] | 0.14 |
Abrasive disc, grit 60 [EUR/disc] | 0.63 |
Abrasive disc, grit 120 [EUR/disc] | 0.69 |
Paper scotch [EUR/m] | 0.12 |
Plastic sheet [EUR/m2] | 0.61 |
Gelshield 200 [EUR/L] | 44.00 |
Thinner [EUR/L] | 18.00 |