Skip to main content
. 2014 Jul 21;2014:689471. doi: 10.1155/2014/689471

Table 6.

Strain sensor arrangement.

Monitoring position Number
Midsection of the main span 12
1/4, 3/4 section of main span 24
Midsection of the side span 24
Section of steel box girder at each pier top 16
T0, T1, and T7 and top section of steel arch tower 56
Section of the lateral steel beam 16
Section of the approach 100