Abstract
Ghana, with a population of 6 700 000, largely distributed in rural districts, is representative of many a country where the problem of water supply is associated with the construction of numerous small supplies for the villages and towns scattered over the whole area. This paper gives a general impression of the various methods in use for tackling the problem. Well-sinking, drilling, and pond-digging, and the advantages and disadvantages of a variety of methods, are described, and the problems met with under different geological conditions are considered. Details of the various systems for pumping the water from the source to the villages and towns are given. The important question of standardization, both in design and equipment, is dealt with, and reference is made to the operation of supplies and to the training of operatives.
Full text
PDF






















