Skip to main content
. Author manuscript; available in PMC: 2023 Apr 1.
Published in final edited form as: Methods Ecol Evol. 2022 Jun 19;13(10):2181–2197. doi: 10.1111/2041-210X.13920

Figure 2:

Figure 2:

Trace plots of relevant parameters from analysis in Section 6.2. Estimates under the i.i.d. Gaussian prior are characteristic of poorly-identifiable conditions (the scales σ are overlapping resulting in label switching / row-wise convolution of the loadings). The shrinkage prior with forced spacing (α = 0.8) largely eliminates this problem.