Skip to main content
. Author manuscript; available in PMC: 2018 Jan 24.
Published in final edited form as: Epidemiol Infect. 2017 Sep 25;145(15):3143–3153. doi: 10.1017/S0950268817002138

Fig. 3.

Fig. 3

Amplitude of the highest annual pulse as a function of its timing. Hendra virus peaks are mostly clustered around 5–7 months (May–July; the austral winter) as suggested by the best fit quadratic line. However, including the point marked by the white asterix results in a non-significant relationship between peak magnitude and timing. Gray shading shows different years.