Table 13.
Determine which impacts to sea turtles need to be monitored: | |
---|---|
The energy resource is | |
Wind | Go to A |
Tidal | Go to B |
Waves | Go to C |
(A) The wind turbine foundation is | |
Monopile OR tripod OR floating mooring | Go to A1 |
Lattice OR gravity | Go to A2 |
(A1) The stage of the monopile or tripod or floating mooring wind turbine project is | |
Construction | W1, W3, W4, W5, W8 |
Operation | W1, W3, W4, W5 |
Decommissioning | W1, W3, W4, W5, W8 |
(A2) The stage of the lattice structure or gravity foundation wind project is | |
Construction | W1, W3, W4, W5, W8 |
Operation | W1, W3, W4, W5 |
Decommissioning | W1, W3, W4, W5, W6, W7, W8 |
(B) The tidal turbine type is | |
Open OR shrouded bottom-mounted | Go to B1 |
Open OR shrouded floating mooring | Go to B2 |
(B1) The stage of the bottommounted tidal turbine project is | |
Construction | W1, W3, W4, W5, W8 |
Operation | W1, W3, W4, W5 |
Decommissioning | W1, W3, W4, W5, W6, W7, W8 |
(B2) The stage of the floating mooring tidal turbine project is | |
Construction | W1, W3, W4, W5, W8 |
Operation | W1, W3, W4, W5 |
Decommissioning | W1, W3 W4, W5, W8 |
(C) The stage of the wave energy device is | |
Construction | W1, W3, W4, W5, W8 |
Operation | W1, W3, W4, W5 |
Decommissioning | W1, W3, W4, W5, W8 |
Recommended protocols:
W1: visual surveys.
W2: passive acoustic monitoring.
W3: marine mammal observers.
W4: stranding response networks.
W5: tagging.
W6: underwater photography.
W7: SCUBA surveys.
W8: ROV surveys.