Skip to main content
. 2023 Jan 4;37(1):71–91. doi: 10.1007/s40290-022-00452-w

Table 4.

Pilot study summary results: The summary results of the backlog Phase 1 pilot projects conducted by SAHPRA in 2016 and 2021

2016 risk-based approach in P&A Pre-Reg Unit 2021 risk-based approach in Backlog Clearance Program
Time received to time when application was allocated 1,542 calendar days 431 calendar days
Product total (master applications) 150 63 (RW 8)
Withdrawn (opted out) 51 6
Product used in the pilot project 99 57
Number of evaluators used 10 10
Evaluation week (products evaluated) 54 Weekly meetings for 10 weeks
Finalisation time (median) 90 calendar days (3 months) 68 calendar days (2.3 months)
Approval timea (median) 109 calendar days 110 calendar days

P&A Pre-Reg Pharmaceutical and Analytical Pre-Registration

aThe approval time is calculated from date of initial allocation