TABLE 11.
NPC($) | Initial capital cost ($) | O&M cost ($) | CoE (per Kwh) | |
---|---|---|---|---|
Base case | 8.74 M | 159,743 | 663,689 | 0.469 |
Hybrid system | 6.49 M | 510,576 | 462,604 | 0.348 |
NPC($) | Initial capital cost ($) | O&M cost ($) | CoE (per Kwh) | |
---|---|---|---|---|
Base case | 8.74 M | 159,743 | 663,689 | 0.469 |
Hybrid system | 6.49 M | 510,576 | 462,604 | 0.348 |