Table 6.
SMIP vs DMIP: cost.
| SMIP |
DMIP |
Diff. (%) | ||||
|---|---|---|---|---|---|---|
| Cost (RMB) | Percentage | Cost (RMB) | Percentage | |||
| 1st-stage Cost | Fixed Cost | 3.00E+06 | 4.523% | 5.00E+06 | 4.944% | 66.67% |
| Subsidies | 8.20E+06 | 12.368% | 2.15E+06 | 2.129% | −73.76% | |
| Acquisition Cost | 1.07E+07 | 16.156% | 2.37E+07 | 23.441% | 121.22% | |
| Recourse cost | Transportation Cost | 6.60E+04 | 0.100% | 1.06E+05 | 0.104% | 59.95% |
| Handling Cost | 3.27E+03 | 0.005% | 1.31E+04 | 0.013% | 301.60% | |
| Serve Cost1 | 1.87E+07 | 28.156% | 9.53E+06 | 9.423% | −48.97% | |
| Serve Cost2 | 2.57E+07 | 38.692% | 1.50E+07 | 14.804% | −41.66% | |
| Penalty Cost | 0 | 0.000% | 4.57E+07 | 45.141% | – | |
| Total Cost | 6.63E+07 | 1.01E+08 | 52.47% | |||
Note: Serve Cost1 and Serve Cost2 represent the service cost paid to MS and RS in the second stage, respectively.