. 2024 Sep 4;14:20571. doi: 10.1038/s41598-024-70063-9

Optimal techno-economic assessment of isolated microgrid integrated with fast charging stations using radial basis deep learning

Abdelmonem Draz 1,, Ahmed M Othman 1, Attia A El-Fergany 1
PMCID: PMC11375120  PMID: 39232001

Abstract

The global transportation electrification commerce sector is now booming. Stakeholders are paying an increased attention to the integration of electric vehicles and electric buses into  the transportation networks. As a result, there is an urgent need to invest in public charging infrastructure, particularly for fast charging facilities. Consequently, and to complete the portfolio of the green environment, these fast-charging stations (FCSs) are designed using 100% of renewable energy sources (RESs). Thus, this paper proposes an optimization model for the techno-economic assessment of FCSs comprising photovoltaic and wind turbines with various energy storage devices (ESDs). In this regard, the FCS performance is evaluated using flywheels and super capacitors due to their high-power density and charging/discharging cycles and rates. Then, optimal sizing of these distributed generators is attained considering diverse technical and economical key performance indicators. Afterwards, the problem gets more sophisticated by investigating the effect of RES’s uncertainties on the selection criterion of the FCS’s components, design and capacity. Eventually, as an effort dedicated to an online energy management approach, a deep learning methodology based on radial basis network (RBN) is implemented, validated, and carried out. In stark contrast to conventional optimization approaches, RBN demonstrates its superiority by obtaining the optimum solutions in a relatively short amount of time.

Keywords: Fast charging stations, Electric vehicles, Renewable energy sources, Energy storage systems, Microgrids, Energy management strategies

Subject terms: Electrical and electronic engineering, Energy grids and networks

Introduction

Motivation

Negative environmental impacts of fossil fuel sources besides their high energy costs are considered as the main motivators for developing sustainable energy1,2. In order to minimize carbon emissions and operating costs, micro grids (MGs) are equipped with energy management systems which perform economic dispatch and unit commitment processes3,4. MGs utilize the concept of decentralized generation in which the load demand is met by various types of renewable energy sources (RESs) and energy storage devices (ESDs)57. Distributed generators (DGs) as revealed in Fig. 1 can be classified as dispatchable sources when the generation is controlled to meet the demand or non-dispatchable when the generation is uncontrolled. Non-dispatchable DGs are weather-dependent sources that are intermittent in nature which in turn brings out the need for installing ESDs such as batteries or super capacitors (SCs)8,9. It is worth mentioning that the selection of non-dispatchable sources relies on meteorological data such as temperature, solar radiation, and wind speed10,11. It is worth noting that flywheels and SCs are characterized by fast discharging rates as declared in Fig. 2 that make them the favorable options in fast charging stations (FCSs) due to their high-power density. Moreover, the usage of batteries will not be applicable if the recharge time exceeds a certain limit as revealed in Fig. 2.

Figure 1.

Figure 1

Architecture of Microgrids.

Figure 2.

Figure 2

Charging /discharging characteristics of ESDs.

Due to the emissions produced by conventional gasoline vehicles, they are replaced by electric vehicles (EVs) as an environmentally friendly solution12,13. However, the deployment of EVs fleet across roadways attracts the attention of utility operators for the implementation of public charging infrastructures14. FCSs represent the widespread solution in highways for customer’s satisfaction15,16 although they bring technical and economic issues17. Power quality, voltage stability, and overloading problems are samples of the technical challenges facing the utility’s planners18. This is due to the fact that FCSs are rapacious burdens on the electric network because of demanding huge power in very short time duration19,20. FCSs may be deemed as hybrid renewable microgrid (HRMG) comprising various forms of ESDs operating either in an on-grid mode or off-grid mode to complete the portfolio of sustainable environment21.

Literature survey

A novel framework is introduced in22 for the optimal energy management in MGs in which the spatial temporal of energy exchange between EVs is considered. Moreover, with the aid of V2G technology, the charging price and dispatch are optimized using the chance constrained optimizer along with the deep Q-learning network. Utilizing the principles of electricity time of use in addition to real time pricing in23 are beneficial in the demand side management of MG with different types of RESs. A combination of batteries and SCs is exploited in24 to regulate the voltage in DC MG regardless of the intermittent nature of RESs or load variations. Excess electricity problem or the unused surplus power in hybrid renewable off-grid networks is investigated in25 using various approaches which aid in the development of this MG configuration. It is worth noting that technical, economic, environmental, and social constraints are incorporated in the optimization framework addressed in26 for energy dispatch in HRMG supplying residential and telecommunication loads.

The investigated methodology in27 deals with stand-alone HRMG network comprising thermal energy storage systems (ESSs). The obtained results manifest the superiority of implementing recover exhaust heat system over the baseline scenario without any thermal energy storage. In addition, a generalized model based on the demand response program is employed in28 for minimizing the MG operating cost and CO2 emissions. Afterwards, employing data driven programming with multilayer perceptron in restoring the non-linearity feature in energy conversion components is explored. The proposed methodology in29 with the aid of load forecasting techniques enhances the sustainability of the HRMG system by determining the accurate capacities of DGs. Fuzzy-based forecasting followed by multi-criteria decision approach is utilized in ranking the optimal solutions considering diverse performance indicators.

Multi-objective optimization algorithms are interrogated in30 for optimal allocation and sizing of DGs with battery storage system (BSS) to reinforce the voltage stability and lessen the yearly expenses. In31, the formulation of configuration optimization model is proposed to reduce the investment cost using multiple forms of ESDs. In32, various optimizers are discussed for optimal designing of HRMG considering technical, environmental, and economical objectives. In this context, the net present cost NPC, loss of power supply probability (LPSP), and greenhouse gas GHG emissions are deemed as the main aspects in this multi-objective optimization framework. Smart energy management approach in HRMG with BSS is presented in33 using the modified frog leaping optimizer for different cases. Furthermore, the performance Chameleon Swarm Optimizer (CSO) is examined in34 for optimally design and sizing of stand-alone HRMG minimizing the NPC along with attaining the reliability constraint in terms of LPSP. In this regard, HOMER software is employed in35 investigating technical, economical, and social constraints.

Uncertainty in weather conditions have been tackled in36 for optimal sizing of grid connected HRMG fulfilling power quality requirements in terms of harmonics mitigation and power factor correction. In this context, particle swarm optimizer (PSO) is utilized in37 for voltage enhancement besides power losses alleviation in radial rural electric power grid. In addition, unmet load fraction UMLf constraint is addressed in38 using HOMER software achieving the lowest NPC and GHG emissions using various combinations of RESs. Synergy of these forms of RESs is investigated in39 for optimal operation strategy of HRMG participating in energy markets: electricity and hydrogen markets. In40, diverse control strategies such as load following (LF), cycle charging (CC) are examined to decide the selection between fuel cell (FC) and BSS at each time step to minimize the total NPC.

Biological inspired optimizer (BIO) is implemented and compared with various algorithms in41 for optimal design of an off-grid wind turbine (WT) comprising hydrogen energy storage (HES) systems. This optimization framework is analyzed with sensitivity analysis based on two objectives namely system cost and load losses. In42, a novel energy management strategy with deploying onsite electrolysers and HES systems equipped with photovoltaic (PV) panels is interrogated for supplying FC EVs, while43 presents a comprehensive review of the techniques implemented in the proposed dilemma. The optimal design of electric vehicle charging station in44 along with techno economic assessment of HRMG in Egypt in45 represent gateways in the preparation of this paper. Additionally, components and specifications of FCSs are summarized in46 to augment the literature survey of this research.

Research gap, paper organization, and contribution

Most of the literature deals with the conventional HRMG comprising PV, WTs, and BSS supplying residential, commercial, or industrial loads. In addition, this optimization dilemma is solved using various metaheuristic-based optimizers considering various operational scenarios. In this context, Table 1 announces a brief comparison between various HRMG configurations discussed previously in the literature. It can be highlighted that the MG topology comprises PV, WT, BSS, HES, FC, or diesel generators for typical installed buildings or regions. However, implementation of ESDs such as SCs and flywheels for electrified transportation loads in the energy management dilemma still acquires more attention. Moreover, deep learning-based tools have not been utilized so far in these optimization processes to alleviate the larger computational time of optimization algorithms. Therefore, the contribution of this research can be summarized as follows:

Table 1.

Summary of HRMG projects discussed in the literature.

Reference Year MG topology Optimizer Application Location Remarks
34 2023 PV/WT/Tidal/BSS/HES CSO Rural region in Fuxin China Economic and reliability constraints are addressed
37 2022 PV/WT/BSS PSO Rural grid of Guissia Cameroon BSS aids in power factor correction
38 2023 PV/WT/CHP/ESS HOMER Oakland university United States Results demonstrate the economical effectiveness of WT and CHP in off-grid mode
40 2022 PV/FC/BSS HOMER Students services center building United States Interference with MATLAB for control strategy optimization
41 2023 WT/HES BIO Residential load China Various designs of WTs are included
44 2022 PV/Diesel/BSS SSO Northwest region in Delhi India Design of electric vehicle charging station
45 2022 PV/WT/BSS/Diesel HOMER National research center farm Egypt Demand side management participates in peak shaving which in turns the oversizing is avoided
47 2021 PV/WT/BSS GWO Ras-Shaitan in Sinai Egypt Reliability is evaluated using LPSP index
48 2024 PV/WT/HES/BSS HOMER General - Sensitivity analysis of excess electricity
49 2024 PV/WT/HES/FC BIO Residential building China Sensitivity analysis of wind speed and interest rate
50 2024 PV/WT/BSS CPLEX Chinese Yuan China Battery lifetime model is incorporated
51 2024 WT/BSS HSO Typical power system China Various technologies of batteries
52 2024 PV/biomass/Diesel/BSS GPO New Tiba City Egypt Optimal configuration is cropped
53 2024 PV/WT/FC/BSS/HES AVO Marsa Matrouh Egypt V2G technology is considered
54 2024 PV/WT/BSS/Diesel HOMER Uttara University Bangladesh Various aspects have been investigated

*HSO harmony search optimizer, GPO gradient pelican optimizer, AVO african vultures optimizer.

  • Explore the performance of the HRMG in feeding new pattern of loads represented in EVs and electric buses(EBs).

  • Investigate the HRMG operation in public transportation networks acting as a FCS.

  • Incorporate various forms of ESDs such as BSS, SCs, and flywheels to earn the fast-charging feature to the HRMG.

  • Optimizing the HRMG configuration besides the component’s installed capacity in normal and fast charging operation modes.

  • Examine the quality of the optimized architecture in terms of different forms of technical and economical key performance indicators (KPIs).

  • Investigate the effect of uncertainties in renewables resources on the optimized solutions.

  • Utilizing a novel deep learning radial basis network in determining the operational capacity of the HRMG in online applications.

The organization of current research is summarized as follows; Section “Research Methodology” presents the research methodology for the technical and economic study and analysis, including the configuration, modeling and optimization. Section “Modelling of the HRMG” discusses the system modeling and mathematical representation for the problem statement. Section “Objective Function, Associated Constraints, and KPIs” focuses on the optimization process and formulation, where the fitness function with related constraints and performance indicators are structured. Afterwards, Section “Simulation Results and Discussions” consolidates the numerical analysis with operational results and scenarios. Finally, Section “Conclusions” concludes the work with some highlighting of the simulation results.

Research methodology

Techno-economic evaluation of HRMGs goes through dedicated steps starting from data collection till results extraction as shown in Fig. 3. These steps can be summarized as follows:

Figure 3.

Figure 3

Research Methodology in Steps.

Resources and load assessments

Assessments of renewable resources availability such as solar irradiation and wind speed are on-site measurements that depend on the project location. For sizing these RESs, load calculations are carried out for diverse categories like AC loads, DC loads, residential, commercial, industrial, and so on.

MG configuration

Based on the project location, nature, and resources availability, a combination of renewable and non-renewable DGs along with ESDs is implemented for a specific configuration of HRMG. The architecture of HRMG may be classified into three main categories; AC, DC, or hybrid configuration while it may be worked in on-grid or off-grid operating modes.

Mathematical modelling of HRMG

The power for each unit in the HRMG configuration is mathematically represented and estimated at each simulated time slot. Afterwards, these governing equations are incorporated into the optimization framework based on the selected sizing methodology.

Design parameters of HRMG

The chosen design parameters are crucial for a more reliable and effective solution. UMLf, LPSP, equivalent loss factor, and excess electricity portion EEP are considered as technical constraints. Economical constraints may take various forms such as NPC, annualized system cost ASC, and cost of energy CoE while GHG represent the widespread environmental factor.

Sizing methodologies of HRMG

Optimization or artificial intelligence techniques are implemented for optimal sizing and dispatching the generating and storage units. Moreover, multi-objective approach is exploited for this dilemma using pareto or fuzzy decision tools. In addition, commercial software is also employed like HOMER, HYBRIDS, and TRNSYS.

Energy management in HRMG

Proper energy management is substantial either in load or supply side for reliable and cost-effective operation of HRMG. Load side management comprises different forms like peak shaving, peak shifting, valley filling, and flexible load curve. On the other hand, some rules nominated as dispatch strategies are used to control the operation of generator and ESDs such as LF, CC, generator order, predictive strategy, and combined dispatch.

LF dispatch method operates the generator for load supplying when needed while RESs charge the storage bank. In this context, charging process of ESDs is the least priority in generator’s operation while RESs take over this mission. CC dispatch method enforces the diesel generator to run at its rated capacity regardless of the load value. Therefore, the surplus power is used to charge the storage batteries until they reach the maximum state of charge SoC level. CC dispatch technique is the best candidate whenever the resources of renewables are not adequate.

Modelling of the HRMG

Solar PV modelling

Generally, the PV is modelled by the equivalent circuit shown in Fig. 4 which consists of the photo-generated current Iph represented by a current source, diode D, series resistance Rs, and shunt resistance Rsh. In this regard, PV cell performance is evaluated by (current–voltage) and (power-voltage) characteristics as depicted in Fig. 5 with three governing points: open circuit voltage Voc, short circuit current Isc, and maximum power point Vmpp,Impp. These three points are stamped in the PV datasheet and nameplate which dominate the PV performance under various temperature and solar irradiation. The PV output current (IPV) may be estimated from (1) by calculating the shunt resistance current (Ish) and diode current (ID) from (2) and (3) respectively.

IPV=Iph-ID-Ish 1
Ish=VPV+IPVRsRsh 2
ID=IrseVPV+IPVRsnVT-1 3
VT=KTcq 4

where Irs denotes the diode reverse saturation current, n symbolizes the diode ideality factor, VT designates the thermal voltage that is assessed from (4) where K is the Boltzman constant = 1.3806503×10-23, q is the electron charge = 1.602×10-19C, and Tc is the cell temperature.

Figure 4.

Figure 4

Simplified equivalent circuit of PV model.

Figure 5.

Figure 5

PV cell characteristics. (a) Current v.s Voltage and (b) Power v.s Voltage.

The clearness index (CI) of the studied zone is estimated from (5) which depends on the portion of horizontal extra-terrestrial solar irradiation (Gh,av) and monthly available solar irradiation (Gav). The instantaneous cell temperature (Tct) is computed from (6) where NOCT stands for normal operating cell temperature while (Tambt,Gt) are the instantaneous ambient temperature and solar irradiation in W/m2 respectively. In this context, the instantaneous PV output power (PPVt) is calculated from (7) while the total output power (PTPVt) is calculated from (8) where (NPV) is the number of PV modules.

CI=GavGh,av 5
Tct=Tambt+NOCT-20800×G(t) 6
PPVt=VPVt×IPVt=PPV@STC1+kpTct-T@STC.FPV.G(t)G@STC 7
PTPVt=PPVt×NPV 8

where FPV is the cell derating factor and kp is the maximum power temperature coefficient, and PPV@STC, T@STC, G@STC denote the PV output power, cell temperature, and solar irradiation at Standard test conditions STC (25 0C, and 1000 W/m2).

Wind turbine modelling

Each WT has a typical power output curve as depicted in Fig. 6 which describes the relation between the output power and average wind speed. First, the measured wind speed by the anemometer shall be corrected to the hub height location as illustrated in (9).

Vh=Van×hhhanγ 9

where Van denotes the measured wind speed at the anemometer height while Vh is the calculated wind speed at the hub height, han and hh are the anemometer and hub height respectively, γ is the Hellmann coefficient or the roughness factor that ranges from 0.1 to 0.25 based on the investigated zone.

Figure 6.

Figure 6

WT power-speed curve.

The generic equation that correlates the instantaneous WT output power (PWTt) with the instantaneous wind speed at hub height (Vht) is given in (10). However, as declared in (11) and Fig. 6, the WT output power can be estimated according to the wind speed for three different operating regions. The output power equals zero when the wind speed is below the cut-in speed (vci) or excesses the cut-out speed (vco). Contrarily, the WT power remains constant at the rated power (Pr) between the rated speed (vr) and vco while it varies with the cubicle of wind speed in the region between vci and vr. Furthermore, the total output power (PTWTt) from (NWT) units is calculated from (12).

PWTt=0.5ρaAVh(t)3Cpηo 10
PWTt=0v(t)vci,v(t)vcoPrvt-3vci3vr3-vci3vci<v(t)<vrPrvr<v(t)<vco 11
PTWTt=PWTt×NWT 12

where ρa is the air density kg/m3, A is the rotor blades swept area, Cp is the WT power coefficient that varies between 0.3 to 0.5, ηo is the electro-mechanical conversion efficiency, and NWT is the number of WT units.

Batteries modelling

The charging process of the batteries bank is done through the surplus energy which comes from the increment of PV-WT generation at any time t during the simulation process as explained in (13), while in (14), the discharging process of the batteries bank occurs.

Ebattt=Ebattt-11-σ+Pexcess×ηcharge 13
Ebattt=Ebattt-11-σ-Pdefηdischarge 14

where Ebattt,Ebattt-1 are the stored energy of battery at time slot t and t-1 respectively, while σ denotes the self-discharge rate of the battery. Pexcess is the surplus power generated from RESs over the demand, while Pdef is the deferrable power in which the demand exceeds the generated power from RESs, and ηcharge,andηdischarge are charging and discharging efficiencies of the battery, respectively.

Afterwards, the minimum number of storage batteries (Nbatt) can be evaluated from (15) for more reliable HRMG operation.

Nbatt=AHCAHCr 15

where AHC is the required ampere hour capacity for the reliable operation which evaluated from (16) while AHCr is the rated capacity of the selected batteries model.

AHC=Eload×ndaysDoD×VB×ηs 16

where Eload denotes the load daily average energy kWh, ndays denotes the number of days in which the batteries bank is energized, DoD is the maximum depth of discharge, VB is the battery voltage, and ηs is the battery-inverter system efficiency. Furthermore, the battery autonomy is computed from (17) which is the ratio between the capacity of the batteries bank and the average daily electric load.

Tbatt,aut=AHC×VB×1-SoCminEload×1000 17

The battery lifetime throughput (Ebatt,life) is the amount of stored energy in kWh that the battery is expected to supply during its life time which can be calculated from (18). Therefore, the storage batteries need to be replaced after a specific number of failure cycles (Ncycles,f) as marked in the datasheet (Number of charging and discharging cycles that can be completed before losing performance).

Ebatt,life=Ncycles,f×DoD×AHCr×VB1000 18

Flywheels modelling

The kinetic energy stored in the rotating mass of the flywheel depends on the angular speed of rotation and moment of inertia as revealed in (19). As described in (20), the stored kinetic energy can be boosted by optimizing the rotor mass and shape in terms of rotor radius R and thickness t. Also, the required number of flywheel strings (NFW) for a stable operation is computed from (21).

Efw=12Jwfw2 19
Efw=π4ρrR4wfw2t 20
NFW=EfwEfwr 21

where Efw is the required and rated stored kinetic energy in the flywheel Joule, wfw denotes the rotational angular speed rad/s while J designates the moment of inertia kg.m2, ρr is the rotor mass density kg/m3.

Super capacitors modelling

SCs are characterized by high charging/discharging rates compared to storage batteries. The stored energy in SCs ESC depends on the capacitance value and applied voltage as revealed in (22). Hereinafter, the power required PSC of SCs is computed from (23) according to the discharging time tdis. Also, the required number of SCs strings (NSC) for a stable operation is computed from (24).

ESC=12CVSC2 22
PSC=ESCtdis 23
NSC=PSCPSCr 24

where C is the capacitance value of SC, VSC is the applied voltage across the SC terminals, and PSCr defines the rated power of the selected SC model.

Power converter modelling

As it is well known, the generated power from the WT is AC while it is DC from the PV. Moreover, storage batteries are connected through the DC bus while loads may be connected through AC or DC bus. Therefore, bi-directional power converter is used to link between AC and DC buses to execute the rectification or inversion process according to the MG configuration. In this context, the power converter is sized according to (25) knowing the peak load value and converter efficiency.

Pconv(t)=Pmax(t)ηconv 25

where Pconv(t) denotes the required converter power at time t, Pmax(t) signifies the load peak power at time t, and ηconv is the converter efficiency.

Objective function, associated constraints, and KPIs

HO@MER optimizer [HOMER Pro 3.14.2 https://homerenergy.com/] deploys a modified grid search methodology along with multi-criteria decision analysis to attain the best solution among a set of candidate solutions. It extracts the superior solution with the minimum value of net present cost (NPC)or CoE, i.e., optimization of configuration and number of renewables/storage units. Independent constraints NPV,NWT,Nbatt in addition to the dependent constraints EEP and capacity shortage factor (CSf) are also fulfilled.

Objective function

The purpose of the optimization process is to minimize the CoE as explained in (26) by minimizing the ASC which is splitted into three terms as declared in (27).

OF=MinCoE=MinASCTASL 26
ASC=ACC+ARC+AOMC-SC 27

where ACC signifies the annual capital cost, ARC denotes the annual replacement cost, AOMC designates the annual operation & maintenance cost, SC is a salvage value, while TASL is the total annual supplied load by the HRMG system.

In this context, ACC is calculated from (28) based on the project initial capital cost (ICC) and capital recovery factor (CRF(i,ny)) which evaluates the money worth as per (29).

ACC=ICC×CRF(i,ny) 28
CRF(i,ny)=i1+iny1+iny-1 29
i=ii-f1+f 30

It is worth mentioning that CRF depends on the real interest rate (i) and the project life time in years (ny). The real annual interest rate is calculated form (30) based on the nominal interest rate (ii) and annual inflation rate (f). On the other hand, ARC is calculated from (31) depending on the replacement cost (RC) in addition to the CRF. Moreover, SC is computed from (32) which represents the residual value of the component in the HRMG at the end of project life time.

ARC=CRF(i,ny)×nRRC1+itR 31
SC=RC×RLTCLT 32

where tR denotes the replacement time in years, nR is a counter for the number of replacements occurred during the project life time, RLT is the component remaining life at the end of the project life span, and CLT is the component life time in years. Since NPC is a cost-effective measure, HRMG configurations may be ranked based on their NPC values as declared in (33). It is calculated from the annual cost saving ACS which is the variance between ASC of the base system and ASC of the proposed HRMG system.

NPC=ACSCRF(i,ny) 33

Deep look to Eqs. (34), (35), and (36), various forms of cost functions utilized in ASC calculation can be computed based on the set of decision variables. Accordingly, the OF is reformulated comprising the rating of each individual component inside the FCS.

ICC=ICCWT×PTWT+ICCPV×PTPV+ICCbatt×Nbatt+ICCSC×NSC+ICCFW×NFW+ICCconv×Pconv 34
RC=RCWT×PTWT+RCPV×PTPV+RCbatt×Nbatt+RCSC×NSC+RCFW×NFW+RCconv×Pconv 35
AOMC=AOMCWT×PTWT+AOMCbatt×Nbatt+AOMCSC×NSC+AOMCFW×NFW 36

It is worth noting that the optimized variables of DGs are the total output power while they are number of strings in the case of ESDs.

Problem constraints

Set of inequality constraints are fulfilled to attain feasible solutions as indicated in (37)–(42). All optimized decision variables are bounded between lower and upper limits which are deemed as inputs to the optimizer. Moreover, the ESD SoC at any time during charging or discharging processes shall also be between minimum and maximum operating limits to prolong its life time as indicated in (43).

PTPVminPTPVPTPVmax 37
PTWTminPTWTPTWTmax 38
NbattminNbattNbattmax 39
NSCminNSCNSCmax 40
NFWminNFWNFWmax 41
PconvminPconvPconvmax 42
SoCminSoC(t)SoCmax 43

where PTPVmin,PTPVmax, PTWTmin,PTWTmax, Pconvmin, and Pconvmax represent the minimum and maximum values of the total output power from PV modules, WT modules, and converter respectively. Nbattmin,Nbattmax,NSCmin,NSCmax,NFWmin, and NFWmax represent the lower and upper limits of battery strings, SC strings, and flywheel strings, respectively.

Key performance indicators

Optimal solutions are also evaluated by KPIs which are classified into technical and economical indices that quantify the quality of the solution. Among these technical indicators is the UMLf which is calculated from (44) that expresses the total amount of demand that are not be supplied during the year. Furthermore, EEP is calculated through (45) which expresses the excess energy that shall be dumped to a thermal load as it cannot be employed to supply the original load or even charge the ESDs.

UMLf=EUMLEdemand,Edemand=Eload+Edef 44
EEP=EsurplusEproduction 45
CSf=ECSEdemand 46

where EUML,Esurplus, and Eproduction are the total un-met load, excess electric load, and production energy throughout the year, respectively in kWh/yr.

Certainly, Edemand is the total demand power that shall be provided by the HRMG to the load (Eload) and the deferrable energy (Edef). Moreover, the capacity shortage factor (CSf) is determined through (46) from the yearly energy capacity shortage (ECS) between the required and actual operating capacities. It is worth mentioning that there may be excess electricity on a bus and a capacity shortage on another bus if there is an undersized converter at any time slot.

As a measure of RESs effectiveness, the renewable fraction Rf is evaluated through (47) which indicates the energy fraction generated from RESs delivered to the load. In this context, the renewable penetration factor Rpen which is calculated through (48) refers to the ratio between the generated power from RESs Pren and the load power Pload at each time slot.

Rf=1-Enon-ren+Hnon-renEload+Hserved 47
Rpen=PrenPload 48

where Enon-ren, and Hnon-ren symbolize the non-renewable electrical and thermal production, respectively, while Hserved is the thermal load served by the year.

Among the various economic indicators, present worth Pw in ($) is assessed from (49) which aids in estimating the cash flow current value or a future payment. Afterwards, the annual worth Aw in $/yr is calculated from (50) which is the product of Pw and CRF(i,ny).

Pw=Fw11+iNp 49
Aw=Pw×CRF(i,ny) 50

where Fw is the future worth, and Np is the number of periods.

Another attribute of evaluating the investment’s profitability is the return on investment RoI which gives the ratio between the net income and investment as demonstrated in (51).

RoI=nACFref-ACFcurnACCcur-ACCref 51

where ACFref, and ACFcur are the annual cash flow of the reference and current system respectively, while ACCcur, and ACCref are the annual capital cost of the current and reference system respectively. Eventually, the general flow chart of the proposed mathematical model using HO@MER optimizer is demonstrated in Fig. 7. This flowchart illustrates the optimizer’s procedure regarding the operation strategy along with sizing methodology till cropping the final results.

Figure 7.

Figure 7

Flowchart of the proposed optimizer.

Simulation results and discussions

Project portfolio

BRT (Bus Rapid Transit) is a national project organized by the government in Egypt located in the Great Cairo’s Ring Road through 113 km highways. BRT will serve both EBs and EVs fleet across the Ring Road through the expansion from 4 to 7 lanes in each direction55. The scope of this research is to design a HRMG comprising PV, WT, BSS, SCs, and flywheel form techno-economic prospective in off-grid configuration. Four dispensers have been dedicated for simultaneous charging of EBs; two of them with rated power of 60 kW and two are 120 kW. Therefore, this research aims at developing a FCS feeding EBs fleet in addition to EVs along the Ring Road to encourage the drivers of private cars to replace their conventional gasoline cars with EVs.

Meteorological data

The site information (3005.5’N, 31011.8’E) regarding solar irradiation, wind speed, and temperature is obtained from NASA prediction of worldwide energy resources. The average values of solar irradiation, wind speed, and temperature are 5.35kWhm2/day, 5.56m/s, and 21.73C respectively in August 2023 based on the selected zone. Moreover, the detailed monthly meteorological data is clarified in Fig. 8.

Figure 8.

Figure 8

Site monthly meteorological data. (a) Temperature, (b)  Solar irradiation, (c) Clearness index and (d)  Wind speed.

EVs and EBs fleet data

Due to the spatial–temporal distribution of EVs, their load data is gathered from a survey of the Cairo’s Ring Road on a typical weekday56,57. Cairo’s Ring Road records about 213,000 cars passing through it every day; 80 of them are EVs with various capacities such as 24, 30, and 40 kWh58 recorded in 2023. However, EVs fleet data are expected to be doubled in 2040 as reported in59 which counts about 500,000 cars with 160 EVs that are included in this research and investigated as the load pattern. Accordingly, the optimized planned model is designed to serve Cairo’s Ring Road during the next 20 years. Moreover, the time congestion effect is considered as shown in Fig. 9a which indicates the peak traffic flow occurs between 2 and 6 pm and other time periods according to the lifestyle in Egypt60. Furthermore, the EBs fleet load data is shown in Fig. 9b which demonstrates that the charging process of the EBs fleet occurs between 1 and 8 am58,59.

Figure 9.

Figure 9

Daily load curve of EVs and EBs fleets across the Ring Road. (a) EVs fleet and (b) EBs fleet.

For accurate modelling of fleet load data, random variability factors shall be considered in time step variation and day-to-day variation. ktv defines the time step random variability factor, while kdv defines the day-to-day random variability factor. By this way, loading profiles of both EVs and EBs will be precisely modelled during the whole year. Based on the nature of the load and studied area, ktv=20%, and kdv=20%. As it is shown in Fig. 9, the daily peak load of the EVs fleet is about 422.653 kW, average load is about 321.86 kW, and the average energy consumption (Eload) per a day is 7724.7 kWh. On the other side, the daily peak load of the EBs fleet is about 360 kW, average load is about 72.5 kW, and the average energy consumption (Eload) per a day is 1740 kWh. However, and due to the randomness in time step and daily load variability, the yearly peak load of the EVs fleet is corrected to 792.82 kW while it is about 707.28 kW for the EBs fleet inside the HO@MER optimizer.

HRMG components specifications

The integration between PV and WT enhances the system performance rather than using only one source in order to cover the shortage in solar irradiation or wind speed. Moreover, and due to the intermittent nature in RESs, ESDs represented in BSSs, flywheels and SCs are investigated. It is worth mentioning that when the generated renewable energy exceeds the load and ESSs are fully charged, the excess energy is used as a dumped load like water heaters. Utilizing fast chargers such as CHAdeMO in addition to flywheels and SCs grant the fast-charging capability to the HRMG due to its deployment in public transportation networks.

Table 2 lists the technical and economical specifications of PV and WT units as mentioned in47 while Fig. 10 displays the actual power-speed curve of the selected WT model. On the other side, Table 3 lists the ESDs specifications including BSSs47, flywheels61, and SCs62. It is worth mentioning that this project has been planned for over 20 years with an annual interest rate of 6% and inflation rate of 2%. Figure 11 demonstrates the HRMG configuration acts as FCS supplying fleets of EVs and EBs with bi-directional power converter connecting AC with DC bus.

Table 2.

WT and PV specifications.

WT PV
Manufacturer Eocycle Manufacture Trina Solar Isc 9.1A
Pr 10kW Type Polycrystalline ICC 450$/kW
vr 6m/s NOCT 44C RC 450$/kW
vci 2.75m/s Efficiency @STC 16.2% AOMC Neglected
vco 20m/s Pmpp@STC 265W Life time 25 years
Prmax 11.5kW Temperature coefficient of Pmpp -0.41%/C
hh 16m Number of cells 60 Project Specs
ICC 5,050 $/unit FPV 88% ny 20 years
RC 5,050 $/unit Vmpp 30.8V i 6%
AOMC 10 $/unit Impp 8.61A f 2%
Life time 20 years Voc 38.3V

Significants values are in bold.

Figure 10.

Figure 10

Eocycle 10 kW WT power-speed curve.

Table 3.

Storage elements and converter specifications.

Batteries Flywheels Super Capacitors
Manufacturer Hoppecke Manufacturer ABB C 3000F
Type Lead acid Charge/discharge capacity 100kW VSC 3V
AHCr 1000AH Energy content 25kWh ESC 3.75Wh
VB 2V ICC 80,000 $/unit ICC 500 $/unit
DoD 80% RC 40,000 $/unit RC 500 $/unit
Ebatt,life 3,438kWh AOMC 1600 $/unit AOMC 50 $/unit
ηcharge,ηdischarge 86% Life time 20 years Life time 14 years
SoCmin 20% String size 100
ICC 50 $/unit Converter
RC 50 $/unit ηconv 85%
AOMC 5 $/unit ICC 110$/kW
Life time 5 years RC 110$/kW
String size 150 Life time 20 years

Figure 11.

Figure 11

Configuration of the HRMG.

Results of basic model

It is worth mentioning that one minute is considered as the time step in the iteration process that results in total time steps per year of 525,600. Consequently, the problem complexity intensifies, however, it is necessary for the accurate simulation of fast charging/discharging rates of flywheels and SCs. Moreover, the maximum value of CSf(%) during the year is 20% which represents a feasible value in this study to imitate V2G and vehicle to vehicle (V2V) technologies. The optimizer is executed 1000 times with the specified lower and upper boundaries of decision variables as announced in Table 4. The FCS comprises two DGs i.e., PV and WT in addition to three ESDs i.e., BSSs, SCs, and flywheels with the bidirectional power converter. The sizing of various FCS configurations listed in Table 5 results in nine architectures ranked in ascending order regarding the OF and cost values as listed in Table 6. It is worth noting that the optimum values of PV and WT units are reported in kW (total output power) while the optimum values of ESDs are reported in number of units.

Table 4.

Lower and upper limits of the optimized variables.

PV WT Converter BSS SC Flywheel
PTPVmin PTPVmax PTWTmin PTWTmax Pconvmin Pconvmax Nbattmin Nbattmax NSCmin NSCmax NFWmin NFWmax
0 6000 kW 0 17,000 kW 0 1500 kW 0 25 0 5 0 30

Table 5.

Various optimized configurations of the HRMG.

Configuration
ID Architecture Sizing
PV WT BSS SC Flywheel Converter PV (kW) WT (kW) BSS (#) SC (#) Flywheel (#) Converter (kW)
1 870 11 692
2 2,031 22
3 2,005 70 22 469
4 4330 14 672
5 3,403 6040 1 937
6 4,037 5950 941
7 2,891 7230 1 786
8 14,330 5 1275
9 17,040 1076

Significant values are in bold.

Table 6.

OF and cost values for various configurations.

Configuration ID ICC($) RC($) O&M($) SC($) NPC($) CoE($/kWh) AOMC($/yr)
1 597,986.36 170,552.03 124,809.04 0 893,347.430 0.02243 21,582.52
2 1,079,062.5 341,104.06 225,805.83 84,701.68 1,561,271 0.03911 35,235.74
3 1,103,209.38 341,104.06 226,763.79 83,615.76 1,587.462 0.03969 35,385.09
4 3,380,599.78 0 365,805.44 0 3,746,405 0.09543 26,730.00
5 4,734,750.38 29,180.34 151,084.63 155,150.98 4,759,864 0.11670 1835.12
6 4,924,876.41 0 81,426.95 168,335.34 4,837,968 0.11850 6350.54
7 5,118,441.67 0 120,840.33 120,537 5,118,745 0.12500 22.16
8 7,626,892.63 145,901.68 538,238.98 66,189.35 8,244,844 0.21030 45,154.71
9 8,723,600.54 0 233,195.84 0 8,956,796 0.22800 17,040.00

Significants values are in bold.

As it is clear that architecture no. 1 is the best candidate architecture which attains NPC of 893,347.43 $ and CoE of 0.02243 $/kWh. This architecture includes WT of 870 kW, converter of 692 kW, and 11 strings of the selected battery model. However, this architecture is accepted only in normal charging mode that lasts for few hours as it doesn’t contain SC or flywheel which simulate the fast-charging process. Therefore, architecture no. 4 is the nominated one in fast charging operation which comprises WT of 4330 kW, converter of 672 kW, and 14 strings of the flywheel selected model (1400 kW). Although there are other fast charging architectures such as no. 5, no. 7, and no. 8, the winner is no. 4 which achieves the lowest cost values i.e., NPC of 3,746,405 $ and CoE of 0.09543 $/kWh. It can be concluded that the fast-charging architecture is about 4 times costly compared to the normal charging architecture which serves about 2,868,735 kWh/yr.

Afterwards, technical and economical KPIs are evaluated for each scenario and tabulated in Table 7 and Table 8 respectively. As it is observed, architecture no. 1 accomplishes UMLf of 15.8% and EEP of 30.8% while the elected fast charging architecture accomplishes UMLf of 17% and EEP of 86.6%. on the other side, it attains a Pw of 2,853,058 $, Aw of 208,478 $/yr, and RoI of − 5.2%. Furthermore, technical and economical KPIs are estimated also for the other architectures, however, the selected architectures are the optimal from economic perspective. In this context, capital, replacement, operation & maintenance (O&M), and total costs of the system components in addition to the whole architecture are depicted in Fig. 12 for normal and fast charging techniques.

Table 7.

Technical KPIs for various configurations.

Configuration ID UMLf(%) EEP(%) CSf(%) Rf(%) Rpen(%)
1 15.8 30.8 19.8 100 175
2 15.6 11 20.1 100 121
3 15.4 19.1 19.9 100 134
4 17 86.6 20.1 100 866
5 13.7 92.2 20.1 100 1388
6 13.6 92.3 20.1 100 1406
7 13.4 93.1 18.5 100 1586
8 17.1 96 20.1 100 2936
9 16.9 96.6 20.1 100 3483

Significants values are in bold.

Table 8.

Economical KPIs for various configurations.

Configuration ID Pw($) Aw($/yr) RoI(%)
1 0 0 0
2 667,923 48,806 − 7.2
3 694,114 50,720 − 7.1
4 2,853,058 208,478 − 5.2
5 3,866,517 282,533 − 4.4
6 3,944,621 288,240 − 4.2
7 4,225,398 308,757 − 4.4
8 7,351,497 537,186 − 5.3
9 8,063,449 589,209 − 4.9

Significants values are in bold.

Figure 12.

Figure 12

Components cost details for winner architectures. (a) Normal charging and (b) Fast charging.

Results with resources uncertainty

Hereinafter, the optimization problem gets more sophisticated by introducing uncertainties in renewable resources such as solar irradiation, wind speed, and ambient temperature. The uncertainty range is bounded between − 10% and + 10% of the measured resources as indicated Fig. 8 which results in 27 probable study cases. HO@MER optimizer follows the spider graph approach for modelling the uncertainties in performing the sensitivity analysis. In this context, only the winning configurations are mentioned in Table 9 either in normal or fast charging operation to avoid the lengthening of the paper. Accordingly, and irrespective of the uncertainty values, the winner configuration is the normal charging is WT/BSS/converter while the winner one in fast charging mode is PV/WT/flywheel/converter with some cases in which the PV is not included in the solution. As it is observed in the results, some uncertainty conditions have negligible effect on the FCS architecture such as study case no. 2, 5, 8, 11, and more.

Table 9.

Winner configurations considering resources uncertainty.

Study case Resources uncertainty Architecture
Normal Fast charging
Gav Tamb Van WT (kW) BSS (#) Converter (kW) PV (kW) WT (kW) Flywheel (#) Converter (kW)
1 − 10% − 10% − 10% 1020 15 722 - 5220 27 849
2 − 10% − 10% 0 870 11 692 - 4330 14 672
3 − 10% − 10%  + 10% 750 8 768 2321 2260 2 985
4 − 10% 0 − 10% 1020 15 722 - 5220 27 849
5 − 10% 0 0 870 11 692 - 4330 14 672
6 − 10% 0  + 10% 750 8 768 2317 2270 2 979
7 − 10%  + 10% − 10% 1020 15 722 - 5220 27 849
8 − 10%  + 10% 0 870 11 692 - 4330 14 672
9 − 10%  + 10%  + 10% 750 8 768 2412 2260 2 990
10 0 − 10% − 10% 1020 15 722 - 5220 27 849
11 0 − 10% 0 870 11 692 - 4330 14 672
12 0 − 10%  + 10% 750 8 768 1116 2300 3 986
13 0 0 − 10% 1020 15 722 - 5220 27 849
14 0 0 0 870 11 692 - 4330 14 672
15 0 0  + 10% 750 8 768 816 2250 4 1096
16 0  + 10% − 10% 1020 15 722 5650 3030 6 787
17 0  + 10% 0 870 11 692 - 4330 14 672
18 0  + 10%  + 10% 750 8 768 807 2260 4 1095
19  + 10% − 10% − 10% 1020 15 722 - 5220 27 849
20  + 10% − 10% 0 870 11 692 - 4330 14 672
21  + 10% − 10%  + 10% 750 8 768 1577 1700 4 930
22  + 10% 0 − 10% 1020 15 722 - 5220 27 849
23  + 10% 0 0 870 11 692 1951 2380 5 757
24  + 10% 0  + 10% 750 8 768 1339 1790 4 1058
25  + 10%  + 10% − 10% 1020 15 722 - 5220 27 849
26  + 10%  + 10% 0 870 11 692 1979 2340 5 818
27  + 10%  + 10%  + 10% 750 8 768 1343 1790 4 1055

Figure 13 depicts the hourly power analysis of a random day for fast charging operation. Obviously, the total electrical demand is always met by the WT power or the storage power inside the flywheel. This curve demonstrates the feasibility of the nominated configuration during fast charging due to the low energy density of the flywheel. It can be noticed that when the renewable output power is zero at 13:00 and 14:00, the flywheel can be utilized to charge the EVs loads in quick mode before its energy is fully dissipated. Consequently, the high-power density of the flywheel is exploited in fast charging operation while there is no obstacle regarding the low energy density in continuing the charging operation.

Figure 13.

Figure 13

Hourly power analysis of a random day for fast charging mode.

However, some study cases involve huge variations to the original FCS configuration like case no.3 which comprises PV of 2321 kW, WT of 2260 kW, 2 strings of flywheels, and 985 kW converter. Nevertheless, this architecture requires NPC of 2,432,078 $ and CoE of 0.06003 $/kWh as indicated in Table 10 which achieves a notable reduction compared to the original configuration of 35% and 37% in NPC and CoE respectively. It is worth mentioning that this huge divergence results from eminent decrement in solar irradiance and temperature by 10% and increment in wind speed by 10% also. When solar irradiation and wind speed increase by 10%, the outcome solution engenders the most economic configuration fulfilling NPC of 1,999,018 $ as demonstrated in case no. 24. This is an anticipated conclusion as by increasing solar and wind resources, the required installed components will be minified as well. Last but not least, Fig. 14 shows the sizing of the FCS installed capacity of arbitrary selected architectures. Outspokenly, this optimization process requires about 25 h of PC operation which entices the attraction for implementing the methodology discussed in the next section.

Table 10.

Performance assessments of fast charging mode considering resources uncertainty.

Case NPC($) CoE($/kWh) AOMC($/yr) UMLf(%) EEP(%) CSf(%) Pw($) Aw($/yr) RoI(%)
1 5,552,096 0.142 48,420 17.3 87.5 20.1 4,444,562 324,771 − 5.5
2 3,746,405 0.09543 26,730 17.0 86.6 20.1 2,853,058 208,478 − 5.2
3 2,432,078 0.06003 1612 14.3 82.2 20.1 1,692,385 123,665 − 3.9
4 5,552,096 0.14200 48,420 17.3 87.5 20.1 4,444,562 324,771 − 5.5
5 3,746,405 0.09543 26,730 17.0 86.6 20.1 2,853,058 208,478 − 5.2
6 2,434,917 0.06010 1589 14.3 82.2 20.1 1,695,224 123,873 − 3.9
7 5,552,096 0.14200 48,420 17.3 87.5 20.1 4,444,562 324,771 − 5.5
8 3,746,405 0.09543 26,730 17.0 86.6 20.1 2,853,058 208,478 − 5.2
9 2,469,825 0.06095 1890 14.3 82.3 20.1 1,730,133 126,424 − 3.9
10 5,552,096 0.14200 48,420 17.3 87.5 20.1 4,444,562 324,771 − 5.5
11 3,746,405 0.09543 26,730 17.0 86.6 20.1 2,853,058 208,478 − 5.2
12 2,062,804 0.05122 3699 14.8 80.6 20.1 1,323,111 96,682 − 4.1
13 5,552,096 0.14200 48,420 17.3 87.5 20.1 4,444,562 324,771 − 5.5
14 3,746,405 0.09543 26,730 17.0 86.6 20.1 2,853,058 208,478 − 5.2
15 2,028,338 0.05059 6164 15.2 79.5 20.1 1,288,646 94,163 − 4.2
16 4,576,540 0.11580 4586 16.4 87.8 20.1 3,469,005 253,486 − 3.9
17 3,746,405 0.09543 26,730 17.0 86.6 20.1 2,853,058 208,478 − 5.2
18 2,029,598 0.05064 6202 15.2 79.5 20.1 1,289,905 94.255 − 4.2
19 5,552,096 0.14200 48,420 17.3 87.5 20.1 4,444,562 324,771 − 5.5
20 3,746,405 0.09543 26,730 17.0 86.6 20.1 2,853,058 208,478 − 5.2
21 2,035,415 0.05081 3295 15.3 77.0 20.1 1,295,723 94,681 − 4
22 5,552,096 0.14200 48,420 17.3 87.5 20.1 4,444,562 324,771 − 5.5
23 2,623,701 0.06591 4436 15.8 82.1 20.1 1,730,353 126,440 − 4
24 1,999,018 0.04989 4111 15.3 77.1 20.1 1,259,326 92,021 − 4
25 5,552,096 0.14200 48,420 17.3 87.5 20.1 4,444,562 324,771 − 5.5
26 2,621,304 0.06588 4309 15.8 81.8 20.1 1,727,957 126,265 − 4
27 2,000,455 0.04994 4097 15.3 77.1 20.1 1,260,762 92,126 − 4

Figure 14.

Figure 14

Components sizing for fast charging mode considering uncertainty.

Deep learning radial basis network

Initiation

The computational time of HO@MER optimizer is about 50 min for each individual run which is logic due to the high complexity in the optimization process. This is due to the fact of utilizing 525,600-time steps per year to emulate the ultra-discharging performance of flywheels and SCs. However, outcome results from the optimization model are crucial for the training purposes of the upcoming methodology.

In this subsection, one of deep learning toolboxes in MATLAB environment called radial basis network (RBN) is implemented. Deep learning RBN differs from the traditional feed forward neural network in that it requires more neurons and can be designed and trained in a fraction of time. In this paper, RBN is exploited for predicting the optimal sizing of FCS components with variations in resources availability, fleet loading, in addition to technical and economical KPIs. Moreover, it can be used as online energy management strategy inside the FCS as it takes only few seconds compared to the HO@MER optimizer. The RBN passes through 4 stages as follows:

Step 1: RBN design

The RBN can be designed as indicated in (52) using the newrb command by defining the input vector P and output vector T. Furthermore, the targeted mean square error (MSE) is also defined in the parameter goal, while spread designates for the spread in radial basis function, MN denotes the maximum number of neurons, and DF denotes the number of neurons to be added between displays. It is worth mentioning that the larger the spread is, the smoother the function approximation. However, too many neurons are required for this purpose for fast charging function to create a generalized RBN.

net=newrbP,T,goal,spread,MN,DF 52

Figure 15 demonstrates the architecture of RBN with the corresponding adjusting parameters. It can be observed that the multiple inputs pass through MUX to unify them to a single input matrix to the RBN. Moreover, the output vector is split into the targeted output values through the DEMUX.

Figure 15.

Figure 15

RBN architecture with adjusting parameters.

In this context, the specified values of the design parameters for an accurate design are: goal=0, spread=30,000, MN=1,000, and DF=1,000. It is worth mentioning that the selection of these values are determined after diverse trials till the least error is attained. However, these values may be changed in different problems.

Step 2: RBN training

The RBN is trained using the obtained optimized solutions considering resources uncertainty form the previous section. In this regard, 25 set of data comprising 6 input vectors as follows:

Gav, Tamb, Van, served load, UMLf, and RoI, and 4 output vectors as follows: PV, WT, flywheel, and converter sizing are considered. Thus, the dimension of P and T matrices are 6 × 25 and 4 × 25 respectively.

Step 3: RBN validation

In this stage, RBN performance is validated using two study cases from Table 9 in which the simulated output is compared to the actual output for each study case. In addition, errors in per unit (PU) are calculated for each output as demonstrated in Table 11 and Table 12 for study case no. 26 and no. 27 respectively. Furthermore, Fig. 16 depicts the deviations between actual and simulated output using RBN for case no. 26 while Fig. 17 shows the deviations for case no. 27. Consequently, mean absolute error (MAE) and MSE are computed for each study case as follows:

  • Study case no. 26: MAE = 0.0441, MSE = 0.003600.

  • Study case no. 27: MAE = 0.0077, MSE = 0.000106.

Table 11.

Validation assessment of the RBN for study case no. 26.

Unit Actual output Simulated output Error (PU)
PV (kW) 1979 1977 0.001
WT (kW) 2340 2489 0.064
Flywheel (#) 5 5 0.011
Converter (kW) 818 736 0.101
Table 12.

Validation assessment of the RBN for study case no. 27.

Unit Actual output Simulated output Error (PU)
PV (kW) 1343 1324 0.014
WT (kW) 1790 1788 0.0009
Flywheel (#) 4 4 0
Converter (kW) 1055 1039 0.015
Figure 16.

Figure 16

RBN validation using study case no. 26.

Figure 17.

Figure 17

RBN validation using study case no. 27.

Step 4: RBN operation

Eventually, the RBN is used for an online energy dispatch strategy to find the optimal output power from each component inside the FCS as explained in Table 13. Various operational scenarios along with altering in geographical conditions are established to determine the optimal solution. It can be noted that when + 5% increase in solar irradiance, temperature, and wind speed, while the served load increased by 2%, the FCS comprises 1829 kW PV, 1813 kW WT, and 4 flywheels. Furthermore, when the temperature decreases by 5% and wind speed increases by 5%, the online dispatch controller manages the charging power between PV and WT at 1679 kW and 5587 kW respectively with 14 strings of flywheels.

Table 13.

Energy management of FCS components using RBN.

Gav Tamb Van Served load UMLf(\%) RoI(\%) PV (kW) WT (kW) Flywheel (#) Converter (kW)
 + 5%  + 5%  + 5%  + 2% 15.3 − 4 1829 1813 4 1294
 + 6%  + 6%  + 4% 0 10 − 4 1033 4782 14 1421
 + 2%  + 3%  + 3%  + 1% 3 − 3 1244 6165 6 1437
 + 7%  + 6% − 2%  + 1% 15.3 − 4 3067 3318 6 489
− 2% 0 0  + 1% 5 − 3 2304 5426 6 1465
0 − 5%  + 5% 0 3 − 3 1679 5587 14 2216
0  + 4% − 4%  + 1% 15.3 − 4 3265 3348 6 613
− 3% − 4% 0 0 15.3 − 4 3434 2835 13 1297
 + 2% − 8% − 5%  + 2% 0 0 10,068 418 3 4123
− 2% 0  + 2%  + 2% 0 0 9398 512 3 3922

KPIs effect is tackled through enforcing UMLf and RoI to be 0% which in turns grants the dominance to the PV units with rated power of 10,068 kW or 9398 kW based on the operation scenario mentioned in Table 13. Moreover, 3 strings of flywheels are required to achieve this condition.

In fact, RBN harvests the optimal result in about 3 s which is very lower than the computational time of the optimizer. Despite the technical benefits of the proposed methodology, there are some issues and limitations that have to be mentioned. First, LPSP index is not included into the optimizer’s mechanism, however, it can be compensated by other factors such as UMLf and CSf. Additionally, the RBN parameters shall be well-tuned to guarantee the result’s accuracy.

Conclusions

With the help of deep learning RBN, this study is a fresh attempt at an online energy management dispatch approach for FCS. Along Cairo’s Ring Road, initial loads of both EV and EB fleets are defined, along with an evaluation of renewable resources. Then, with relation to the NPC and CoE, all feasible FCS configurations are rated in ascending order. It has been determined that the charging station’s ideal architecture depends on whether it will function in standard or rapid charging mode. Therefore, it has been established that choosing the PV/WT/flywheel/converter design is the ideal setup for quick charging operation. The winning charging architecture costs nearly four times as much as the standard charging architecture and consists of a WT of 4330 kW, a converter of 672 kW, and 14 strings of the flywheel. As a result, there are several variables related to renewable resources, such as sun irradiance, temperature, and wind speed, that can affect how well this ideal design performs. Finally, the RBN is put into use for the online energy management strategy, validated with the optimal outcomes attained, and executed using different operating situations. This research area is still being looked into, though, because the FCS operation in on-grid mode necessitates greater attention from a techno-economic standpoint.

Author contributions

Abdelmonem Draz: Conceptualization, Data curation, Methodology, Software, Writing- Original draft preparation. Ahmed M. Othman: Visualization, Software, Investigation, Data Validations, Formal analysis. Attia A. El-Fergany: Writing- Reviewing and Editing, Supervision, Validations of Results.

Funding

Open access funding provided by The Science, Technology & Innovation Funding Authority (STDF) in cooperation with The Egyptian Knowledge Bank (EKB).

Data availability

The datasets generated and/or analyzed during the current study are not publicly available due to intellectual property rights but are available from the corresponding author on reasonable request.

Competing interests

The authors declare no competing interests.

Footnotes

Publisher's note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

References

  • 1.Liu, R. et al. A cross-scale framework for evaluating flexibility values of battery and fuel cell electric vehicles. Nat. Commun.15, 280. 10.1038/s41467-023-43884-x (2024). 10.1038/s41467-023-43884-x [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 2.Ashraf, H., Elkholy, M. M., Abdellatif, S. O. & El-Fergany, A. A. Accurate emulation of steady-state and dynamic performances of PEM fuel cells using simplified models. Sci. Rep.13, 19532. 10.1038/s41598-023-46847-w (2023). 10.1038/s41598-023-46847-w [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 3.El-Sehiemy, R., Shaheen, A., El-Fergany, A. & Ginidi, A. Electrical parameters extraction of PV modules using artificial hummingbird optimizer. Sci. Rep.13, 9240. 10.1038/s41598-023-36284-0 (2023). 10.1038/s41598-023-36284-0 [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 4.Shaheen, A., El-Sehiemy, R., El-Fergany, A. & Ginidi, A. Fuel-cell parameter estimation based on improved gorilla troops technique. Sci. Rep.13, 8685. 10.1038/s41598-023-35581-y (2023). 10.1038/s41598-023-35581-y [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 5.Abdelaal, A. K. & El-Fergany, A. Estimation of optimal tilt angles for photovoltaic panels in Egypt with experimental verifications. Sci. Rep.13, 3268. 10.1038/s41598-023-30375-8 (2023). 10.1038/s41598-023-30375-8 [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 6.Dashtdar, M., Flah, A., Hosseinimoghadam, S. M. S. & El-Fergany, A. Frequency control of the islanded microgrid including energy storage using soft computing. Sci. Rep.12, 20409. 10.1038/s41598-022-24758-6 (2022). 10.1038/s41598-022-24758-6 [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 7.Abdelateef Mostafa, M., El-Hay, E. A. & Elkholy, M. M. Optimal low voltage ride through of wind turbine doubly fed induction generator based on bonobo optimization algorithm. Sci. Rep.13, 7778. 10.1038/s41598-023-34240-6 (2023). 10.1038/s41598-023-34240-6 [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 8.Basheer, Y. et al. Analyzing the prospect of hybrid energy in the cement industry of Pakistan, using HOMER pro. Sustainability14, 12440. 10.3390/su141912440 (2022). 10.3390/su141912440 [DOI] [Google Scholar]
  • 9.Olabi, A. G., Wilberforce, T., Abdelkareem, M. A. & Ramadan, M. Critical review of flywheel energy storage system. Energies14, 2159. 10.3390/en14082159 (2021). 10.3390/en14082159 [DOI] [Google Scholar]
  • 10.Adefarati, T., Obikoya, G. D., Sharma, G., Onaolapo, A. K. & Akindeji, K. T. Design and feasibility analysis of grid-connected hybrid renewable energy system: Perspective of commercial buildings. Energy Syst.10.1007/s12667-023-00578-z (2023). 10.1007/s12667-023-00578-z [DOI] [Google Scholar]
  • 11.Kiehbadroudinezhad, M., Merabet, A., Abo-Khalil, A. G., Salameh, T. & Ghenai, C. Intelligent and optimized microgrids for future supply power from renewable energy resources: A review. Energies15, 3359. 10.3390/en15093359 (2022). 10.3390/en15093359 [DOI] [Google Scholar]
  • 12.Mansouri, S. A. et al. A sustainable framework for multi-microgrids energy management in automated distribution network by considering smart homes and high penetration of renewable energy resources. Energy245, 123228. 10.1016/j.energy.2022.123228 (2022). 10.1016/j.energy.2022.123228 [DOI] [Google Scholar]
  • 13.Guo, T. et al. Microgrid source-network-load-storage master-slave game optimization method considering the energy storage overcharge/overdischarge risk. Energy282, 128897. 10.1016/j.energy.2023.128897 (2023). 10.1016/j.energy.2023.128897 [DOI] [Google Scholar]
  • 14.Kaur, A. P. & Singh, M. Design and development of a three-phase net meter for V2G enabled charging stations of electric vehicles. Sustain. Energy Grids Netw.30, 100598. 10.1016/j.segan.2021.100598 (2022). 10.1016/j.segan.2021.100598 [DOI] [Google Scholar]
  • 15.Ebrahimi, J., Abedini, M., Rezaei, M. M. & Nasri, M. Optimum design of a multi-form energy in the presence of electric vehicle charging station and renewable resources considering uncertainty. Sustain. Energy Grids Netw.23, 100375. 10.1016/j.segan.2020.100375 (2020). 10.1016/j.segan.2020.100375 [DOI] [Google Scholar]
  • 16.Saadati, R., Saebi, J. & Jafari-Nokandi, M. Effect of uncertainties on siting and sizing of charging stations and renewable energy resources: A modified capacitated flow-refueling location model. Sustain. Energy Grids Netw.31, 100759. 10.1016/j.segan.2022.100759 (2022). 10.1016/j.segan.2022.100759 [DOI] [Google Scholar]
  • 17.Saadati, R., Jafari-Nokandi, M., Saebi, J. & Hosseini, S. H. Optimal location of fast charging stations alongside pricing design from distribution company viewpoint considering renewable energy resource: A modified capacitated flow-capturing location model. Sustain. Energy Grids Netw.34, 100989. 10.1016/j.segan.2022.100989 (2023). 10.1016/j.segan.2022.100989 [DOI] [Google Scholar]
  • 18.Vashisth, S., Agrawal, P. K., Nikhil Gupta, K. R. & Niazi, A. S. Multi-stage planning of fast charging stations for PEVs using traffic-based approach. Sustain. Energy Grids Netw.30, 100662. 10.1016/j.segan.2022.100662 (2022). 10.1016/j.segan.2022.100662 [DOI] [Google Scholar]
  • 19.Warraich, Z. S. & Morsi, W. G. Early detection of cyber-physical attacks on fast charging stations using machine learning considering vehicle-to-grid operation in microgrids. Sustain. Energy Grids Netw.34, 101027. 10.1016/j.segan.2023.101027 (2023). 10.1016/j.segan.2023.101027 [DOI] [Google Scholar]
  • 20.Mohammed, A. M., Alalwan, S. N., Taşcıkaraoğlu, A. & Catalão, J. P. Sliding mode-based control of an electric vehicle fast charging station in a DC microgrid. Sustain. Energy Grids Netw.32, 100820. 10.1016/j.segan.2022.100820 (2022). 10.1016/j.segan.2022.100820 [DOI] [Google Scholar]
  • 21.Dutta, A., Ganguly, S. & Kumar, C. Coordinated control scheme for EV charging and volt/var devices scheduling to regulate voltages of active distribution networks. Sustain. Energy Grids Netw31, 100761. 10.1016/j.segan.2022.100761 (2022). 10.1016/j.segan.2022.100761 [DOI] [Google Scholar]
  • 22.Jiao, F., Zou, Y., Zhou, Yi., Zhang, Y. & Zhang, X. Energy management for regional microgrids considering energy transmission of electric vehicles between microgrids. Energy283, 128410. 10.1016/j.energy.2023.128410 (2023). 10.1016/j.energy.2023.128410 [DOI] [Google Scholar]
  • 23.Dayalan, S. & Rathinam, R. Energy management of a microgrid using demand response strategy including renewable uncertainties. Int. J. Emerg. Electric Power Syst.22, 85–100. 10.1515/ijeeps-2020-0188 (2021). 10.1515/ijeeps-2020-0188 [DOI] [Google Scholar]
  • 24.Neelagiri, S. & Usha, P. Energy management of PV wind based microgrid with hybrid energy storage systems. Int. J. Power Electron. Drive Syst.13, 2128–2138. 10.11591/ijpeds.v13.i4.pp2128-2138 (2022). 10.11591/ijpeds.v13.i4.pp2128-2138 [DOI] [Google Scholar]
  • 25.Rad, M. A. V., Kasaeian, A., Niu, X., Zhang, K. & Mahian, O. Excess electricity problem in off-grid hybrid renewable energy systems: A comprehensive review from challenges to prevalent solutions. Renew. Energy212, 538–560. 10.1016/j.renene.2023.05.073 (2023). 10.1016/j.renene.2023.05.073 [DOI] [Google Scholar]
  • 26.Kushwaha, P. K. & Bhattacharjee, C. Integrated techno-economic-enviro-socio design of the hybrid renewable energy system with suitable dispatch strategy for domestic and telecommunication load across India. J. Energy Storage55, 105340. 10.1016/j.est.2022.105340 (2022). 10.1016/j.est.2022.105340 [DOI] [Google Scholar]
  • 27.Hassan, R., Das, B. K. & Al-Abdeli, Y. M. Investigation of a hybrid renewable-based grid-independent electricity-heat nexus: Impacts of recovery and thermally storing waste heat and electricity. Energy Convers. Manag.252, 115073. 10.1016/j.enconman.2021.115073 (2022). 10.1016/j.enconman.2021.115073 [DOI] [Google Scholar]
  • 28.Cui, Y., Wang, Y., Yang, Xu. & Zhao, Y. Low-carbon economic dispatching of microgrid considering generalized integrated demand response and nonlinear conditions. Energy Rep.9, 1606–1620. 10.1016/j.egyr.2022.12.049 (2023). 10.1016/j.egyr.2022.12.049 [DOI] [Google Scholar]
  • 29.Dutta, R., Das, S. & De, S. Multi criteria decision making with machine-learning based load forecasting methods for techno-economic and environmentally sustainable distributed hybrid energy solution. Energy Convers. Manag.291, 117316. 10.1016/j.enconman.2023.117316 (2023). 10.1016/j.enconman.2023.117316 [DOI] [Google Scholar]
  • 30.Shadman Abid, M., Apon, H. J., Nafi, I. M., Ahmed, A. & Ahshan, R. Multi-objective architecture for strategic integration of distributed energy resources and battery storage system in microgrids. J. Energy Storage72, 108276. 10.1016/j.est.2023.108276 (2023). 10.1016/j.est.2023.108276 [DOI] [Google Scholar]
  • 31.Gao, M. et al. Optimal configuration for regional integrated energy systems with multi-element hybrid energy storage. Energy277, 127672. 10.1016/j.energy.2023.127672 (2023). 10.1016/j.energy.2023.127672 [DOI] [Google Scholar]
  • 32.Agajie, T. F. et al. Optimal design and mathematical modeling of hybrid solar PV–biogas generator with energy storage power generation system in multi-objective function cases. Sustainability15, 8264. 10.3390/su15108264 (2023). 10.3390/su15108264 [DOI] [Google Scholar]
  • 33.Quynh, N. V., Ali, Z. M., Alhaider, M. M., Rezvani, A. & Suzuki, K. Optimal energy management strategy for a renewable-based microgrid considering sizing of battery energy storage with control policies. Int. J. Energy Res.45, 5766–5780. 10.1002/er.6198 (2021). 10.1002/er.6198 [DOI] [Google Scholar]
  • 34.Zhou, J. & Zhongtian, Xu. Optimal sizing design and integrated cost-benefit assessment of stand-alone microgrid system with different energy storage employing chameleon swarm algorithm: A rural case in Northeast China. Renew. Energy202, 1110–1137. 10.1016/j.renene.2022.12.005 (2023). 10.1016/j.renene.2022.12.005 [DOI] [Google Scholar]
  • 35.Kushwaha, P. K., Ray, P. & Bhattacharjee, C. Optimal sizing of a hybrid renewable energy system: A socio-techno-economic-environmental perspective. J. Solar Energy Eng.145, 031003–031012. 10.1115/1.4055196 (2023). 10.1115/1.4055196 [DOI] [Google Scholar]
  • 36.Kitmo, Guy Bertrand Tchaya, Noël Djongyang. Optimal sizing of grid connected PV/wind systems under uncertain weather conditions, Available at SSRN: https://ssrn.com/abstract=4162411.
  • 37.Djidimbélé, R., Ngoussandou, B.-P., Kidmo, D. K., Kitmo, M. B. & Raidandi, D. Optimal sizing of hybrid systems for power loss reduction and voltage improvement using PSO algorithm: Case study of Guissia rural grid. Energy Rep.8, 86–95. 10.1016/j.egyr.2022.06.093 (2022). 10.1016/j.egyr.2022.06.093 [DOI] [Google Scholar]
  • 38.Alhawsawi, E.Y., Habbi, H.M.D., Hawsawi, M. & Zohdy, M.A. Optimal design and operation of hybrid renewable energy systems for Oakland university. Energies, 16(15), 5830. 10.3390/en16155830 (2023).
  • 39.Wang, J. et al. Risk-averse based optimal operational strategy of grid-connected photovoltaic/wind/battery/diesel hybrid energy system in the electricity/hydrogen markets. Int. J. Hydrog. Energy48, 4631–4648. 10.1016/j.ijhydene.2022.11.006 (2023). 10.1016/j.ijhydene.2022.11.006 [DOI] [Google Scholar]
  • 40.Uwineza, L., Kim, H.-G., Kleissl, J. & Kim, C. K. Technical control and optimal dispatch strategy for a hybrid energy system. Energies15, 2744. 10.3390/en15082744 (2022). 10.3390/en15082744 [DOI] [Google Scholar]
  • 41.Wang, R. & Zhang, R. Techno-economic analysis and optimization of hybrid energy systems based on hydrogen storage for sustainable energy utilization by a biological-inspired optimization algorithm. J. Energy Storage66, 107469. 10.1016/j.est.2023.107469 (2023). 10.1016/j.est.2023.107469 [DOI] [Google Scholar]
  • 42.Marcos Tostado-V´eliz, Ali Asghar Ghadimi, Mohammad Reza Miveh, Mohammad Bayat, Francisco Jurado. Uncertainty-aware energy management strategies for PV-assisted refuelling stations with onsite hydrogen generation. Journal of Cleaner Production 365, 132869 (2022). 10.1016/j.jclepro.2022.132869.
  • 43.Emad, D., El-Hameed, M. A., Yousef, M. T. & El-Fergany, A. A. Computational methods for optimal planning of hybrid renewable microgrids: A comprehensive review and challenges. Arch. Comput. Methods Eng.27, 1297–1319. 10.1007/s11831-019-09353-9 (2020). 10.1007/s11831-019-09353-9 [DOI] [Google Scholar]
  • 44.Bilal, M., Alsaidan, I., Alaraj, M., Almasoudi, F. M. & Rizwan, M. Techno-economic and environmental analysis of grid-connected electric vehicle charging station using AI-based algorithm. Mathematics10, 924. 10.3390/math10060924 (2022). 10.3390/math10060924 [DOI] [Google Scholar]
  • 45.Tawfik, T. M., Badr, M. A., Abdellatif, O. E. & Zakaria, H. M. Techno-enviro-economic evaluation for hybrid energy system considering demand side management. Int. J. Renew. Energy Res.10.20508/ijrer.v12i2.12805.g8449 (2022). 10.20508/ijrer.v12i2.12805.g8449 [DOI] [Google Scholar]
  • 46.Draz, A., Othman, A. M. & El-Fergany, A. A. State-of-the-art with numerical analysis on electric fast charging stations: Infrastructures, standards, Techniques, and Challenges. Renew. Energy Focus47, 100499. 10.1016/j.ref.2023.100499 (2023). 10.1016/j.ref.2023.100499 [DOI] [Google Scholar]
  • 47.Emad, D., El-Hameed, M. A. & El-Fergany, A. A. Optimal techno-economic design of hybrid PV/wind system comprising battery energy storage: Case study for a remote area. Energy Convers. Manag.249, 114847. 10.1016/j.enconman.2021.114847 (2021). 10.1016/j.enconman.2021.114847 [DOI] [Google Scholar]
  • 48.Rad, M. A. V., Kasaeian, A., Mahian, O. & Toopshekan, A. Technical and economic evaluation of excess electricity level management beyond the optimum storage capacity for off-grid renewable systems. J. Energy Storage87, 111385. 10.1016/j.est.2024.111385 (2024). 10.1016/j.est.2024.111385 [DOI] [Google Scholar]
  • 49.Yan, C., Zou, Y., Zhixin, Wu. & Maleki, A. Effect of various design configurations and operating conditions for optimization of a wind/solar/hydrogen/fuel cell hybrid microgrid system by a bio-inspired algorithm. Int. J. Hydrog. Energy60, 378–391. 10.1016/j.ijhydene.2024.02.004 (2024). 10.1016/j.ijhydene.2024.02.004 [DOI] [Google Scholar]
  • 50.Zhao, Y.-B., Dong, X.-J., Shen, J.-N. & He, Y.-J. Simultaneous sizing and scheduling optimization for PV-wind-battery hybrid systems with a modified battery lifetime model: A high-resolution analysis in China. Appl. Energy360, 122812. 10.1016/j.apenergy.2024.122812 (2024). 10.1016/j.apenergy.2024.122812 [DOI] [Google Scholar]
  • 51.Sun, X., He, H. & Ma, Li. Harmony search meta-heuristic algorithm based on the optimal sizing of wind-battery hybrid micro-grid power system with different battery technologies. J. Energy Storage75, 109582. 10.1016/j.est.2023.109582 (2024). 10.1016/j.est.2023.109582 [DOI] [Google Scholar]
  • 52.El-Sattar, H. A., Hassan, M. H., Vera, D., Jurado, F. & Kamel, S. Maximizing hybrid microgrid system performance: A comparative analysis and optimization using a gradient pelican algorithm. Renew. Energy227, 120480. 10.1016/j.renene.2024.120480 (2024). 10.1016/j.renene.2024.120480 [DOI] [Google Scholar]
  • 53.Elkholy, M. H. et al. Techno-economic configuration of a hybrid backup system within a microgrid considering vehicle-to-grid technology: A case study of a remote area. Energy Convers. Manag.301, 118032. 10.1016/j.enconman.2023.118032 (2024). 10.1016/j.enconman.2023.118032 [DOI] [Google Scholar]
  • 54.Sunny, M. R., Ali, T., Aghaloo, K. & Wang, K. Techno-economic feasibility of stand-alone hybrid energy system with battery storage in educational buildings: A case study of Uttara University. Energy Build.304, 113852. 10.1016/j.enbuild.2023.113852 (2024). 10.1016/j.enbuild.2023.113852 [DOI] [Google Scholar]
  • 55.Mohamed, M., Elmitiny, N. & Talaat, H. A simulation-based evaluation of BRT systems in over-crowded travel corridors: A case study of Cairo Egypt. J. Eng. Appl. Sci.69, 36. 10.1186/s44147-022-00088-2 (2022). 10.1186/s44147-022-00088-2 [DOI] [Google Scholar]
  • 56.ElSayed, M., Aghahosseini, A. & Breyer, C. High cost of slow energy transitions for emerging countries: On the case of Egypt’s pathway options. Renew. Energy210, 107–126. 10.1016/j.renene.2023.04.036 (2023). 10.1016/j.renene.2023.04.036 [DOI] [Google Scholar]
  • 57.El-Zonkoly, A. Optimal P2P based energy trading of flexible smart inter-city electric traction system and a wayside network: A case study in Alexandria Egypt. Electric Power Syst. Res.223, 109708. 10.1016/j.epsr.2023.109708 (2023). 10.1016/j.epsr.2023.109708 [DOI] [Google Scholar]
  • 58.M. Sh. Asfoor, Ahmed M. Ali. Energy-efficient electrification of public transportation fleets based on generic driving cycles for the city of Cairo, Egypt, 2021 IEEE Vehicle Power and Propulsion Conference (VPPC), 25–28. 10.1109/VPPC53923.2021.9699148. (Gijon, Spain, IEEE, 2021).
  • 59.Ali, A. M. & Asfoor, M. S. Optimal battery sizing and stops’ allocation for electrified fleets using data-driven driving cycles: A case study for the city of Cairo. IEEE Trans. Transp. Electrif.9, 896–911. 10.1109/TTE.2022.3160615 (2023). 10.1109/TTE.2022.3160615 [DOI] [Google Scholar]
  • 60.https://www.tomtom.com/traffic-index/cairo-traffic/. Accessed online 25th August 2023.
  • 61.Ramli, A. M., Hiendro, A. & Twaha, S. Economic analysis of PV/diesel hybrid system with flywheel energy storage. Renew. Energy78, 398–405. 10.1016/j.renene.2015.01.026 (2015). 10.1016/j.renene.2015.01.026 [DOI] [Google Scholar]
  • 62.Yi He, Su., Guo, P. D., Wang, C., Huang, J. & Zhou, J. Techno-economic comparison of different hybrid energy storage systems for off-grid renewable energy applications based on a novel probabilistic reliability index. Appl. Energy328, 120225. 10.1016/j.apenergy.2022.120225 (2022). 10.1016/j.apenergy.2022.120225 [DOI] [Google Scholar]

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Data Availability Statement

The datasets generated and/or analyzed during the current study are not publicly available due to intellectual property rights but are available from the corresponding author on reasonable request.


Articles from Scientific Reports are provided here courtesy of Nature Publishing Group