TABLE 5.
Scheme | Deviation from basic schemea |
---|---|
Alt. 1 | = = 0.7 |
Alt. 2 | = = −0.7 |
Alt. 3 | = 0.7, = −0.7 |
Alt. 4 | = −0.7, = 0.7 |
Alt. 5 | = 0.7 |
Alt. 6 | = 0.7 |
Alt. 7 | = −0.7 |
Alt. 8 | = −0.7 |
Alt. 9 | nw = 2, ng = 2,500, , T = 2450 |
Alt. 10 | nw = 10, ng = 500, |
Alt. 11 | = 0.1 |
Alt. 12 | = 0.5 |
Alt. 13 | |
Alt. 14 | = 1 |
Alt. 15 | N = 20, n = 250 |
Alt. 16 | N = 100, n = 50 |
Alt. 17 | n = 40, T = 2,000 |
Alt. 18 | n = 200, T = 10,000 |
Alt. 19 | N = 100, n = 10, T = 1,000 |
Alt. 20 | N = 200, n = 10, T = 2,000 |
Basic scheme: N = 50 families, n = 100 members per family, so that T = 5000; nw = 4 individuals per group, so that ng = 1250 groups; = 1, , = 0.3, = 0.3, = = 0. For schemes with groups composed of two families, T was adjusted when needed to obtain an integer number of blocks.