Abstract

Oil-immersed transformers are expensive equipment in the electrical system, and their failure would lead to widespread blackouts and catastrophic economic losses. In this work, an elaborate diagnostic approach is proposed to evaluate twenty-six different transformers in-service to determine their operative status as per the IEC 60599:2022 standard and CIGRE brochure. The approach integrates dissolved gas analysis (DGA), transformer oil integrity analysis, visual inspections, and two Back Propagation Neural Network (BPNN) algorithms to predict the loss of life (LOL) of the transformers through condition monitoring of the cellulose paper. The first BPNN algorithm proposed is based on forecasting the degree of polymerization (DP) using 2-Furaldehyde (2FAL) concentration measured from oil samples using DGA, and the second BPNN algorithm proposed is based on forecasting transformer LOL using the 2FAL and DP data obtained from the first BPNN algorithm. The first algorithm produced a correlation coefficient of 0.970 when the DP was predicted using the 2FAL measured in oil and the second algorithm produced a correlation coefficient of 0.999 when the LOL was predicted using the 2FAL and DP output data obtained from the first algorithm. The results show that the BPNN can be utilized to forecast the DP and LOL of transformers in-service. Lastly, the results are used for hazard analysis and lifespan prediction based on the health index (HI) for each transformer to predict the expected years of service.

Keywords: 2-Furaldehlyne (2FAL), Back propagation neural network (BPNN), Degree of polymerization (DP), Loss of life (LOL), Transformer health index (HI)

Subject terms: Engineering, Electrical and electronic engineering

Introduction

An electrical transformer is a critical component of electricity transmission and distribution networks. An oil-immersed transformer is the most expensive equipment in the electrical system, and its failure would lead to widespread blackouts and catastrophic economic losses1,2. Therefore, it is vital to perform routine maintenance and continuous monitoring of electrical transformers, particularly those employed at critical locations. Several massive electrical transformers that have been in service in recent years have been quite ancient3. These very ancient units are still in use, owing predominately to economic constraints. Presently, mankind has become increasingly reliant on the provision of power, imposing strain on the stability, availability, and cost-effectiveness of power supply4. The trouble-free operation of electrical transformers is a crucial condition for electrical system reliability and security. However, among the primary reasons for the failure of aging transformers in5,6, the mechanical integrity of the units to withstand stress caused by short-circuit currents can deteriorate dramatically with the degrading of insulation material. As a result, it is critical to thoroughly assess the aging state of the insulation material. The withering and lifespan duration of an oil-immersed transformer is determined by the solid insulation and the level of the withering of the insulating paper710. Oil has a strong insulating property while also operating as a cooling medium via natural or induced circulation. The oil-impregnated paper acts as an electrical insulator between windings and a mechanical barricade between individual windings and winding layers. As a result, the paper serves a major vocation in paper-oil insulation. Poor paper integrity causes early insulation deterioration, which potentially contributes to transformer collapse following a winding short circuit, for instance11,12.

Presently, the approaches for evaluating electrical transformers are separated into two categories: online supervision and offline supervision. With the evolution of the units, online system supervision has become more prevalent. While the transformers are in operation, online supervision approaches may be utilized to inspect and assess operational efficiency, evaluation, emergency warning action, and establish effective maintenance and repair forecasts13,14. Most significantly, using analysis, these online supervision systems can estimate the residual expected lifespan. However, monitoring approaches in this discipline are relatively recent. Research and innovation studies are constantly improving, although, it is still a challenge to determine the residual life of an electrical transformer since residual-life calculations are dependent on a variety of conditions. According to present requirements, the structural lifespan of an electrical transformer is restricted to the duration of the insulation paper. Deterioration of an insulation paper can be diagnosed using the degree of polymerization (DP), Furan analysis (FA), and CO2/CO ratio analyses15,16. DP analyses measure the physical capability of paper by calculating the cellulose degree. However, DP analyses and other tests fail to predict the operational lifespan of the transformer since numerous other factors influence the insulation degradation process17,18. Accurate detection and mining of certain dissolved gases in dielectric transformer oil has become the fastest-growing procedure in the diagnosis of transformer faults. Insulation breakdown occurs over time and is affected by heat, humidity, and oxygen concentration. Sophisticated oil conservation systems can reduce humidity and oxygen impacts on insulation breakdown19,20. The main determining factor in withering is the insulation temperature. Consequently, in practice, the extent of the cellulose paper withering is influenced by the transformer’s hotspot temperature. Tensile strength and DP are measured to determine the mechanical qualities of cellulose paper21. These characteristics are employed to assess when the cellulose paper insulation reaches the end of its dependable life. The cellulose paper insulation end-of-life requirements are commonly proposed22 to have DP values of 150–250; below 150, the cellulose paper is considered to be mechanically weak. The assessment of paper insulation for its DP value requires the extraction of a few sheet strips of paper from the investigated transformers23,24. However, the process remains challenging. Oil samples are utilized as an alternative. The procedure can conveniently be carried out during transformer maintenance, service, or repairs since it is usually not practical (and often dangerous to the transformer) to obtain the cellulose paper sample from a de-energized, in-service transformer. It has been demonstrated in2528, that the amount of 2-Furaldehlyne (2FAL) present in oil (the most important component of cellulose paper degradation) is significantly related to the DP of the cellulose paper within the transformer. The levels of 2FAL in oil correspond to the typical degradation of the cellulose paper. By measuring the quantity and types of furans present in a transformer oil sample, the cellulose paper insulation overall DP can be inferred with a high degree of confidence. The types and concentration of furans in an oil sample can also indicate abnormal stress in a transformer, whether intense, short-duration overheating or prolonged, general overheating. Therefore, estimating their residual lifespan is critical to prevent transformers from being shut down prematurely during service29,30. Table 1 illustrates the furan concentration thresholds used to grade the transformer condition. The value of DP and the amount of furan can be used to determine the condition of cellulose paper.

Table 1.

Furan concentration in parts per million (ppm)31.

Furan concentration (ppm) DP value Significance
0–0.1 1200–700 Healthy transformer
0.1–1.0 700–450 Moderate degradation
1–10 450–250 Extensive degradation
 > 10  < 250 End-of-life criteria

The furan test can simply determine furan from oil sampling on an in-service transformer. As demonstrated in Table 2, the quantity of furan concentration contained in the cellulose paper is used to calculate the transformers’ service life in years.

Table 2.

The age profile of cellulose paper based on furan32.

Furan concentration (ppm) Service life (years)
0–0.1  < 20
0.1–0.25 20–40
0.25–0.5 40–60
0.5–1.0  > 60
 > 10

Several DP and loss of life (LOL) techniques for electrical transformers have been proposed recently, in33,34, however, the current standards and approaches possess limitations, such as inaccurate estimations and inconsistent results for similar oil samples. These challenges must be rectified to have an efficient lifespan prediction scheme. Computational techniques have also been utilized to address these challenges. DGA has been conducted utilizing wavelet networks (WN)35,36, expert systems (ES)37, adaptive neuro-fuzzy inference system (ANFIS)38, artificial immune networks (AIN)39, support vector machines (SVM)40, and fuzzy logic (FL)41. Although the results for LOL of transformers presented in this work are decent, it is essential to promote the proposed approach to enhance LOL prediction accuracy to provide dielectric testing facilities and transformer manufacturers with reliable alternatives to existing techniques. Table 3 presents a comparative study of the recent research works and the proposed algorithm for forecasting LOL of cellulose paper insulation.

Table 3.

Summary of recent research works and proposed algorithm.

Refs. Years Proposed technique Contribution
42 2021 Regression modeling The study estimated DP utilizing the furfural marker at different oil-to-pressboard ratios and oil change statuses
43 2022

Artificial Neural

Network (ANN)

The study estimated furans by analyzing temperature, carbon dioxide, carbon monoxide, and moisture to estimate DP
44 2022 Empirical modeling The study estimated DP utilizing methanol (MeOH) concentrations obtained at low temperatures. The relative error was 7%
45 2023

ANFIS, Roger’s

ratio approach

A hybrid Rogers ratio technique-based ANFIS was proposed to detect transformer faults. The training was carried out by employing the gas ratios presented by the IEEE C57-104 and IEC 60599 standards
46 2024

Multi-classification

model

The study analyzes DGA by using machine learning (ML) techniques, adherence to IEC 60599:2022, and Eskom (Specification—Ref: 240-75,661,431) standards
Current study 2024

Back Propagation

Neural Network (BPNN)

Presented in section “Introduction” (Paper contribution)

Paper contribution

In this work, an elaborate diagnostic approach is proposed to evaluate twenty-six different transformers in-service to determine their operative status. The solid insulation evaluation process is a reliable practice to assess and forecast the DP and LOL as it provides generous information in inspecting the transformer condition. The contributions of the current research study are as follows and demonstrated in a block diagram as shown in Fig. 1.

  • DGA is utilized to obtain 2FAL data from oil samples received from all transformers under investigation.

  • A BPNN algorithm is proposed to forecast the DP using 2FAL concentration measured from oil samples using DGA.

  • A second BPNN algorithm is proposed to forecast the transformer LOL using the 2FAL and DP data obtained from the first BPNN algorithm.

  • Lastly, the results are used for hazard analysis and lifespan prediction based on the health index (HI) for each transformer to forecast the expected years of service as per the IEC 60599:2022 standard47 and CIGRE brochure48.

Figure 1.

Figure 1

Contribution stages block presented in a block diagram.

According to current research works, MeOH is commonly used to analyze cellulose paper in oil transformers. The experimental investigations reported and addressed in4952 have revealed that MeOH is a potential degradation indicator for all cellulose-based materials and may be used in many types of mineral oil. There is a significant relationship between DP and MeOH formation, as well as earlier diagnosis of cellulose degradation than 2FAL concentrations, supporting published works. However, at high temperatures, MeOH concentrations tend to stabilize while only 2FAL concentrations keep on developing53. Nonetheless, it is critical to recognize that early detection (MeOH) is critical for effective monitoring and mitigation measures at the appropriate time. In this work, the fact that 2FAL compounds are constantly produced, even at a later stage than MeOH, lends further weight to employing 2FAL data to forecast the transformer LOL utilizing the proposed BPNN algorithms since they can learn and train continuously growing 2FAL concentrations without experiencing overfitting. The results obtained using the proposed approach will be used to decide whether to repair, monitor, service, or scrap the transformer under investigation10,54.

The currently available capabilities and limitations of the proposed BPNN algorithm in comparison to other types of learning algorithms are presented in Table 4. The performances of the learning algorithms are evaluated according to how well they can generalize the relationship between vibration parameters, damage locations, and severities across a range of input and output variable counts55.

Table 4.

Capabilities and limitations of the BPNN in comparison to other learning algorithms that are currently available.

BPNN [current study] RBFN56 PNN57 CPNN58

Application

scope

Classification

Regression

Classification

Regression

Classification Classification

Classification

process

Minimize sum squared

errors by updating

weights

Relies upon the

BPNN process

Bayesian decision rule

Uses clustering methods

and PNN process

Capabilities

Simple application

to predict the patterns

Does not require any

statistical features in

the learning processes

Easy to identify the

magnitude of attributes

based on weights

A variety of applications

are available

Simpler format of

Gaussian function

Radial basis function

nodes can be substituted

with different functional

forms

Performs relatively

well in both smaller

and larger datasets

Simple architecture (no backpropagation)

Relatively good accuracy

in classification problems

Insensitive to noise

points

A smaller network size than ordinary PNN can avoid saturation of the Parzen window which leads to misclassification

May be more applicable

because it provides knowledge of the relative importance between explanatory variables

Fast training time

Limitations

Easily get stuck in local minima, resulting in a suboptimal solution

Prone to overfitting

and underfitting

Constructing

network architecture

is complicated

Long training

time

No sufficient

observations

More computationally

than BPNN (pre-stored

pattern neurons)

Saturated Gaussian can

lead to misclassification

May not provide higher prediction accuracy than PNN for discrete choice data

Varied by several clusters determined in k-means clustering

For future work, the authors will evaluate MeOH and 2FAL concentrations using artificial intelligence algorithms. The conclusions about which data produces accurate results using the algorithms presented in Table 3 will be drawn from which data produces underfitting and overfitting during training59.

Paper organization

The rest of the work is structured as follows: Section “Methods used to investigate transformers” outlines the methods used to investigate transformers in-service. Section “Results and analysis” provides a discussion of the results and analysis of the investigated transformers. Section “Discussion” provides a discussion and recommendations, and the paper is concluded in section “Conclusion”.

Methods used to investigate transformers in-service

The practical diagnostic approach for estimating the current status and remaining operating lifespan of an electrical transformer in terms of expected End of Life (EOL)60 is discussed in this Section. Four different tactics for analyzing data from on-site testing and estimating using algorithms were combined to develop the diagnostic technique. Oil tests were combined for estimating dissolved gases and oil quality, DP calculations based on indirect measurements of dissolved 2FAL in transformer oil, the HI approach for processing data collected through visual inspection, history, and test results, and risk of failure calculation based on the HI61,62. These techniques were utilized to determine whether transformers should be repaired, closely monitored, maintained, or scrapped63,64. Twenty-six specific transformers utilized in distribution substations in South Africa, Mpumalanga, were exposed to the proposed diagnostics. The diagnostics were divided into five phases, which are described below25,6568:

  • Assessment of the transformer’s current condition: involves visual inspection and all DGA and chemical tests conducted on transformer oil.

  • Gathering historical data: involves gathering information from prior faults, repairs, and maintenance. Obtaining data for the transformer’s load history and analyzing yearly test reports.

  • Algorithm analysis: the outcomes of each test are evaluated and applied to various algorithms to gather more data on the technical status of the transformers, as well as to detect hidden issues and abnormalities.

  • Application/Generalization: all data obtained through various tests and algorithms is generalized and analyzed to obtain more detailed knowledge about the transformer’s present condition. The majority of the tests usually yield comprehensive data for individual transformer parts.

  • Conclusions, predictions, and proposals: conclusions are reached and predictions are provided regarding the likelihood of failure, EOL of the transformers, and dependability according to the outcomes of diagnostic tests and procedures used. Proposals are provided to prioritize maintenance for the most degraded transformers or to discard them if the end of life has passed. Figure 2 demonstrates a block diagram of the five phases utilized in technical diagnosis.

Figure 2.

Figure 2

Phases for technical diagnosis.

The data gathered from the transformer’s historical events, conducted tests, as well as visual inspection is utilized to forecast imminent failures and EOL of each transformer, and according to these factors, a decision is made to prioritize transformers for repair, maintenance, or replacement if a transformer has reached its EOL69. Figure 3 demonstrates the primary descriptive framework of the approach utilized, which relies on HI calculations70,71.

Figure 3.

Figure 3

Predicting imminent failures and EOL based on HI and historical data.

The inspected transformers were manufactured throughout a variety of periods, and some of them had been in service for more than 30 years. The rated power ranged from 1250 kVA to 3.2 MVA, and the primary and secondary voltages were 11 kV, 6.6 kV, and 400 V, respectively. Transformer designs changed based on the year they were manufactured. Several transformers had undergone maintenance over their existence. The cooling system designs of transformers ranged from Oil Natural Air Natural (ONAN); Oil Natural Air Forced (ONAF); Oil Forced Air Forced (OFAF); Oil Natural Water Forced (ONWF); and Oil Forced Water Forced (OFWF)72,73. Table 5 contains technical information on the transformer group under consideration72.

Table 5.

Technical data of inspected transformers.

Index Serial number Rated power
and voltage
Manufactured year
T1 30,661,407/01 1250 kVA, 11 kV/400 V 1985
T2 30,661,409/01 1250 kVA, 11 kV/400 V 1987
T3 30,661,410/01 1250 kVA, 11 kV/400 V 1988
T4 30,661,404/01 1250 kVA, 11 kV/400 V 1984
T5 30,661,408/01 1250 kVA, 11 kV/400 V 2000
T6 30,661,411/01 1250 kVA, 11 kV/400 V 1984
T7 30,661,415/01 1250 kVA, 11 kV/400 V 2003
T8 30,661,405/01 2500 kVA, 6.6 kV/11 kV 1986
T9 30,661,413/01 2500 kVA, 6.6 kV/11 kV 2000
T10 30,661,401/01 2500 kVA, 6.6 kV/11 kV 2002
T11 30,661,402/01 2500 kVA, 6.6 kV/11 kV 1985
T12 30,661,418/01 2500 kVA, 6.6 kV/11 kV 1987
T13 30,661,403/01 3.2 MVA, 11 kV, 400 V 1987
T14 30,661,419/01 2500 kVA, 6.6 kV/11 kV 1987
T15 30,661,421/01 2500 kVA, 6.6 kV/11 kV 1987
T16 30,661,431/01 3.2 MVA, 11 kV, 400 V 2001
T17 30,661,412/01 1250 kVA, 11 kV/400 V 2001
T18 30,661,424/01 1250 kVA, 11 kV/400 V 1999
T19 30,661,425/01 1250 kVA, 11 kV/400 V 2003
T20 30,661,423/01 1250 kVA, 11 kV/400 V 2003
T21 30,661,420/01 2500 kVA, 6.6 kV/11 kV 1998
T22 30,661,416/01 2500 kVA, 6.6 kV/11 kV 1987
T23 30,661,441/01 3.2 MVA, 11 kV, 400 V 1983
T24 30,661,421/01 3.2 MVA, 11 kV, 400 V 2003
T25 30,661,417/01 3.2 MVA, 11 kV, 400 V 1985
T26 30,661,422/01 3.2 MVA, 11 kV, 400 V 1985

A diagnosis procedure was developed to estimate the present status of all transformers. The following tests and analyses were conducted on all transformers.

Transformer oil diagnostics

  • Water content in transformer oil was measured per IEC 60814 Oil-impregnated paper and pressboard74,75.

  • The breakdown voltage of transformer oil was measured per IEC 60156 Insulating liquids76,77.

  • The level of acidity present in transformer oil was measured per IEC 6202178,79.

  • Analysis of corrosive sulfur in transformer oil content using ASTM D1275-15 standard testing procedure for corrosive sulfur in electrical insulating fluids80.

  • Estimating the water content in insulating paper using the IEC 60814 standard81,82.

  • DGA of the transformer oil using IEC 60599 standard8385.

Visual inspection assessments were performed on all accessible transformer components

  • Main tank86.

  • Tap changer87,88.

  • Oil conservator89.

  • Breather90.

  • Cooling tubes91.

  • Buchholz Relay92.

Analysis of the data consisted of several methods for assessment

Investigation of transformer present state about oil tests and DGA findings:

  • Chemical assessments of transformer oil were performed to establish some of its properties that are critical for the mechanical performance of the unit, which covered the following: Chemical properties: (i) water content, (ii) corrosive sulfur, and (iii) acidity number93; Electrical properties: (i) dielectric strength, (ii) specific resistance and (iii) dielectric dissipation factor (tan δ)94,95. Each of these properties influences the integrity and reliability of transformer oil and its insulating characteristics. In terms of chemical properties, high water concentration in transformer oil may result in lower dielectric strength. The presence of corrosive sulfur in transformer oil creates an acidic environment in the oil, causing accelerated degradation of the cellulose paper and also the oil to become more acidic over time96. The quantity of acid present in the transformer is a critical signature that determines transformer oil integrity97,98. Electrical properties consist of (i) transformer oil dielectric strength—which signifies the maximum test voltage that the oil will sustain as an insulation material; (ii) specific resistance—which illustrates the insulation characteristics of transformer oil; and (iii) dielectric dissipation factor (tan δ)—indicates the quality of the transformer oil as an insulation material and the level of losses when voltage is applied across it99101.

  • Electrical transformers emit decomposition gasses when in service, which are primarily produced from organic insulation. The gas creation process is caused by thermal or electrical challenges, as well as the decomposition of transformer oil or cellulose. This might be due to regular transformer operation or an emergency with the unit in question. A portion of the produced gasses dissolves in the transformer oil102,103. DGA is used for evaluating different types of gases in transformer oil and then performing transformer diagnostics. This approach is effective for detecting specific defects (thermal or electrical) and assessing transformer operation104106. There are several techniques for interpreting the DGA. In most cases, a combination of these techniques is utilized to identify the cause of gasses. These approaches include identifying key gases (H2, CH4, CO, CO2, C2H4, C2H2, and C2H6) as well as their quantities in oil. An increase in the amount of several gases might indicate an issue in the transformer. If this is the case, the gas ratio should be established. Then, to address the issue, an interpretation technique for gas ratios provided in IEC 60599 might be applied. Alternatively, the proposed approach could potentially be utilized for interpreting the data. The values of the obtained gas ratios based on these techniques indicate a specific problem in the performance of the transformer107. In summary, the proposed approach has been employed in this work, and it is a good precise approach for transformer diagnosis. It could be utilized as well for periodic testing, with the findings compared over time to monitor the level of gas creation and gauge the actual condition of the transformer1,3,4,23.

Analysis of the condition of the transformers through BPNN algorithms

  • This analysis involved two BPNN algorithms for determining the LOL of transformers based on collected and measured data. The first BPNN algorithm proposed is based on forecasting the DP using 2FAL concentration measured from oil samples using DGA, and the second BPNN algorithm proposed is based on forecasting transformer LOL using the 2FAL and DP data obtained from the first BPNN algorithm. To acquire a complete understanding of the state of the transformer, the data based on the BPNN algorithm with weighting coefficients is applied, and the LOL is determined108110. Figure 4 demonstrates the analysis and results of HI components.

Figure 4.

Figure 4

Analysis of LOL.

Several studies have used the BPNN approach60,72 to anticipate numerous transformer states, such as the diagnosis of incipient defects using DGA111. In this work, BPNN algorithms are presented to forecast the remaining DP utilizing 2FAL concentration. A databank of 100 samples is utilized to construct the proposed BPNN algorithms using 2FAL as an input and DP as an output. Analysis of the data collected was changed into descriptive data ranging from A “Excellent” to E “Critical” condition112,113. DP of cellulose paper114,115 was used to estimate the remaining life of the transformer. An accurate estimate of DP to 2FAL was achieved by implementing an algorithm with a BPNN116,117. The BPNN algorithms were developed using several transformers and oil samples collected for lab testing. The algorithms were evaluated using cellulose paper samples extracted from transformers that had been removed from service for maintenance and retrofit. Since each transformer has an independent voltage level and capacity, the volume concentrations of dissolved gases in oil vary. Therefore, normalization of the input DGA data was employed to remove the discrepancy. In this work, the relative portion of the oil samples was adopted as the input vectors, which is shown in (1):

Xi=Xij=15Xi 1

Xi denotes the proportion of volume concentration of each gas contained in the oil data. Equation (2) was developed to determine DP using experimental data acquired from transformers well-insulated with standard Kraft paper:

DP=log102FAL-1.51-0.0035 2

Equation (3) was developed to determine DP using experimental data from Kraft cellulose paper as well as hermetical aging tests performed under high-temperature conditions and the degradation of a polymer main chain using (4):

DP=2.6-log102FAL0.0049 3
DP=18502FAL+2.3 4

Using (5), the DP can be used to forecast the remaining lifespan of the transformer at the time the oil sample was collected. This equation is based on a single variable, specifically the expected DP of cellulose paper.

Lifeconsumed=20.5×ln1100DP 5

The BPNN algorithm was adopted in this study due to its capacity to self-learn, simulate non-linear issues, and provide output that is not confined to the input feed, which is important for addressing the issue of cellulose paper for transformer manufacturers118,119. Figure 5a illustrates a conceptual representation of the proposed BPNN algorithm for estimating DP. It contains an input layer, hidden layers as required, and an output layer. The system works similarly to a biological neuron, receiving stimuli, interpreting them, and responding with an output. The input layer nodes receive input data and transfer it to the hidden layer 1 nodes via interconnected connections. When data are transported from input nodes to subsequent nodes, they are multiplied with weights and sent to the relevant layer using a transfer function. Similarly, it is forwarded to the output layer, where the target vector is used to compute the error. To generate the precise weighted combination of input data for target vector prediction, weights are altered based on this error. Using an artificial BPNN algorithm has several advantages over more conventional models. It learns the complexities of nature without being explicitly translated into mathematical form. The 2-hidden layers were used for two reasons: (i) the model performs efficiently using the BPNN algorithm, despite the extremely nonlinear input, and (ii) it is unlikely to experience overfitting. The learning process of a neural network (NN) is an iterative process in which the calculations are carried out forward and backward through each layer in the network until the loss function is minimized. This is illustrated in Fig. 5b.

Figure 5.

Figure 5

(a) Topology of created BPNN for estimation of DP; (b) Learning process of a NN.

The proposed algorithms use the input (2FAL) and the targeted output (DP) supplied to the BPNN network to generate the network output target of a new dataset. Figure 6 shows a detailed flowchart utilized for the design of the proposed BPNN algorithms. The process of designing the BPNN algorithms is divided into three phases: training, testing, and validation120122. The data is prepared using the following steps:

  • The preparation of the data ensures that it is error-free, consistent, and has no missing values before it is fed into the BPNN algorithm. These can have an impact on the performance and accuracy of the algorithm, leading to unexpected outcomes.

  • The data is modified to match inside the suitable BPNN range. The values are altered to have comparable magnitudes and distributions. This scaling allows the BPNN to learn more quickly and effectively while also avoiding numerical difficulties. To reduce noise creation, normalization, and standardization is used to rescale input and output variables before training the BPNN algorithm123,124.

  • The data is classified based on labels, classes, or categories and represented numerically using binary encoding for the BPNN to understand. Encoding also aids in reducing the dimensionality and complexity of data. After the data has been cleaned, scaled, and encoded, it is divided into separate sets using k-fold cross-validation for training, testing, and validation. This helps to analyze and enhance the BPNN algorithm while avoiding overfitting and underfitting.

  • In situations when the BPNN algorithm experiences a shortage of data, data augmentation is employed to improve the size and diversity of the data. Data augmentation involves making numerous transformations and adjustments to existing data, by creating modified copies of a dataset using existing data125,126.

  • Lastly, data visualization is employed to further study and comprehend the data. Data visualization entails producing graphical interpretations of data, such as charts, graphs, or diagrams. Data visualization aids in identifying patterns, trends, outliers, or correlations in data, as well as providing insights into the BPNN algorithm’s performance.

Figure 6.

Figure 6

Proposed BPNN flowchart.

BPNN training

During the BPNN training stage, the network is fed data comprising the 2FAL concentrations and the transformer DP samples as the targeted output. The training stage is essential in the development of the proposed BPNN algorithm. The network dimension, training functionality, adoption learning functionality, number of layers, as well as transfer functionality, are all aspects that have the potential to affect BPNN network efficiency127. Moreover, this stage can provide several difficulties, such as overfitting and underfitting128. This happens when an algorithm is trained on a large scale of data as it begins to learn from errors and noise in the input data set. Furthermore, testing using test data that has a high variance. The algorithm then fails to appropriately classify the data due to too many details and noise, and it leads to bad performance of the network. Stopping the network early has been utilized to prevent network overfitting and underfitting129. The optimal BPNN settings with the maximum precision, which is equivalent to the correlation coefficient (R), were obtained by modifying the number of hidden layers, the number of neurons, as well as the transfer functionality108,130. In this work, a two-layer system with 10-hidden layers and a 1-output layer was adopted for both BPNN algorithms. The proposed BPNN algorithm was developed using a databank containing 100 data sets, of which 70 were utilized for training and 30 for testing and validation. While a 1-hidden layer is sufficient for nonlinear modeling, a system with 2-hidden layers outperforms systems with 1-hidden layer in terms of the number of iterations, precision, and complexity. Furthermore, the 2-layer system helps solve the challenge of slow learning rates73.

BPNN testing

During BPNN testing, an unknown dataset is added to the network to evaluate the efficiency of the trained network. At this stage, the BPNN network is evaluated using linear regression modeling. The R is determined to analyze the relationship between the BPNN network outputs and the intended output. A successful network will have an R-value close to 1, indicating that there is a notable relationship between the BPNN network output and the targeted output. The overall efficiency of the BPNN network is expressed by the value of R and the best BPNN network is identified based on its closest relationship value to 168,95. The Levenberg–Marquardt (LM) training approach64,65 was used since it is recommended as the preferable supervised algorithm in the MATLAB environment due to its fast training rate116. Figure 7a,b show the coding of the two algorithms. Figure 8 shows the modeling configuration that predicts DP using only 2FAL concentration. Figure 9 shows the Mean Square Error (MSE)94 plot of the first BPNN algorithm. The three curves represent the change in the MSE with epochs for training, validation, and testing. However, the best algorithm was reached at epoch 19 as marked by the vertical dash line. It proves that the network achieved better results during the training stage compared to the testing stage because the desired outputs of the test data are always unknown to the network. No significant overfitting occurred with this iteration. The characteristics of both the validation and test curves are similar. The remarks above indicate acceptable results for the network.

Figure 7.

Figure 7

(a) BPNN coding to obtain DP using 2FAL; (b) BPNN coding to forecast LOL using DP and 2FAL.

Figure 8.

Figure 8

The BPNN configuration for DP estimation.

Figure 9.

Figure 9

Mean Square Error (MSE) plot of the first BPNN algorithm.

Figure 10 shows the regression analysis of the NN modeling of the training, validation, test, and complete datasets presented in this study. The training dataset consists of 100 data points (i.e. 70% of total data points for training), while the validation and test datasets have 30 data points (i.e. 15% each). It can be observed that the algorithm produces a correlation coefficient of 0.970 for the training, 0.956 for the validation, 0.944 for the testing, and an overall correlation of 0.965 when the DP is predicted using the 2FAL measured in oil. From Fig. 10, it is observed that the four linear fit lines were achieved (Eqs. 69) in the form y = a.x + b, where x and y are observed and predicted peak ground acceleration (PGA), respectively, which are listed below:

y=0.970.x+30 6
y=0.956.x+58 7
y=0.944.x+34 8
y=0.965.x+34 9
Figure 10.

Figure 10

BPNN performance results for the estimation of DP from 2FAL.

Figure 11 shows the error histogram for our NN modeling showing most of the larger positive and negative values are near the zero-error line (shown by an orange thick line), which suggests the error distribution of the NN modeling is good. Thus, the algorithm is well trained.

Figure 11.

Figure 11

Error histogram of the first BPNN algorithm.

Figure 12 illustrates the algorithm setup for forecasting LOL based on predicted DP and measured 2FAL. Figure 13 shows the MSE plot of the first BPNN algorithm. The network produces a substantial MSE at first, however, it decreases as the training advances to 5 epochs. As demonstrated in Fig. 13, the best validation performance of the second BPNN algorithm occurred at 5 iterations, as shown by the vertical dash line. This iteration shows a minor overfitting. The characteristics of both the validation and test curves are slightly different; however, the remarks above indicate acceptable results for the network.

Figure 12.

Figure 12

The BPNN configuration for LOL forecasting.

Figure 13.

Figure 13

Mean Square Error (MSE) plot of the second BPNN algorithm.

Figure 14 shows the second proposed BPNN algorithm performance plot, and the regression analysis of the NN modeling for our training, validation, test, and complete datasets. The training dataset consists of 100 data points (i.e. 70% of total data points), while the validation and test datasets have 30 data points (i.e. 15% each). It can be observed that the algorithm produces a correlation coefficient of 0.999 for the training, 0.999 for the validation, 0.999 for the testing, and an overall correlation of 0.999 when the prediction of transformer LOL concerning 2FAL generated and the amount of DP present produced. From Fig. 14, it is observed that the four linear fit lines were achieved (Eqs. 1013) in the form y=a.x+b, where x and y are observed and predicted PGA, respectively, which are mentioned below:

y=0.999.x+0.016 10
y=0.999.x+0.007 11
y=0.999.x+0.055 12
y=0.999.x+0.096 13
Figure 14.

Figure 14

BPNN performance results for forecasting LOL from 2FAL and DP.

Figure 15 shows the error histogram for our NN modeling showing most of the larger positive and negative values are near the zero error line (shown by an orange thick line), which suggests the error distribution of the NN modeling is good. Thus, the algorithm is well trained. Figure 16 is given as some results of trained neurons, and the overall amount of gas dissolved in the oil, which is the average of all gas amounts recorded.

Figure 15.

Figure 15

Error histogram of the second BPNN algorithm.

Figure 16.

Figure 16

Measured total gas dissolved (TGD).

Table 6 summarizes the analytical settings used in the proposed BPNN algorithms. The MSE, R, and computation time for the two algorithms are contrasted in Table 7. The second algorithm outperforms the first algorithm in terms of R. Due to the large quantity of data to train, the second approach takes a bit more time to compute than the first algorithm. However, because the simulation is done offline, the computation time cannot be used to determine the optimum algorithm44. Consequently, after considering all simulation data, it is proven that the second algorithm has an exceptional capacity to accurately forecast transformer LOL131.

Table 6.

BPNN algorithm settings.

Sample 2FAL
Data division Random
Training Levenberg–Marquardt
Performance Mean Square Error
Calculations MEX
Table 7.

Comparison of the two proposed BPNN algorithms.

Index MSE R Computation time Rank
BPNN 1 2.7841 × 103 0.965 23.4 2
BPNN 2 4.9758 × 102 0.999 26.2 1

Transformer lifespan estimates were performed using the calculated HI coefficient. The HI coefficients and grades are presented in Table 8. The integrity of the transformer was specified as its capacity to withstand minimal loads and pressures while preserving its functional specifications over time. Transformer condition reliability can be calculated using (14):

Ri(t)=e-λt 14

where t is the time in years, and λ=f(HI)

Table 8.

HI coefficients and grades.

Index Specifications t Grades λ
1 DGA 15 A, B, C, D 4, 3, 2, 1……
2 Load history 6 A, B, C, D 4, 3, 2, 1……
3

Temperature and

hotspots

4 A, B, C, D 4, 3, 2, 1……
3 Oil integrity 15 A, B, C, D 4, 3, 2, 1……
5 Furans 9 A, B, C, D 4, 3, 2, 1……
6 Cellulose paper 5 A, B, C, D 4, 3, 2, 1……
7

Water content in

cellulose paper

5 A, B, C, D 4, 3, 2, 1……
8

Main and

conservator

tank condition

4 A, B, C, D 4, 3, 2, 1……
9 Tap changer 5 A, B, C, D 4, 3, 2, 1……
10

Cooling system and

Explosion vent

3 A, B, C, D 4, 3, 2, 1……
11 Buchholz relay condition 6 A, B, C, D 4, 3, 2, 1……
12 Rust 4 A, B, C, D 4, 3, 2, 1……
13 Oil leakage and level 2 A, B, C, D 4, 3, 2, 1……
14 Grounding system 2 A, B, C, D 4, 3, 2, 1……
15 Paint 8 A, B, C, D 4, 3, 2, 1……
16 Working clearance 7 A, B, C, D 4, 3, 2, 1……

When a transformer is operating normally, without external or sudden issues that might cause failure, all parts of the equipment deteriorate at a constant rate, which is usually specified by its working years and the current condition of all the parts. To account for all of the transformer’s parts that have an impact on its condition over extended periods, and years, the HI is included in the calculation of the transformer’s durability. The formula used to determine the failure rate is given in (15):

λ=1-HIA2 15

where parameter A=f(t,γ). Parameter A is calculated by using (16):

A=te-ty 16

where t is the years of service of the transformer; γ is coefficient 1, 2, 3, and 4 depending on the degrading curve (γ = 1 if the transformer is relatively new and it is in the zone of sudden failures; γ = 2 if the transformer is working normally but its designed working years are unknown; γ = 3 when the transformer has already exceeded its initially planned years of service; γ = 4 when the transformer is a risk); and te is the expected working years of the transformer. All calculations were performed with te = 61 years. Durability was used to calculate the risk of failure. Transformer durability and risk of failure statistics are shown in the estimated years that the transformers will operate reliably.

Results and analysis

The outcomes of all conducted experiments and proposed BPNN algorithms are reported for all evaluated transformers, ranging from T1 to T26. The data were collected using transformer oil sampling and DGA. Sampling was performed to predict the water concentration in cellulose paper based on chemical analysis for oil integrity. Data was obtained using visual inspections as well as the past events of the transformer, which was investigated during the testing process. The outcomes of the proposed BPNN algorithms were established on HI estimations, predicted transformer lifespan based on estimated DP via the BPNN, and durability and risk of failure estimates based on the HI. The results gathered from all conducted checks and analyses on all studied transformers were consolidated.

Transformer oil measurements and test data

DGA of the transformer oil

Table 9 illustrates a description of the investigated gases discussed in the study and Table 10 shows the measurements of dissolved gases detected and recorded in oils of the evaluated transformers.

Table 9.

Description of gases.

Gas detected Description
C2H2 Acetylene
C2H6 Ethane
C2H4 Ethylene
CH4 Methane
CO Carbon monoxide
CO2 Carbon dioxide
H2 Hydrogen
O2 Oxygen
Table 10.

Measured gases in ppm from DGA for investigated transformers.

Index H2 CH4 C2H2 C2H4 C2H6 CO CO2 O2
T1 6 3 0.5 10 9 53 722 NA
T2 6 3 0.5 2 18 86 756 NA
T3 6 3 7.5 17 3 70 687 NA
T4 8 3 9 21 3 83 703 NA
T5 8 3 116.4 3 5 103 945 NA
T6 6 3 57.8 6 5 75 798 NA
T7 6 15 4 5 3 68 766 NA
T8 6 7 3 5 3 55 821 NA
T9 8 5 0.6 5 3 66 939 NA
T10 9 3 0.5 16 3 67 963 NA
T11 8 13 0.5 11 2 49 872 NA
T12 8 3 0.5 6 3 33 537 NA
T13 7 3 0.5 15 2 39 671 NA
T14 6 3 11.3 64 4 41 825 NA
T15 6 2 9 31 3 40 899 NA
T16 6 2 12.5 17 4 91 891 NA
T17 6 5 21.6 4 6 73 567 NA
T18 8 2 11 18 5 29 731 NA
T19 8 3 0.7 13 4 31 723 NA
T20 6 3 0.6 3 3 52 901 NA
T21 6 1 0.6 12 3 31 875 NA
T22 6 1 0.8 41 3 57 633 NA
T23 6 3 0.5 33 2 65 800 NA
T24 7 3 0.5 2 5 111 804 NA
T25 7 4 2 5 6 89 540 NA
T26 8 11 6.3 19 5 37 981 NA

Chemical analysis of transformer oil

Figures 17, 18, 19 and 20 illustrate the chemical and electrical properties of the evaluated oil data.

Figure 17.

Figure 17

Water concentration (mg/kg).

Figure 18.

Figure 18

Breakdown voltage (kV).

Figure 19.

Figure 19

Acid content (mgKOH/g).

Figure 20.

Figure 20

Water concentration in cellulose paper (%).

Data collected through visual inspection

Main tank

Table 11 provides an overview of the information gathered from visual inspections of the main tanks of all the transformers under investigation.

Table 11.

Defects identified during visual inspections of main tanks.

Inspected
defect
No. of transformers
with defects
Transformers without noted defects
Exterior of unit 9 T2, T3, T4, T5, T6, T9, T10, T11, T12, T14, T15, T18, T19, T22, T23, T24, T25
Proper grounding 15 T3, T4, T5, T6, T16, T17, T19, T20, T22, T25, T26
Rust 26
Seals 5 T1, T2, T3, T4, T5, T6, T9, T10, T11, T12, T13, T15, T16, T17, T18, T19, T20, T21, T22, T25, T26

Oil level, leakage,

thermometer and

drain valve

17 T8, T9, T10, T16, T17, T19, T20, T21, T23
Paint 21 T9, T10, T11, T12, T13, T26
Working clearance 0 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26

Tap changer

Table 12 provides an overview of the information gathered from visual inspections of the tap changers of all the transformers under investigation.

Table 12.

Defects identified during visual inspections of tap changers.

Inspected
defect
No. of transformers
with defects
Transformers without noted defects
Oil leakage 1 T1, T2, T3, T5, T6, T7, T8, T9, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T26
Loose connections 4 T2, T3, T4, T5, T6, T7, T8, T9, T11, T12, T13, T14, T16, T17, T18, T19, T20, T22, T23, T24, T25, T26
Covers 5 T1, T2, T3, T4, T5, T6, T9, T10, T11, T12, T13, T15, T16, T17, T18, T19, T20, T21, T22, T25, T26
Proper operation 4 T2, T3, T4, T5, T6, T7, T8, T9, T11, T12, T13, T14, T16, T17, T18, T19, T20, T22, T23, T24, T25, T26
Working clearance 0 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26

Oil conservator

Table 13 provides an overview of the information gathered from visual inspections of the oil conservators of all the transformers under investigation.

Table 13.

Defects identified during visual inspections of oil conservator tanks.

Inspected
defect
No. of transformers
with defects
Transformers without noted defects
Rust 11 T1, T8, T9, T10, T11, T12, T13, T14, T17, T18, T19, T20, T21, T22, T23
Seals 5 T1, T2, T3, T4, T5, T6, T9, T10, T11, T12, T13, T15, T16, T17, T18, T19, T20, T21, T22, T25, T26
Oil leakage 17 T8, T9, T10, T16, T17, T19, T20, T21, T23
Paint 21 T9, T10, T11, T12, T13
Working clearance 0 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26

Breather

Table 14 provides an overview of the information gathered from visual inspections of the breathers of all the transformers under investigation.

Table 14.

Defects identified during visual inspections of breathers.

Inspected
defect
No. of transformers
with defects
Transformers without noted defects
Silica gel color 25 T22
Breathing holes 1 T1, T2, T3, T4, T5, T6, T9, T10, T11, T12, T13, T15, T17, T18, T19, T20, T21, T22, T25, T26
Cap oil level 24 T22, T26
Cracks 3 T1, T2, T3, T4, T6, T7, T8, T9, T10, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T24, T25, T26
Working clearance 0 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26

Cooling tubes

Table 15 provides an overview of the information gathered from visual inspections of the cooling tubes of all the transformers under investigation.

Table 15.

Defects were identified during visual inspections of cooling tubes.

Inspected
defect
No. of transformers
with defects
Transformers without noted defects
Rust on cooling tubes 26
Rust on cooling fans 26
Oil leakage on tubes & valves 26
Missing tubes & coolers 0 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26
Missing fans 0 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26

Buchholz relay

Table 16 provides an overview of the information gathered from visual inspections of the Buchholz relays of all the transformers under investigation.

Table 16.

Defects identified during visual inspections of Buchholz relays.

Inspected
defect
No. of transformers
with defects
Transformers without noted defects
Missing magnetic oil level indicator 0 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26
Faulty magnetic oil level indicator 3 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T26
Missing oil temperature indicator 1 T1, T2, T3, T4, T5, T6, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26

Faulty oil temperature

indicator

0 T1, T2, T3, T4, T5, T6, T7, T8, T9, T10, T11, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T23, T24, T25, T26

Results obtained through applied analysis of collected data

DGA of the transformer oil and oil analysis

Table 17 provides an overview of the conclusions drawn from the analysis of the data.

Table 17.

Summary of the DGA and oil test analysis.

Index DGA results Oil test results
T1 No fault detected Normal
T2 No fault detected Normal
T3

Fault was detected with low partial discharges and

overheating with temperature below T < 300 °C

Acid content high
T4

No fault was detected. High quantities of methane CH4,

caution is needed

Acid content high
T5 No fault detected Normal
T6 No fault detected Normal
T7 No fault detected Normal
T8

No fault was detected. High quantities of methane CH4,

caution is needed

Acid content high
T9 No fault detected Normal
T10

Fault was detected with low partial discharges and

overheating with temperature below T < 300 °C

Acid content high
T11

Fault was detected with low partial discharges and

overheating with temperature below T < 300 °C

Acid content high
T12 No fault detected Normal
T13 No fault detected Normal
T14 No fault detected Normal
T15 No fault detected Normal
T16 No fault detected Normal
T17 No fault detected Normal
T18 No fault detected Normal
T19 No fault detected Normal
T20 No fault detected Normal
T21 No fault detected Normal
T22 No fault detected Normal
T23

No fault was detected. High quantities of methane CH4,

caution is needed

Acid content high
T24 No fault detected Normal
T25

Fault was detected with low partial discharges and

overheating with temperature below T < 300 °C

Acid content high
T26 No fault detected Normal

Health Index (HI)

Figure 21 illustrates the outcomes of the HI calculations that were performed using the algorithms proposed in in study.

Figure 21.

Figure 21

Calculated HI for transformers T1–T26.

Table 18 shows the estimated years of operation for each transformer according to the calculated HI. It was estimated that six transformers would last more than 15 years. There were no transformers discovered to have near EOL or EOL materials. Small to medium-sized defects that can be resolved to stop serious failures were discovered in every transformer. The service and maintenance of seven transformers were given priority.

Table 18.

HI values and expected years of service.

Health index (%) Condition Expected years of service No. of transformers
85–100 Excellent  > 15 5
70–85 Good  > 10 14
50–70 Fair  < 10 7
30–50 Poor  < 3 0
0–30 Critical End of Life 0

Calculated degree of polymerization

Table 19 displays the compiled results for all transformers, and Figure 22 displays the estimated DP for all units using the proposed BPNN algorithms. The results demonstrate that none of the units was discovered to be approaching the end-of-life category, and all tested units meet the standard aging domain of cellulose paper132.

Table 19.

Evaluation of DP and cellulose paper properties.

Concentration (ppm) Condition No. of transformers
600–800 Normal aging rate 26
360–600 Accelerated aging rate 0
300–360 Excessive aging rate 0
200–300 High risk of failure 0
 < 200 End of life 0
Figure 22.

Figure 22

Estimated DP for transformers T1–T26.

To improve estimation precision and diagnose defect types, diagnostic techniques must be classified based on their susceptibility and monitoring capabilities against defects and insulation deterioration. Table 20 summarizes routine and diagnostic analysis according to their capacity to discover defects. According to IEEE C57.104133, DGA alone is capable of diagnosing 70% of typical defects, however, additional evaluations are required to identify mechanical defects.

Table 20.

Comparison between online, routine, and diagnostic analysis for transformer condition.

Diagnose
name
Online
monitoring
Routine
analysis
Diagnostic
analysis
Defects detection types
Electrical Mechanical Thermal
DGA X X X X X
Oil sampling X X X X
Furan sampling X X X X
DP assessment X X

Partial discharge (PD)

diagnostic

X X X
Cellulose analysis X X X X X
Chemical analysis X X X X X
Leakage reactance X X
Insulation resistance X X
Winding resistance X X
Sweep frequency response analysis (SFRA) X X X
HI X X X
Visual inspection X X

To improve dependability, significant industry regulations and improved research, such as CIGRE, IEEE, and IEC, have been applied to specific procedures for evaluating and analyzing test results. These quantitative and diagnostic procedures can assist maintenance professionals in interpreting test results and recommending key transformer characteristics that ought to be monitored. These procedures can assist utilities in preventing unforeseen breakdowns and offer a rationale for plant managers for the replacement of unreliable aging transformers through accurate forecasts. This work offers an overview of current testing as well as transformer condition assessment strategies. This is a discipline whereby a great deal of research is being conducted to better comprehend the features of various tests and to develop improved techniques for integrating test results to monitor the state of this costly and vital equipment. As the number of units of assets ages, the relevance of these strategies appears to increase even more.

Discussion

Electrical transformers are essential to the electrical system, and detecting latent defects immediately can help prevent more significant issues. This work tackled the issue of predicting and identifying electrical transformer defects using DGA data samples that result from low-occurring transformer issues. The capability to monitor equipment degradation opens up possibilities of reducing costs related to repairs and maintenance while also avoiding a variety of unexpected events. This will enable long-term studies on invested materials as well as a reduction in the initial energy required to design new units. The twenty-six electrical transformers, which were the topic of complex evaluations and inspection, were addressed and classified into different classes based on their HI, DP, DGA, and P (risk of failure). These classes involved scheduled maintenance and repair. The HI observations showed that the units had a significant amount of residual life and the technical capability of being in operation for extra years. As a consequence, none of the transformers required to undergo repair. The findings demonstrate that the transformers T1, T2, T5, T6, T7, T8, T9, T12, T13, T14, T15, T16, T17, T18, T19, T20, T21, T22, T24, and T26 are operating normally, thus no preventative action required at this stage. Methane levels in T4, T8, and T25 were approaching alert limits and were planned to undergo further diagnostics and monitoring. DGA discoveries in transformers T3, T10, T11, and T25 led to the diagnosis of an electrical fault and were planned to undergo visual inspection and testing. Transformers T3, T5, and T17 produced positive HI and DP findings, however, the DGA and R results indicate that cautious/or further diagnostics are required and the units were scheduled for moisture purification and resampling for safety and economic purposes. Table 21 summarizes the findings of the complex inspections and evaluations of the twenty-six electrical transformers surveyed, with color-coded data.

Table 21.

Required action for the investigated transformers.

graphic file with name 41598_2024_56598_Tab21_HTML.jpg

In this study, the approaches together supplied more detailed knowledge on the condition of each transformer as well as its expected lifespan. As per the 2FAL results obtained from the oil data, each transformer had minimal insulation degradation as well as a significant DP. However, their expected lifespans over the years of operation differed, and according to the HI, eighteen units performed admirably. Table 22 illustrates comparisons derived from all diagnostic techniques applied. The actions that must be implemented when utilizing DP data to assess the condition of the transformer to implement safety precautions are listed in Table 23.

Table 22.

Grade comparisons for the four assessments conducted.

Techniques
employed
No. of transformers
Excellent Good Fair Poor
DGA 18 6 2 0
BPNN algorithms (2FAL, DP) 18 6 2 0
Health index 5 14 7 0
Visual inspection 0 16 8 2

Table 23.

Recommendations for transformer measures based on results.

DP value Comment
 < 200 The test results show substantial cellulose paper deterioration that exceeds the critical threshold. It is highly recommended that the unit be removed from service immediately and visually inspected
200–250 The cellulose paper is close to or in a catastrophic state. Recommended that the unit be removed from service and properly examined as soon as feasible. Direct DP analysis can be performed on paper samples
260–350 The cellulose paper is nearing the end of its life. To review the state, schedule a verification and/or re-sample within 1 year
360–450 The cellulose paper is approaching its critical state. Recommend re-sampling in 1–2 years
460–600 Substantial cellulose paper degradation, however, is still far from the critical threshold
610–900 Low to moderate cellulose paper aging
 > 900 No observable deterioration of the cellulose paper

Conclusion

In this work, twenty-six electrical transformers were put through diagnostic and monitoring assessments. The proposed approach integrated DGA, transformer oil integrity analysis, visual inspections, and two BPNN algorithms to predict the LOL of the transformers through condition monitoring of the cellulose paper and the HI approach for prioritizing units for repair, maintenance, or replacement. The findings of the proposed diagnostic procedures were acquired and investigated, and a list of transformers was proposed for repair, maintenance, and continuous supervision.

Based on the diagnostic approach proposed in this study, the following conclusions were attained:

  • The adoption of DGA and visual inspections on electrical transformers saves money when planning a maintenance schedule.

  • The DGA data were used as input samples into the NN for diagnosis. The experimental findings demonstrated that the first BPNN algorithm could accurately forecast transformer DP. The first algorithm produced a correlation coefficient of 0.970 when the DP was predicted using the 2FAL measured in oil. It is essential to schedule transformer maintenance in advance to prevent failure from escalating.

  • The results of the second BPNN algorithm were fed into the NN for assessment. The experimental results demonstrated that the second BPNN method was successful at forecasting transformer LOL. The second algorithm produced a correlation coefficient of 0.999 when the LOL was predicted using the 2FAL and DP output data obtained from the first algorithm.

  • The experimental results demonstrated that the BPNN algorithms can overcome the constraints of other learning algorithms based on DGA due to the limited and disorganized dispersal of transformer oil data. The BPNN algorithm offers more effective generalization performance compared to the other learning algorithms.

  • The HI findings revealed that no transformers had near-end-of-life or end-of-life materials as per the IEC 60599:2022 standard and CIGRE brochure.

Examining the condition of the cellulose paper insulation is crucial when thinking about a transformer maintenance schedule. In this instance, moving the transformer to a manufacturing station for rehabilitation would be a more economical maintenance strategy. All previous studies have demonstrated and verified that MeOH appears to be an effective marker for detecting the start of cellulose paper degradation. MeOH concentration increases in a “logarithmic’ trend (early diagnosis of deterioration), whereas 2FAL increases in an “exponential” trend (diagnosis when deterioration is extreme). When the cellulose insulation is exposed to low temperatures and the deterioration process is fully engaged, MeOH content appears to stabilize. From this point on, 2FAL is considerably generated and becomes greater than MeOH. For future work, the authors will evaluate MeOH and 2FAL concentrations using artificial intelligence algorithms. The conclusions about which data produces accurate results using the algorithms will be drawn from which data produces underfitting and overfitting during training.

Acknowledgements

The authors would like to acknowledge the University of Pretoria for wholly supporting the study for academic purposes.

Author contributions

Conceptualization, M.K.N.; methodology, M.K.N.; software, M.K.N.; validation, M.K.N., and M.N.G.; formal analysis, M.K.N.; investigation, M.K.N.; writing—original draft preparation, M.K.N.; writing—review and editing, M.K.N. and M.N.G.; visualization, M.K.N.; supervision, M.N.G. All authors have read and agreed to the published version of the manuscript.

Data availability

The data that support the findings of this study are available from the corresponding author upon reasonable request.

Competing interests

The authors declare no competing interests.

Footnotes

Publisher's note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

These authors contributed equally: M.K. Ngwenyama and M.N. Gitau

References

  • 1.Zou D, et al. Transformer fault classification for diagnosis based on DGA and deep belief network. Energy Rep. 2023;9:250–256. doi: 10.1016/j.egyr.2023.09.183. [DOI] [Google Scholar]
  • 2.Gopakumar, S. & Sree Renga Raja, T. Determination of power transformer fault’s severity based on fuzzy logic model with GR, level and DGA interpretation. J. Electr. Eng. Technol. 1–22 (2023).
  • 3.Lekshmi, A. K., Kumar, D. S. & Beevi, K. S. Trend prediction of power transformers from DGA data using artificial intelligence techniques. in Communication and Intelligent Systems: Proceedings of ICCIS 2021 1053–1065 (Springer, 2022).
  • 4.Wajid, A. et al. Comparative performance study of dissolved gas analysis (DGA) methods for identification of faults in power transformer. Int. J. Energy Res.2023 (2023).
  • 5.Booth C, McDonald JR. The use of artificial neural networks for condition monitoring of electrical power transformers. Neurocomputing. 1998;23(1–3):97–109. doi: 10.1016/S0925-2312(98)00064-2. [DOI] [Google Scholar]
  • 6.Ghoneim SS, Taha IB, Elkalashy NI. Integrated ANN-based proactive fault diagnostic scheme for power transformers using dissolved gas analysis. IEEE Trans. Dielectr. Electr. Insul. 2016;23(3):1838–1845. doi: 10.1109/TDEI.2016.005301. [DOI] [Google Scholar]
  • 7.Singh A. & Verma, P. A review of intelligent diagnostic methods for condition assessment of insulation system in power transformers. in 2008 International Conference on Condition Monitoring and Diagnosis 1354–1357 (IEEE, 2008).
  • 8.Husain E., & Mohsin, M. Transformer insulation condition monitoring using artificial neural network. in ICSD’01. Proceedings of the 20001 IEEE 7th International Conference on Solid Dielectrics (Cat. No. 01CH37117) 295–298 (IEEE, 2001).
  • 9.Nezami M, Equbal M, Khan SA, Sohail S, Ghoneim SS. Classification of cellulosic insulation state based on smart life prediction approach (SLPA) Processes. 2021;9(6):981. doi: 10.3390/pr9060981. [DOI] [Google Scholar]
  • 10.Sameh, W., Gad, A. H. & Eldebeikey, S. M. An intelligent classifier of electrical discharges in oil immersed power transformers. in 2019 21st International Middle East Power Systems Conference (MEPCON) 866–871 (IEEE, 2019).
  • 11.Ahmad A, Othman ML, Zainab KKB, Hizam H. Adaptive ANN based differential protective relay for reliable power transformer protection operation during energisation. IAES Int. J. Artif. Intell. 2019;8(4):307. [Google Scholar]
  • 12.Žarković M, Stojković Z. Analysis of artificial intelligence expert systems for power transformer condition monitoring and diagnostics. Electr. Power Syst. Res. 2017;149:125–136. doi: 10.1016/j.epsr.2017.04.025. [DOI] [Google Scholar]
  • 13.Abbasi AR. Fault detection and diagnosis in power transformers: a comprehensive review and classification of publications and methods. Electr. Power Syst. Res. 2022;209:107990. doi: 10.1016/j.epsr.2022.107990. [DOI] [Google Scholar]
  • 14.Thango, B., Moloi, K., Jordaan, J. & Nnnach, A. A further look into the service lifetime cost of solar photovoltaic energy transformers. in 2021 Southern African Universities Power Engineering Conference/Robotics and Mechatronics/Pattern Recognition Association of South Africa (SAUPEC/RobMech/PRASA) 1–7 (IEEE, 2021).
  • 15.Thango BA, Nnachi AF, Dlamini GA, Bokoro PN. A novel approach to assess power transformer winding conditions using regression analysis and frequency response measurements. Energies. 2022;15(7):2335. doi: 10.3390/en15072335. [DOI] [Google Scholar]
  • 16.Srividhya, V. et al. Determination of breakdown voltage for transformer oil testing using ANN. in Congress on Intelligent Systems 443–452 (Springer, 2020).
  • 17.de Andrade Lopes SM, Flauzino RA, Altafim RAC. Incipient fault diagnosis in power transformers by data-driven models with over-sampled dataset. Electr. Power Syst. Res. 2021;201:107519. doi: 10.1016/j.epsr.2021.107519. [DOI] [Google Scholar]
  • 18.Faiz J, Soleimani M. Assessment of computational intelligence and conventional dissolved gas analysis methods for transformer fault diagnosis. IEEE Trans. Dielectr. Electr. Insul. 2018;25(5):1798–1806. doi: 10.1109/TDEI.2018.007191. [DOI] [Google Scholar]
  • 19.Modi, M. M. & Patel, R. A. Intelligent approach to interpret incipient faults of power transformer from DGA database. J. Inst. Eng. (India) Ser. B 1–8 (2023).
  • 20.Ekojono, Prasojo RA, Apriyani ME, Rahmanto AN. Investigation on machine learning algorithms to support transformer dissolved gas analysis fault identification. Electr. Eng. 2022;104(5):3037–3047. doi: 10.1007/s00202-022-01532-5. [DOI] [Google Scholar]
  • 21.Barbosa FR, Almeida OM, Braga AP, Amora MA, Cartaxo SJ. Application of an artificial neural network in the use of physicochemical properties as a low cost proxy of power transformers DGA data. IEEE Trans. Dielectr. Electr. Insul. 2012;19(1):239–246. doi: 10.1109/TDEI.2012.6148524. [DOI] [Google Scholar]
  • 22.Zeinoddini-Meymand H, Kamel S, Khan B. An efficient approach with application of linear and nonlinear models for evaluation of power transformer health index. IEEE Access. 2021;9:150172–150186. doi: 10.1109/ACCESS.2021.3124845. [DOI] [Google Scholar]
  • 23.Barkas DA, Kaminaris SD, Kalkanis KK, Ioannidis GC, Psomopoulos CS. Condition assessment of power transformers through DGA measurements evaluation using adaptive algorithms and deep learning. Energies. 2022;16(1):54. doi: 10.3390/en16010054. [DOI] [Google Scholar]
  • 24.Sahoo, S., Chowdary, K. V. & Das, S. DGA and AI technique for fault diagnosis in distribution transformer. in International Conference on Emerging Trends and Advances in Electrical Engineering and Renewable Energy 35–46 (Springer, 2020).
  • 25.Tightiz L, Nasab MA, Yang H, Addeh A. An intelligent system based on optimized ANFIS and association rules for power transformer fault diagnosis. ISA Trans. 2020;103:63–74. doi: 10.1016/j.isatra.2020.03.022. [DOI] [PubMed] [Google Scholar]
  • 26.Saroja, S., Haseena, S. & Madavan, R. Dissolved gas analysis of transformer: An approach based on ML and MCDM. IEEE Trans. Dielectr. Electr. Insul. (2023).
  • 27.Hasan A, Singh A. Condition Monitoring of Distribution Transformer Using Machine Learning. Galgotias University; 2020. [Google Scholar]
  • 28.Meira, M., Carlucho, I., Álvarez, R., Catalano, L. & Acosta, G. DGA: A novel strategy for key gases identification in power transformers. in 2020 IEEE Electrical Insulation Conference (EIC) 290–293 (IEEE, 2020).
  • 29.Thango BA, Bokoro PN. Defining and specifying design considerations for distribution transformers in large-scale solar photovoltaic plants. Energies. 2022;15(8):2773. doi: 10.3390/en15082773. [DOI] [Google Scholar]
  • 30.Meira M, Ruschetti CR, Álvarez RE, Verucchi CJ. Power transformers monitoring based on electrical measurements: State of the art. IET Gener. Transmiss. Distrib. 2018;12(12):2805–2815. doi: 10.1049/iet-gtd.2017.2086. [DOI] [Google Scholar]
  • 31.Aciu A-M, Nicola C-I, Nicola M, Nițu M-C. Complementary analysis for DGA based on Duval methods and furan compounds using artificial neural networks. Energies. 2021;14(3):588. doi: 10.3390/en14030588. [DOI] [Google Scholar]
  • 32.Raj, N., Gopinath, D., Aryanandiny, B. & Pillai, S. Fuzzy logic-based spectroscopic analysis for condition assessment of distribution transformers. IEEE Trans. Ind. Appl. (2024).
  • 33.Thango, B., Akumu, A., Sikhosana, L., Nnachi, A. & Jordaan, J. Empirical based approaches to evaluating the residual life for oil-immersed transformers—A case study. in 2021 IEEE AFRICON 1–4 (IEEE, 2021).
  • 34.Gockenbach, E. & Borsi, H. Condition monitoring and diagnosis of power transformers. in 2008 International Conference on Condition Monitoring and Diagnosis 894–897 (IEEE, 2008).
  • 35.Chen W, Pan C, Yun Y, Liu Y. Wavelet networks in power transformers diagnosis using dissolved gas analysis. IEEE Trans. Power Deliv. 2008;24(1):187–194. doi: 10.1109/TPWRD.2008.2002974. [DOI] [Google Scholar]
  • 36.Cui QM, Cui ST, Guan ZY, Sun WT. Expert system based on ESTA and guide for condition evaluation of transformers. Adv. Mater. Res. 2012;347:306–309. [Google Scholar]
  • 37.Uljayev E, Ubaydullaev U, Narzullayev SN, Norboyev O. Application of expert systems for measuring the humidity of bulk materials. Int. J. Mechatron. Appl. Mech. 2021;1(9):131–137. [Google Scholar]
  • 38.Huang W, et al. A data mining approach for transformer failure rate modeling based on daily oil chromatographic data. IEEE Access. 2020;8:174009–174022. doi: 10.1109/ACCESS.2020.3026171. [DOI] [Google Scholar]
  • 39.Lian L. Reactive power optimization based on adaptive multi-objective optimization artificial immune algorithm. Ain Shams Eng. J. 2022;13(5):101677. doi: 10.1016/j.asej.2021.101677. [DOI] [Google Scholar]
  • 40.Zhang Y, Li J, Fan X, Liu J, Zhang H. Moisture prediction of transformer oil-immersed polymer insulation by applying a support vector machine combined with a genetic algorithm. Polymers. 2020;12(7):1579. doi: 10.3390/polym12071579. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 41.Malik H, Sharma R, Mishra S. Fuzzy reinforcement learning based intelligent classifier for power transformer faults. ISA Trans. 2020;101:390–398. doi: 10.1016/j.isatra.2020.01.016. [DOI] [PubMed] [Google Scholar]
  • 42.Liu J, Zhang H, Geng C, Fan X, Zhang Y. Aging assessment model of transformer insulation based on furfural indicator under different oil/pressboard ratios and oil change. IEEE Trans. Dielectr. Electr. Insul. 2021;28(3):1061–1069. doi: 10.1109/TDEI.2021.009530. [DOI] [Google Scholar]
  • 43.Oria C, Méndez C, Carrascal I, Ortiz A, Ferreño D. Impact of the use of vegetable oil on the mechanical failure of the cellulosic insulation of continuously transposed conductors in power transformers. IEEE Trans. Dielectr. Electr. Insul. 2022;29(2):607–613. doi: 10.1109/TDEI.2022.3157936. [DOI] [Google Scholar]
  • 44.Chen Q, Li C, Cheng S, Sun W, Chi M, Zhang H. Study on aging assessment model of transformer cellulose insulation paper based on methanol in oil. IEEE Trans. Dielectr. Electr. Insul. 2022;29(2):591–598. [Google Scholar]
  • 45.Wu S, et al. Concentration prediction of polymer insulation aging indicator-alcohols in oil based on genetic algorithm-optimized support vector machines. Polymers. 2022;14(7):1449. doi: 10.3390/polym14071449. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 46.Ngwenyama M, Gitau MN. Discernment of transformer oil stray gassing anomalies using machine learning classification techniques. Sci. Rep. 2024;14(1):376. doi: 10.1038/s41598-023-50833-7. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 47.Commission I. Mineral oil-filled electrical equipment in service–Guidance on the interpretation of dissolved and free gases analysis. IEC. 2015;60599:2015. [Google Scholar]
  • 48.Force, C. T. Ageing of cellulose in mineral-oil insulated transformers. in CIGRE: Paris, France (2007).
  • 49.Nadolny, Z. Design and Optimization of Power Transformer Diagnostics. Vol 16, p 6466 (MDPI, 2023).
  • 50.Elok, N., Putri, R. I. & Priyadi, A. The remaining life of distribution transformer prediction by using neuro-wavelet method. Przeglad Elektrotechniczny99(2) (2023).
  • 51.Jin L, Kim D, Abu-Siada A. State-of-the-art review on asset management methodologies for oil-immersed power transformers. Electr. Power Syst. Res. 2023;218:109194. doi: 10.1016/j.epsr.2023.109194. [DOI] [Google Scholar]
  • 52.Zhang, W. et al. Residual lifetime evaluation of power transformers based on data fusion and wiener model. IEEE Trans. Power Deliv. (2023).
  • 53.Zhang, W. et al. Influence of operational defects and hotspot temperature on methanol concentration in transformer oil. IEEE Trans. Power Deliv. (2022).
  • 54.Fan J, Wang F, Sun Q, Bin F, Ye H, Liu Y. An online monitoring system for oil immersed power transformer based on SnO2 GC detector with a new quantification approach. IEEE Sens. J. 2017;17(20):6662–6671. doi: 10.1109/JSEN.2017.2734072. [DOI] [Google Scholar]
  • 55.Rodriguez-Celis E, Duchesne S, Jalbert J, Ryadi M. Understanding ethanol versus methanol formation from insulating paper in power transformers. Cellulose. 2015;22:3225–3236. doi: 10.1007/s10570-015-0693-0. [DOI] [Google Scholar]
  • 56.Mi, X., Subramani, G. & Chan, M. The application of RBF neural network optimized by K-means and genetic-backpropagation in fault diagnosis of power transformer. In E3S Web of Conferences Vol. 242, p. 03002 (EDP Sciences, 2021).
  • 57.Yang X, Chen W, Li A, Yang C, Xie Z, Dong H. BA-PNN-based methods for power transformer fault diagnosis. Adv. Eng. Informat. 2019;39:178–185. doi: 10.1016/j.aei.2019.01.001. [DOI] [Google Scholar]
  • 58.Wang, Z., Xue, Z. & Liang, Y. Application of counter propagation network in fault diagnosis of power transformer. in 2009 International Conference on Artificial Intelligence and Computational Intelligence vol. 2, pp. 490–492 (IEEE, 2009).
  • 59.Bare, C. E. & Merritt, S. Y. Methanol as an ageing marker for in service transformers. in 2017 Annual Pulp, Paper And Forest Industries Technical Conference (PPFIC), 1–7 (IEEE, 2017).
  • 60.Rokani V, Kaminaris SD, Karaisas P, Kaminaris D. Power transformer fault diagnosis using neural network optimization techniques. Mathematics. 2023;11(22):4693. doi: 10.3390/math11224693. [DOI] [Google Scholar]
  • 61.Diefenthäler, A. T., Sausen, A. T., De Campos, M., Sausen, P. S. & Lenz, J. M. Artificial neural networks: Modeling and comparison to detect high impedance faults. IEEE Access (2023).
  • 62.Chabert A, Bakkay M, Schweitzer P, Weber S, Andrea J. A transformer neural network for AC series arc-fault detection. Eng. Appl. Artif. Intell. 2023;125:106651. doi: 10.1016/j.engappai.2023.106651. [DOI] [Google Scholar]
  • 63.Parvin, F., Faiz, J., Qi, Y., Kalhor, A. & Akin, B. A comprehensive inter-turn fault severity diagnosis method for permanent magnet synchronous motors based on transformer neural networks. IEEE Trans. Ind. Informat. (2023).
  • 64.Malik, I. M., Sharma, A. & Naayagi, R. T. A comprehensive and practical method for transformer fault analysis with historical data trend using Fuzzy logic. IEEE Trans. Dielectr. Electr. Insul. (2023).
  • 65.Kim M-S, An J-G, Oh Y-S, Lim S-I, Kwak D-H, Song J-U. A method for fault section identification of distribution networks based on validation of fault indicators using artificial neural network. Energies. 2023;16(14):5397. doi: 10.3390/en16145397. [DOI] [Google Scholar]
  • 66.Rao S, Zou G, Yang S, Khan SA. Fault diagnosis of power transformers using ANN and SMOTE algorithm. Int. J. Appl. Electromagn. Mech. 2022;70(4):345–355. doi: 10.3233/JAE-210227. [DOI] [Google Scholar]
  • 67.Bhalla D, Bansal RK, Gupta HO. Function analysis based rule extraction from artificial neural networks for transformer incipient fault diagnosis. Int. J. Electr. Power Energy Syst. 2012;43(1):1196–1203. doi: 10.1016/j.ijepes.2012.06.042. [DOI] [Google Scholar]
  • 68.Alabbawi AAM, Alnaib II, Al OSA-DY, Mohammed KK. Faults detection, location, and classification of the elements in the power system using intelligent algorithm. Bull. Electr. Eng. Informat. 2023;12(2):597–607. doi: 10.11591/eei.v12i2.4456. [DOI] [Google Scholar]
  • 69.Wang, L., Littler, T. & Liu, X. Dynamic incipient fault forecasting for power transformers using an LSTM model. IEEE Trans. Dielectr. Electr. Insul. (2023).
  • 70.Li S, Li X, Cui Y, Li H. Review of transformer health index from the perspective of survivability and condition assessment. Electronics. 2023;12(11):2407. doi: 10.3390/electronics12112407. [DOI] [Google Scholar]
  • 71.Padmanaban, S., Khalili, M., Nasab, M. A., Zand, M., Shamim, A. G. & Khan, B. Determination of power transformers health index using parameters affecting the transformer’s life. IETE J. Res. 1–22 (2022).
  • 72.Han X, Huang S, Zhang X, Zhu Y, An G, Du Z. A transformer condition recognition method based on dissolved gas analysis features selection and multiple models fusion. Eng. Appl. Artif. Intell. 2023;123:106518. doi: 10.1016/j.engappai.2023.106518. [DOI] [Google Scholar]
  • 73.Ballal MS, Wath MG, Suryawanshi HM. Measurement current transformer error compensation by ANN methodology. J. Inst. Eng. India Ser. B. 2020;101:261–271. doi: 10.1007/s40031-020-00454-9. [DOI] [Google Scholar]
  • 74.Mandlik M, Ramu T. Moisture aided degradation of oil impregnated paper insulation in power transformers. IEEE Trans. Dielectr. Electr. Insul. 2014;21(1):186–193. doi: 10.1109/TDEI.2013.004186. [DOI] [Google Scholar]
  • 75.Pahlavanpour, B., Eklund, M. & Sundkvist, K. Revised IEC standard for maintenance of in-service insulating oil. In Weidmann Third Annual Technical Conference (2004).
  • 76.Seghir, M., Seghier, T., Zegnini, B. & Rabhi, A. Breakdown Voltage Measurement in Insulating Oil of Transformer According to IEC Standards. In Proceedings of the 2nd International Conference on Electronic Engineering and Renewable Energy Systems: ICEERE 2020, 13-15 April 2020, Saidia, Morocco 543–551. (Springer, 2021).
  • 77.Tlhabologo BA, Samikannu R, Mosalaosi M. Alternative liquid dielectrics in power transformer insulation: A review. Indones. J. Electr. Eng. Comput. Sci. 2021;23(3):1761–1777. [Google Scholar]
  • 78.Atanasova-Höhlein I. IEC 60296 (Ed. 5)–a standard for classification of mineral insulating oil on performance and not on the origin. Transf. Mag. 2021;8(1):86–91. [Google Scholar]
  • 79.Safiddine L, Hadj-Ziane Zafour A, Fofana I, Skender A, Guerbas F, Boucherit A. Transformer oil reclamation by combining several strategies enhanced by the use of four adsorbents. IET Gener. Transmiss. Distrib. 2017;11(11):2912–2920. doi: 10.1049/iet-gtd.2016.1995. [DOI] [Google Scholar]
  • 80.da Silva, L. M., da Silva Júnior, M. M. & Galdeano, C. A. Evaluation of the corrosion potential of mineral insulating oil through ASTM D 1275 and gas chromatography with ECD based on IEC TR 62697-3 before and after proposed oil treatment process. in 2020 8th International Conference on Condition Monitoring and Diagnosis (CMD) 141–144 (IEEE, 2020).
  • 81.Kanumuri D, Sharma V, Rahi O. Analysis using various approaches for residual life estimation of power transformers. Int. J. Electr. Eng. Informat. 2019;11(2):389–407. doi: 10.15676/ijeei.2019.11.2.11. [DOI] [Google Scholar]
  • 82.Mariprasath T, Kishore P, Padmavathi M. Feasibility analysis of new green liquid dielectrics for transformers. Green Mater. 2023;40:1–5. [Google Scholar]
  • 83.Duval M, DePabla A. Interpretation of gas-in-oil analysis using new IEC publication 60599 and IEC TC 10 databases. IEEE Electr. Insul. Mag. 2001;17(2):31–41. doi: 10.1109/57.917529. [DOI] [Google Scholar]
  • 84.Irungu, G. K., Akumu, A. O. & Munda, J. L. Comparison of IEC 60599 gas ratios and an integrated fuzzy-evidential reasoning approach in fault identification using dissolved gas analysis. in 2016 51st International Universities Power Engineering Conference (UPEC) 1–6 (IEEE, 2016).
  • 85.Miranda V, Castro ARG. Improving the IEC table for transformer failure diagnosis with knowledge extraction from neural networks. IEEE Trans. Power Deliv. 2005;20(4):2509–2516. doi: 10.1109/TPWRD.2005.855423. [DOI] [Google Scholar]
  • 86.Liu, B., Takahashi, Y., Fujiwara, K. & Imamori, S. Stray loss evaluation of power transformers using simplified air-core model with tank and frame. IEEE Trans. Magn. (2023).
  • 87.Pan Y, Han S, Zhou C, Guo X. On switching transient modeling and analysis of electronic on-load tap-changers based Sen transformer. Int. J. Electr. Power Energy Syst. 2021;130:107024. doi: 10.1016/j.ijepes.2021.107024. [DOI] [Google Scholar]
  • 88.Yayan U, Yılmaz O. Overcoming hurdles: Challenges in testing and validating wind turbine transformers with electronic tap changers. Transf. Mag. 2023;10(4):92–99. [Google Scholar]
  • 89.Jin L, Kim D, Abu-Siada A, Kumar S. Oil-immersed power transformer condition monitoring methodologies: A review. Energies. 2022;15(9):3379. doi: 10.3390/en15093379. [DOI] [Google Scholar]
  • 90.Riedmann C, Schichler U, Hausler W, Neuhold W. Gas losses in transformers-influences and consideration. IEEE Access. 2023;11:58654–58663. doi: 10.1109/ACCESS.2023.3285413. [DOI] [Google Scholar]
  • 91.Ch HB, Mariprasath T, Kiran SR, Murali M. An experimental analysis of degradation of cellulosic insulating material immersed in natural ester oil for transformer. ECS Trans. 2022;107(1):18957. doi: 10.1149/10701.18957ecst. [DOI] [Google Scholar]
  • 92.Chothani, N., Raichura, M. & Patel, D. An Overview of the Protection of Power Transformers. Adv. Power Transf. Infrastruct. Digit. Protect. 27–69 (2023).
  • 93.Rangel Bessa A, Farias Fardin J, Marques Ciarelli P, Frizera Encarnação L. Conventional dissolved gases analysis in power transformers. Energies. 2023;16(21):7219. doi: 10.3390/en16217219. [DOI] [Google Scholar]
  • 94.Sharifi, A., Kuhnke, M., Werle, P. & Akbari, A. The limitations of Arc detection using semiconductive light sensing elements inside the transformer tank. In 2023 13th International Conference on Power, Energy and Electrical Engineering (CPEEE) 88–92 (IEEE, 2023).
  • 95.Chavhan SG, Dongre KA. Fault detection using ann and wavelet transform for power transformer. EPRA Int. J. Multidiscip. Res. (IJMR) 2022;8(2):181–187. [Google Scholar]
  • 96.Jan, B., Parveen, S. & Khan, S. A. ANN based multi-stage binary classification technique for incipient fault diagnosis of oil immersed transformer. In 2022 International Conference on Industry 4.0 Technology (I4Tech) 1–6 (IEEE, 2022).
  • 97.Zhang Y, Tang Y, Liu Y, Liang Z. Fault diagnosis of transformer using artificial intelligence: A review. Front. Energy Res. 2022;10:1006474. doi: 10.3389/fenrg.2022.1006474. [DOI] [Google Scholar]
  • 98.Chavhan SG, Dongre KA. Review on fault detection using ANN and wavelet transform for power transformer. EPRA Int. J. Multidiscip. Res. (IJMR) 2022;8(2):161–163. [Google Scholar]
  • 99.Wani SA, Rana AS, Sohail S, Rahman O, Parveen S, Khan SA. Advances in DGA based condition monitoring of transformers: A review. Renew. Sustain. Energy Rev. 2021;149:111347. doi: 10.1016/j.rser.2021.111347. [DOI] [Google Scholar]
  • 100.Taha IB, Ibrahim S, Mansour D-EA. Power transformer fault diagnosis based on DGA using a convolutional neural network with noise in measurements. IEEE Access. 2021;9:111162–111170. doi: 10.1109/ACCESS.2021.3102415. [DOI] [Google Scholar]
  • 101.Rao UM, Fofana I, Rajesh K, Picher P. Identification and application of machine learning algorithms for transformer dissolved gas analysis. IEEE Trans. Dielectr. Electr. Insul. 2021;28(5):1828–1835. doi: 10.1109/TDEI.2021.009770. [DOI] [Google Scholar]
  • 102.Dwiputranto, T. H., Setiawan, N. A. & Adji, T. B. DGA-based early transformer fault detection using GA-optimized ANN. In 2021 International Conference on Technology and Policy in Energy and Electric Power (ICT-PEP) 342–347 (IEEE, 2021).
  • 103.Benmahamed Y, Kherif O, Teguar M, Boubakeur A, Ghoneim SS. Accuracy improvement of transformer faults diagnostic based on DGA data using SVM-BA classifier. Energies. 2021;14(10):2970. doi: 10.3390/en14102970. [DOI] [Google Scholar]
  • 104.Mohamed SH, Bakar AHA, Ali MS. Comparative study of DGA for transformer service life. Int. J. Renew. Energy Resour. 2021;11(1):13–26. [Google Scholar]
  • 105.Wang J, Zhang X, Liu L, Wang Z. Dissolved gas analysis in transformer oil using Ni-doped GaN monolayer: A DFT study. Superlattices Microstruct. 2021;159:107055. doi: 10.1016/j.spmi.2021.107055. [DOI] [Google Scholar]
  • 106.Ali MS, Omar A, Jaafar ASA, Mohamed SH. Conventional methods of dissolved gas analysis using oil-immersed power transformer for fault diagnosis: A review. Electr. Power Syst. Res. 2023;216:109064. doi: 10.1016/j.epsr.2022.109064. [DOI] [Google Scholar]
  • 107.Buchacz T, Buchacz J, Duval M. Stray gassing of oil in HV transformers. IEEE Trans. Dielectr. Electr. Insul. 2021;28(5):1729–1734. doi: 10.1109/TDEI.2021.009520. [DOI] [Google Scholar]
  • 108.Sudrajad, G. A., Suwarno, S. & Prasojo, R. A. Health Index prediction using Artificial Neural Network (ANN) on historical data of power transformer. In 2023 IEEE 3rd International Conference in Power Engineering Applications (ICPEA) 239–242 (IEEE, 2023).
  • 109.Alqudsi A, El-Hag A. Application of machine learning in transformer health index prediction. Energies. 2019;12(14):2694. doi: 10.3390/en12142694. [DOI] [Google Scholar]
  • 110.Taha IB. Power transformers health index enhancement based on convolutional neural network after applying imbalanced-data oversampling. Electronics. 2023;12(11):2405. doi: 10.3390/electronics12112405. [DOI] [Google Scholar]
  • 111.Zeng W, et al. Hybrid CEEMDAN-DBN-ELM for online DGA serials and transformer status forecasting. Electr. Power Syst. Res. 2023;217:109176. doi: 10.1016/j.epsr.2023.109176. [DOI] [Google Scholar]
  • 112.Islam N, et al. Power transformer health condition evaluation: A deep generative model aided intelligent framework. Electr. Power Syst. Res. 2023;218:109201. doi: 10.1016/j.epsr.2023.109201. [DOI] [Google Scholar]
  • 113.Soni R, Mehta B. A review on transformer condition monitoring with critical investigation of mineral oil and alternate dielectric fluids. Electr. Power Syst. Res. 2023;214:108954. doi: 10.1016/j.epsr.2022.108954. [DOI] [Google Scholar]
  • 114.Adekunle AA, Oparanti SO, Fofana I. Performance assessment of cellulose paper impregnated in nanofluid for power transformer insulation application: A review. Energies. 2023;16(4):2002. doi: 10.3390/en16042002. [DOI] [Google Scholar]
  • 115.Tang C, Chen R, Zhang J, Peng X, Chen B, Zhang L. A review on the research progress and future development of nano-modified cellulose insulation paper. IET Nanodielectr. 2022;5(2):63–84. doi: 10.1049/nde2.12032. [DOI] [Google Scholar]
  • 116.Abd Aziz AM, Talib MA, Abidin AF, Al Junid SAM. Development of power transformer health index assessment using feedforward neural network. J. Adv. Res. Appl. Sci. Eng. Technol. 2023;30(3):276–289. [Google Scholar]
  • 117.Kucuk I, Derebasi N. Prediction of power losses in transformer cores using feed forward neural network and genetic algorithm. Measurement. 2006;39(7):605–611. doi: 10.1016/j.measurement.2006.02.001. [DOI] [Google Scholar]
  • 118.Balaga H, Gupta N, Vishwakarma DN. GA trained parallel hidden layered ANN based differential protection of three phase power transformer. Int. J. Electr Power Energy Syst. 2015;67:286–297. doi: 10.1016/j.ijepes.2014.11.028. [DOI] [Google Scholar]
  • 119.Shankar, B. B., Bhat, H., Poornima, S., Bharanidharan, R., Sridharan, M. & Banik, A. Conventional protection of power transformers at distribution grid side using artificial neural network. In 2023 Second International Conference on Electronics and Renewable Systems (ICEARS) 901–906 (IEEE, 2023).
  • 120.Čerkezović, E., Konjić, T., & Tešanović, M. Evaluation of losses in power transformer using artificial neural network. In Advanced Technologies, Systems, and Applications III: Proceedings of the International Symposium on Innovative and Interdisciplinary Applications of Advanced Technologies (IAT) Vol. 2, pp. 396–404 (Springer International Publishing, 2019).
  • 121.Poonnoy, N., Suwanasri, C., & Suwanasri, T. Artificial neural network for STEM-ED in power transformer failure investigation based on power utility practice. In 2023 8th International STEM Education Conference (iSTEM-Ed) 1–4 (IEEE, 2023).
  • 122.Li Q, Yu M. Achieving sales forecasting with higher accuracy and efficiency: A new model based on modified transformer. J. Theoret. Appl. Electron. Commerce Res. 2023;18(4):1990–2006. doi: 10.3390/jtaer18040100. [DOI] [Google Scholar]
  • 123.Taha IB, Mansour D. Novel power transformer fault diagnosis using optimized machine learning methods. Intell. Autom. Soft Comput. 2021;28(3):739–752. doi: 10.32604/iasc.2021.017703. [DOI] [Google Scholar]
  • 124.Li S, Wu G, Gao B, Hao C, Xin D, Yin X. Interpretation of DGA for transformer fault diagnosis with complementary SaE-ELM and arctangent transform. IEEE Trans. Dielectr. Electr. Insul. 2016;23(1):586–595. doi: 10.1109/TDEI.2015.005410. [DOI] [Google Scholar]
  • 125.Spressola, F. E., Roman, Z., Oliveira, R. G., Lagos, F. M. & Neto, E. T. W. Aging of oil-impregnated paper high voltage current transformers: Long duration test and lifespan estimation. IEEE Trans. Dielectr. Electr. Insul. (2023).
  • 126.Kharezy M, Mirzaei HR, Thiringer T, Serdyuk YV. Green solution for insulation system of a medium frequency high voltage transformer for an offshore wind farm. Energies. 2022;15(6):1998. doi: 10.3390/en15061998. [DOI] [Google Scholar]
  • 127.Patekar, K. D. & Chaudhry, B. DGA analysis of transformer using Artificial neutral network to improve reliability in power transformers. in 2019 IEEE 4th International Conference on Condition Assessment Techniques in Electrical Systems (CATCON) 1–5 (IEEE, 2019).
  • 128.Mousavi SA, Hekmati A, Sedighizadeh M, Bigdeli M, Bazargan A. ANN based temperature compensation for variations in polarization and depolarization current measurements in transformer. Therm. Sci. Eng. Progr. 2020;20:100671. doi: 10.1016/j.tsep.2020.100671. [DOI] [Google Scholar]
  • 129.Nurcahyanto, H., Nainggolan, J. M., Ardita, I. M. & Hudaya, C. Analysis of power transformer’s lifetime using health index transformer method based on artificial neural network modelling. in 2019 International Conference on Electrical Engineering and Informatics (ICEEI) 574–579 (IEEE, 2019).
  • 130.Li Z, Jiao Z, He A. Knowledge-based artificial neural network for power transformer protection. IET Gener. Transmiss. Distrib. 2020;14(24):5782–5791. doi: 10.1049/iet-gtd.2020.0542. [DOI] [Google Scholar]
  • 131.Aciu, A.-M., Nițu, M. C., Nicola, M. & Nicola, C.-I. Determination of the condition of solid insulation in high-power transformers based on 2-furfuraldehyde and methanol markers using neural networks. in 2021 International Conference on Electromechanical and Energy Systems (SIELMEN) 175–180 (IEEE, 2021).
  • 132.Kes M, Christensen BE. Degradation of cellulosic insulation in power transformers: A SEC–MALLS study of artificially aged transformer papers. Cellulose. 2013;20:2003–2011. doi: 10.1007/s10570-013-9963-x. [DOI] [Google Scholar]
  • 133.Draper, Z. H., Dukarm, J. J. & Beauchemin, C. How to Improve IEEE C57. 104–2019 DGA Fault Severity Interpretation. in 2022 IEEE/PES Transmission and Distribution Conference and Exposition (T&D) 1–5 (IEEE, 2022).

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Data Availability Statement

The data that support the findings of this study are available from the corresponding author upon reasonable request.


Articles from Scientific Reports are provided here courtesy of Nature Publishing Group

RESOURCES