TABLE 5.
CS6X‐325P (kW) | CAT‐500 (kW) | CAT‐250 (kW) | Inverter (kW) | Net present cost ($) | CoE ($) | Operating cost ($/yr) | Initial capital cost ($) | Renewable fraction (%) | System fuel consumption (m3/yr) |
---|---|---|---|---|---|---|---|---|---|
150 | 500 | 250 | 150 | 7,103,314 | 0.38 | 534,731 | 190,577 | 16.59 | 357 |
‐ | 500 | 250 | ‐ | 8,061,773 | 0.43 | 617,232 | 82,500 | ‐ | 413 |
150 | 500 | ‐ | 100 | 8,741,314 | 0.47 | 663,822 | 159,744 | 5.36 | 433 |
‐ | 500 | ‐ | ‐ | 9,297,429 | 0.50 | 714,556 | 60,000 | ‐ | 468 |