Skip to main content
. 2020 Mar 1;1(1):104–134. doi: 10.1162/nol_a_00005

Table 3. .

The results of a mixed-effect logistic regression for the reconstruction accuracy data

  Estimate Est. Error 95% CI
Grand mean 0.41* 0.13 0.15 0.69
Scr3 - Scr1 −0.71* 0.07 −0.85 −0.57
Scr5 - Scr3 −0.59* 0.06 −0.70 −0.48
Scr7 - Scr5 −0.32* 0.06 −0.44 −0.21
ScrLowPMI - Scr7 −1.46* 0.07 −1.61 −1.33
*

Denotes significant difference. Int — intact, Scr — scrambled, PMI — pointwise mutual information.