Table 3. Absolute differences in CTV between the perturbed and original plans.

Direction ΔD95% (Gy) ΔD98% (Gy) ΔD2% (Gy) ΔV110% (%)
VMAT-5B VMAT-10B VMAT-5B VMAT-10B VMAT-5B VMAT-10B VMAT-5B VMAT-10B
A 0.50 ± 0.08 -0.25 ± 0.16 0.55 ± 0.11 -0.23 ± 0.16 0.64 ± 0.19 -0.07 ± 0.12 2.13 ± 2.33 0.02 ± 0.04
P -0.79 ± 0.25 -1.69 ± 0.33 -1.05 ± 0.38 -1.99 ± 0.48 -0.59 ± 0.18 -0.85 ± 0.21 -0.43 ± 0.63 -0.02 ± 0.08
L 0.32 ± 0.09 -0.38 ± 0.18 0.37 ± 0.12 -0.40 ± 0.17 0.59 ± 0.19 -0.09 ± 0.19 1.87 ± 2.00 0.06 ± 0.12
R -0.57 ± 0.19 -1.48 ± 0.23 -0.78 ± 0.32 -1.69 ± 0.35 -0.38 ± 0.13 -0.74 ± 0.20 -0.31 ± 0.46 -0.03 ± 0.08
S 0.19 ± 0.31 -0.70 ± 0.18 0.17 ± 0.30 -0.71 ± 0.15 0.19 ± 0.30 -0.41 ± 0.15 0.55 ± 1.00 -0.01 ± 0.08
I -0.15 ± 0.07 -0.94 ± 0.14 -0.16 ± 0.07 -1.03 ± 0.14 -0.05 ± 0.10 -0.56 ± 0.17 -0.08 ± 0.28 -0.02 ± 0.08

A, anterior; P, posterior; L, left; R, right; S, superior; I, inferior.