Table 13.

Order of transmission lines’ operating status in the Baicheng area.

Line Name Inspection Time Traditional Manual Scoring Evaluation Score Precedence Ranking
66 kV Chengbao line 2021.2 4 4.176 3
2022.11 4 4.129 4
2021.3 4 4.064 5
66 kV Chenglan line 2021.3 4 4.509 1
2020.6 3 3.566 8
2021.3 3 3.512 10
66 kV Chengtai line 2020.4 4 3.541 9
2022.3 4 3.759 7
2022.4 4 4.333 2
66 kV Town line 2022.3 4 3.892 6