Table 7.
Bootstrap test results for the various paths of the model.
| Predicted path | Estimate | SE | 95% confidence interval | Proportion of total effect (%) |
|---|---|---|---|---|
| CCS → BPN → FF | 0.351 | 0.126 | [0.216, 0.655] | 44.37 |
| CCS → EC → FF | 0.019 | 0.033 | [−0.014, 0.106] | |
| CCS → CC → FF | 0.128 | 0.063 | [0.051, 0.261] | 16.18 |
| CCS → BPN → EC → FF | 0.008 | 0.016 | [−0.006, 0.052] | |
| CCS → BPN → CC → FF | 0.082 | 0.037 | [0.039, 0.168] | 10.36 |
| Total indirect effect | 0.563 | 0.151 | [0.395, 0.899] | 71.18 |
| Direct effect | 0.227 | 0.177 | [−0.024, 0.532] | |
| Total effect | 0.791 | 0.226 | [0.519, 1.260] |
SE, standard error; CCS, controlling coaching style; BPN, basic psychological need; CC, constrained commitment; EC, enthusiastic commitment; FF, fear of failure.