Simulation results of wind/diesel HES

EO25IIA CAT‐500 (kW) Architecture/CAT‐250 (kW) Cost/CoE ($) System/total fuel (m3/yr) CAT‐500/Hours CAT‐500/production (MWh) CAT‐500/fuel (m3) CAT‐500/fuel cost ($/yr) CAT‐250/hours CAT‐250/production (MWh) CAT‐250/fuel (m3) CAT‐250/fuel cost ($/yr) EO25IIA/production (MWh/yr) Cost/NPC ($) System/renewable fraction (%)
8 500 250 0.38 332 742 182 53 774,70 7988 923 280 410,811 433 7,034,956 23.4
500 250 0.43 413 1248 326 93 137,257 7512 111,9 320 470,124 8,061,773 0
8 500 0.48 419 8730 1308 419 615,876 433 8,895,312 9.3
500 0.50 468 8760 1509 468 687,637 9,297,429 0