Skip to main content
. 2023 Feb 19;11(2):527. doi: 10.3390/microorganisms11020527

Table 1.

Rate and timing of biochar and urea application.

Treatment Urea
(kg ha−1)
Biochar
(t ha−1)
Biochar
(kg plot−1)
Urea
Basal
(g plot−1)
Urea
Tillering
(g plot −1)
Urea
Panicle Initiation
(g plot−1)
(T1) N1B0 135 0 0 343.36 206.02 137.34
(T2) N1B1 135 10 23.4 343.36 206.02 137.34
(T3) N1B2 135 20 46.8 343.36 206.02 137.34
(T4) N1B3 135 30 70.2 343.36 206.02 137.34
(T5) N2B0 180 0 0 457.82 274.69 183.12
(T6) N2B1 180 10 23.4 457.82 274.69 183.12
(T7) N2B2 180 20 46.8 457.82 274.69 183.12
(T8) N2B3 180 30 70.2 457.82 274.69 183.12