Table 7.
Statistical analysis for comparison of CAD before and after the operation of SNPP.
| CAD (mSv) | Z | P | ||
|---|---|---|---|---|
|
Before (2014–2017) |
After (2018–2021) |
|||
| 1st quarter | 0.056 ± 0.023 | 0.089 ± 0.029 | −1.443 | 0.149 |
| 2nd quarter | 0.086 ± 0.039 | 0.096 ± 0.039 | −0.577 | 0.564 |
| 3rd quarter | 0.069 ± 0.011 | 0.090 ± 0.017 | −1.155 | 0.248 |
| 4th quarter | 0.108 ± 0.056 | 0.156 ± 0.088 | −0.289 | 0.773 |
| The total | 0.319 ± 0.046 | 0.431 ± 0.089 | −1.443 | 0.149 |