Table 1.
Project | Sample | Descriptives | |
---|---|---|---|
N | Mean ± Standard Deviation (SD) | ||
Goose Spring | Pre | 13 | 6.52 ± 6.67 |
Post | 13 | 7.49 ± 6.23 | |
Goose Summer | Pre | 12 | 8.87 ± 7.56 |
Post | 12 | 6.51 ± 5.91 |
Project | Sample | Descriptives | |
---|---|---|---|
N | Mean ± Standard Deviation (SD) | ||
Goose Spring | Pre | 13 | 6.52 ± 6.67 |
Post | 13 | 7.49 ± 6.23 | |
Goose Summer | Pre | 12 | 8.87 ± 7.56 |
Post | 12 | 6.51 ± 5.91 |