Dynamic Schedule-Based Assignment Model for Urban Rail Transit Network with Capacity Constraints

Baoming Han 1,2, Weiteng Zhou 1,*, Dewei Li 1,2, Haodong Yin 1
PMCID: PMC4396558  PMID: 25918747

Abstract

There is a great need for estimation of passenger flow temporal and spatial distribution in urban rail transit network. The literature review indicates that passenger flow assignment models considering capacity constraints with overload delay factor for in-vehicle crowding are limited in schedule-based network. This paper proposes a stochastic user equilibrium model for solving the assignment problem in a schedule-based rail transit network with considering capacity constraint. As splitting the origin-destination demands into the developed schedule expanded network with time-space paths, the model transformed into a dynamic schedule-based assignment model. The stochastic user equilibrium conditions can be equivalent to the equilibrium passenger overload delay with crowding penalty in the transit network. The proposal model can estimate the path choice probability according to the equilibrium condition when passengers minimize their perceptive cost in a schedule-based network. Numerical example in Beijing urban rail transit (BURT) network is used to demonstrate the performance of the model and estimate the passenger flow temporal and spatial distribution more reasonably and dynamically with train capacity constraints.

1. Introduction

As Beijing urban rail transit (BURT) network is growing rapidly, the ridership of the BURT network is about 8,000,000 person-trips, which is still increased quickly successively. For safe and efficient operation requirements, the high risk of passenger flow and multistakeholders status makes it necessary and critical to estimate and evaluate the passenger flow temporal and spatial distribution scientifically and reasonably within the BURT network. With the automatic fare collection (AFC) [1] and passenger information system (PIS), the dynamic transit assignment problem, substantially, is a black-box problem with input of specific original-destination (O-D) information. Transit assignment model is a practical approach for estimating and predicting how passengers utilize transit system and choose paths, which can be definitely divided into two types: “frequency-based” and “schedule-based” [2]. On frequency-based transit network, each transit line is assumed to be run on a constant headway with a static process in the transit assignment [35], and the network would be represented in a static manner [6, 7]. For the majority of these models, schedule of transit system is assumed to be sufficiently reliable. Therefore, the headway is calculated by the average frequencies of transit line in frequency-based network. The waiting time and transfer time are implicit estimated based on headway. Since the time dimension is not considered in frequency-based transit model, the assignment results in frequency-based models are the average value in the specified time period (e.g., the rush hour). Unlike frequency-based type model, schedule-based models generally take explicitly timetable or schedule of the transit system into account [811], which means that the detailed departure or arrival times of vehicle or train in each transit lines are used in assignment procedures. According to different schedule-based transit assignment models, the time-dependent transit network representations can be classified into four types: (a) diachronic graph [12]; (b) dual graph [13]; (c) forward star network [14]; (d) discrete space-time graph [15] and time-expanded network [16]. Modeling formulations of transit assignment are one of schedule-based problems. Alfa and Chen [17] formulated a transit assignment model to forecast the temporal and spatial demand distribution in transit network. Tong and Wong [14] and Poon et al. [18] put forward a dynamic user equilibrium model, considering the crowded environment in boarding stations. Nielsen [19] proposed a stochastic transit assignment model considering differences properties in passengers' utility function. As capacity constraints considered in schedule-based network in transit assignment are gradually developed in recent years, Hamdouch and Lawphongpanich [16] developed the model of how passengers are unable to board vehicle due to capacity limited assigned in to waiting arcs of time expanded network. Nuzzolo et al. [20] presented a schedule-based dynamic assignment model with using joint choice model for transit network taking congestion into account through explicit vehicle capacity. Hamdouch et al. [21] and Sumalee et al. [22] considered one of the critical factors of capacity, sitting and standing capacities, and the treatment of seat allocation is considered as a random probability to get a seat or not. Since previous researches in passenger flow assignment models are limited in schedule-based urban rail transit network, especially in considering the particularity of rail transit system described above, and lack of considering train capacity, a new stochastic user equilibrium (SUE) rail transit assignment model is introduced and formulated to estimate the passenger flow temporal and spatial distribution within network during a given time interval.

Following the introduction, the remainder of this paper is organized as follows. Section 2 focuses on network representation of the presented model. In Section 3, a SUE assignment model of SE network with trains' capacity constraint and the solution procedure is presented, while Section 4 illustrates the results of an application to the real test experiment. Conclusions of this study are reported in Section 5.

2. Network Representation

As the schedule diagrams the departure time from the first station and daily planned arrival or departure time at each station along the transit lines, this paper proposes a new method that represents the static network which incorporates the temporal information of the trains, called schedule-expanded network. Essentially, the SE network is expanded from the two-dimension route network G(N, A) with adding the time dimension. The SE network of BURT network is of the form G(N, A, T), where N denotes the sets of stations, A denotes the arcs of the sections of lines, and T denotes sets of the scheduled arrival/departure time of trains. The basic elements of the SE network are described as follows.

(1) Temporal Nodes. Let r t l denote the temporal node, where the trains run through station r of line l at time t. In general, if there are n lines crossing the station and k trains running on each line, the station will be expanded into nk temporal nodes.

(2) Temporal Arcs. Let a(r t1 l, s t2 l) denote the temporal section arcs from temporal node r t1 l to temporal node s t2 lof line l. Similarly an arc a(r, s) of route network is expanded into k arcs as the form (r t1 l, s t2 l)k where k equals the number of trains running though the section of the line based on schedule. As defined in the previous section, c rs denotes the travel time of arc (r, s). Let c t1,t2 rs,l denote the travel time of temporal section arc a(r t1 l, s t2 l), and let t 1, t 2 be the arrival time at nodes r and s. c t1,t2 rs,l can be calculate as follows:

ct1,t2rs=t2t1t1,t2T,r,sN,aA. (1)

Let a(r t1 l1, r t2 l2) denote the temporal transfer arcs of the station r from line l 1 to l 2. As the endpoints of the arcs are the temporal nodes r t1 l1 and r t2 l2, so the travel time c t1′,t2 r,l1l2 of the transfer arc (r t1 l1, r t2 l2) is

ct1,t2r,l1l2=t2t1t1,t2T,r,sN,aA. (2)

In addition, there are temporal arcs (r t1, r t2) that represent passengers having to wait at station r from time t 1 to t 2, defined as a(r t1 l, r t2 l). Let ct1¯,t2r,l denote the passengers waiting time in temporal nodes r t1 l at the arrival time t1¯ and leave at scheduled departure time t 2:

c  t1¯,t2r,l=t2t1¯t1¯,t2T,r,sN,aA. (3)

Figure 1 shows the SE network based on the route network upside, and the scheduled times of Figure 1 are shown in Table 1. Actually, Figure 1 shows all possible paths from station a1 to b3 at 7:30 to 8:10 a.m. For example, the path from a17:30 L1a27:33 L1a27:41 L2b37:49 L2 corresponds to passengers leaving node a1 at time 7:30 with train 0L11, arriving at a2 of Line 1 at 7:33, then transferring to a2 of Line 2 at 7:42, waiting for 0L21 and boarding train 0L21 at 7:47, and finally reaching b3 at 7:49.

Figure 1.

Figure 1

A SE network based on the route network of one O-D pair in time period.

Table 1.

Partial schedule of the small network.

Train number Station Arrival time Departure time Line Direction
0L11 a1 7:30 Line 1 Upstream
0L11 a2 7:33 7:34 Line 1 Upstream
0L11 b2 7:40 Line 1 Upstream
0L13 a1 7:48 Line 1 Upstream
0L13 a2 7:51 7:52 Line 1 Upstream
0L13 b2 7:58 Line 1 Upstream
0L21 A2 7:41 Line 2 Upstream
0L21 B2 7:46 7:47 Line 2 Upstream
0L21 B3 7:49 Line 2 Upstream
0L23 A2 7:58 Line 2 Upstream
0L23 B2 8:05 8:06 Line 2 Upstream
0L23 B3 8:08 Line 2 Upstream

In the SE network, temporal paths of O-D stations are a sequence of temporal arcs. Generally, a temporal path always consists of the 3 kinds of arcs proposed above. Computationally, schedule-expanded nodes and arcs can often be generated using the route network and timetable when solving an optimization problem, for example, to find the most optimal hyperpaths, the least travel time cost, and the most optimal path between O-D pairs. As the possible temporal paths consist of hyperpath with time dimension, k-shortest paths searching algorithm [6, 14] can be used in searching the possible temporal paths, if and only if the condition holds:

tkoidjmintkoidj+ttor,tkoidj1+d1,tkwat,oidjmintkwat,oidj+twat,tor,tkwat,oidj1+d2,tknN, (4)

where t k oidj denotes the travel time of kth path l k in path set L tlist, t k oidj denotes the minimum travel time of the path set L tlist, t k wat,oidj denotes the minimum waiting time of the path set, t tor denotes the maximum tolerance travel time of the path, t wat,tor denotes the maximum tolerance waiting time of the path, t k n denotes the number of transfers times, N denotes the maximum tolerance number of transfers times, and d1 and d2 denote the maximum magnification of the tolerance time. All these tolerance parameters are user-defined.

3. Stochastic Dynamic User Equilibrium Assignment Model

3.1. Generalized Travel Time Cost in SE Network

The generalized travel time cost gc rs on arc (r, s) is subjected to a disutility that encompasses four weighted combination components: (i) in-vehicle travel time cost gc ivt rs; (ii) waiting time cost gc WAT r,l; (iii) transfer time cost gc trt r,l1l2; (iv) passenger overload cost gc~t1,t2r,l. Denote β 1, β 2 by the weighting factors for waiting time and transfer time, respectively, and β 3 by the passenger overload delay in weighted time unit parameter. The generalized travel time cost gc rs of the arc a(r, s) can be expressed as

gcrs=gcivtrs+gcWATr,l+gctrtr,l1l2+gc~t1,t2r,l. (5)

Considering the components of the generalized travel time cost function in SE network, the components on the right side of the equation in a time interval Δt may be described as follows.

(i) If the number of passengers is large enough to make passengers discomfortable, the cost of the in-vehicle travel time, as T IVT rs, may be amplified. When the number of the passengers is small, for example, less than the number of seats, it is not crowded in the train. Let ω = x t1,t2 rs/C l denote trainload. With the trainload increasing, passengers may feel more discomfortable. We defined a piecewise function to describe the discomfort level with the passengers number increasing and the trainload in the temporal section arcs as

fc(xt1,t2rs)=1;xt1,t2rsClω0,1+ϕ1(xt1,t2rs)xt1,t2rsClω0,ω0<xt1,t2rsClω1;1+ϕ1(ω1Cl)(ω1ω0)+ϕ1(xt1,t2rs)(xt1,t2rsClω1);ω1<xt1,t2rsCl;ω0=ZlCl,ϕ1xt1,t2rs=α1ωγ,ω=xt1,t2rsCl, (6)

where Z l denotes the seat number in the train and α 1 and γ are user-defined factors. The in-vehicle travel time cost in SE network is

gcivtrs=fcxrsTIVTrs=ct1,t2rsfcxt1,t2rs. (7)

(ii) According to train schedule, it is applicable to calculate the waiting time T WAT rs by the subscripts of the temporal arc:

gcWATr,l=β1TWATrs=β1ct1,t2r,l. (8)

(iii) Transfer time includes two factors: the transfer times and the walking time T TRT rs from one line transfer to the other line at a transfer station. That is because the transfer contains the process of “alighting-walking-boarding.” So the passengers have to change from one vehicle/train to another vehicle/line which will increase the passengers' extra perceived costs. Letting σ denote the extra perceived cost factor which is affect by the transfer times, transfer time cost can be expressed as

gctrtr,l1l2=β2TTRTrs+σ=β2ct1,t2r,l1l2+σ. (9)

(iv) Passenger overload delay is the additional time that passengers spend on waiting for next train of temporal section arc due to the insufficient train capacity when they cannot board the first coming train of the temporal section. Let β 3 denote the passenger overload delay penalty factor and let m rs,k denote the overload delay of temporal arc (r, s) in path k:

gc~t1,t2r,l=β3mrs,k. (10)

Combined with the generalized travel time cost gc rs of the temporal arc a(r, s) in temporal arcs list, the generalized travel time cost to reach at destination d j from original o i node GC k oidj can be expressed as

gcrsxt1,t2rs=gcivtrs+gcwatr,l+gctrtr,l1l2+gc~odyr,l,ar,sa,GCkoidj=(r,s)agct1,t2rsδrs,koidj,GCkoidj=,iftΔt. (11)

3.2. Flow Conservation in SE Network

Passenger flows on temporal arcs which satisfy the following constraints. For each O-D pair o i d j, the trip demand q oidj can be split into all effective temporal paths as

qoidj=lkLtlistvkoidj, (12)

where v k oidj denotes the passenger flows assign to the path l k of each o i d j.

Each temporal arc a(r, s) should satisfy the flow conservation of each specific temporal path as

vrs=a(r,s)alkLtlistδrs,koidjvkoidj, (13)

where v rs denotes the passenger flows assign to a(r, s).

Furthermore, temporal arcs flow should satisfy the capacity constraint where would not be an overload in the rail transit train to which the temporal section arcs a(r, s) belong:

vrsKrs,l, (14)

where K rs,l denotes the capacity a(r, s) of in line l.

3.3. SUE Assignment Model Formulation

By using the schedule expanded network, the temporal and spatial variation of passengers' trip would be represented by the temporal path in network. The temporal paths in the network are associated with time and space. Hence, the dynamic rail transit assignment can be transformed into static transit assignment problem.

According to the definition, a stochastic user equilibrium (SUE) is achieved in a schedule-based transit network when the allocation of passengers between alternative paths conforms to the following logit model:

Infkoidjfkoidj=θGCkoidjGCkoidj, (15)

where k and k′ are the alternative temporal paths l k and l k associated with the same O-D pair o i d j and θ > 0 is a given parameter which is used to measure the different degree of passengers' knowledge about state of the paths in the network. The parameter θ will increase when passengers are more familiar with the schedule and travel time cost of the network. As θ, the SUE approximately is equal to that of user equilibrium (UE).

Based on (11) and (15), we have

Infkoidjfkoidj=θ(gct1,t2kgct1,t2k)+(gct1,t2k,lgct1,t2k,l)+gct1,t2k,l1l2gct1,t2k,l1l2+gc~t1,t2k,lgc~t1,t2k,l. (16)

As the total travel demands increase, the proportionate distribution of passenger flow between the two paths remains the same until one or more temporal arcs on either path are saturated. If v rs = K rs,l, further increase in total travel demands would cause congestion on paths, leading to the increase overload delay, which will affect the path choice. And the crowding penalty and the overload delay are the equilibrium mechanism of logit-based assignment model in this paper.

The SUE assignment problem of the SE network will be formulated as follows:

P1:minZ=(r,s)a0vrsgcrs(x)dx+1θar,skkLlistvkoidjInvkoidj, (17)
s.t.qoidj=kLtlistvkoidj, (18)
vrs=ar,sakLtlistδrs,koidjvkoidj, (19)
vrsKrs,l, (20)
vkoidj0, (21)
ar,sa,kLtlist. (22)

The equivalence and uniqueness of the model have been proved in study (6). By constructing the Lagrangian function for problem P1, the Kuhn-Tucker conditions of P1 can be given as follows:

Invkoidj+θr,sa(gcrsδrs,koidjmrs,koidj)loidj=0, (23)

where m rs,k oidj and l oidj are the corresponding Lagrangian multiplier to (19) and (20). Equation (17) can be easily transformed into the following logit-based model, which is the kth path probability of path l k in L tlist:

pkoidj=exp(θGCkoidj+mkoidj)iLtlistexp(θGCioidj+mkoidj), (24)

where m k oidj denotes the sum of Lagrangian multipliers m rs,k oidj along path l k in L tlist.

3.4. Solution Procedures

If the capacity constraints are ignored, problem P1 becomes a standard SUE assignment on transit network. This paper developed an advanced method of successive averages (MSA) algorithm to solve problem P1 with capacity constraints.

Rewrite (23) as

vkoidj=Inθgcivtrs+gcwatr,l+gctrtr,l1l2a(r,s)kMrsLOD, (25)

where L OD = exp⁡(l oidj) and M rs = exp⁡(m rs,k oidj). M rs is the factor corresponding to overload delay and is to be determined at the arc a(r, s) ∈ l k. With the advanced MSA, a simple solution procedure is put forward to solve the problem P1 with the given O-D demands q oidj within time interval Δt.

Step 1 (network construction). —

Calculate the temporal possible paths set L list in the analytical network with SE network representation method for all O-D pairs o i d j ∈ OD.

Step 2 (initialization). —

Set L OD n = 1 and M rs n = 1 for each arc a(r, s) ∈ l k for ∀o i d j ∈ OD, and set iterations n = 1.

Step 3 (iteration). —

Calculate ((26)-(27)) step by step until the convergent conditions are satisfied for each a(r, s) ∈ k and o i d j ∈ OD.

For each a(r, s) ∈ k, calculate the following equation:

vkoidj(Ln,Mn)=exp(θ(gcivtrs+gcwatr,l+gctrtr,l1l2))a(r,s)kMrsnLoidjn,ηrsn=Kt1,t2rs,loidjODkLtlistδrs,koidjvkoidjLn,Mn,Mrsn+1=min1,ηrsnMrsn. (26)

For each o i d j ∈ OD, calculate the following equation:

ηoidjn=qoidjkLlistboidj,kvkoidjLn,Mn,Loidjn+1=ηoidjnLoidjn. (27)

Then, n = n + 1.

Let Ln and Mn be the sets of l oidj and m rs,k oidj. The superscript n denotes iterations, b oidj,k denotes arc-demand incidence factor equal 1 if vkoidj(Ln,Mn) loading in path l k belongs to O-D demands q oidj, else b oidj,k = 0.

Step 4 (convergence and output results). —

Calculate the gap function, if G(n)=oidjODδrs,koidj(vkoidj,n+1-vkoidj,n)2/oidjODqoidj<ε, then stop and ε is the presupposed gap factor. Then, output arcs flow and overload delay value.

For each a(r, s) ∈ k, calculate

vrs=a(r,s)akLtlistδrs,koidjvkoidj,n(Ln,Mn),mrs,koidj=lnMrsnθβ3. (28)

Else, back to Step 3.

4. Numerical Example of Model Application in BURT Network

The proposed models and solution algorithm are used to apply to Beijing urban railway transit network for passenger flow distribution estimation. The network consists of 17 lines and 281 stations including 41 transfer stations, which is shown in Figure 2. There are a total of 562 nodes, 624 running sections, and 90 transfer arcs in the topological network.

Figure 2.

Figure 2

Beijing urban rail transit network (April, 2014).

In this study, the input data of the assignment model requires the train running schedules of each transit line, the transfer walking time of each transfer, and the train capacity of each line. Total O-D demands of this time period (7:00~9:00 a.m.) are 1095835 among 54468 O-D pairs. Parts of these data are from the website of Beijing Metro Company, Wikipedia of Beijing Subway, and Beijing Municipal Commission of Transport (BMCT); others are from the corresponding surveys. Parts of the input data are shown in Table 2. Since the schedule data is a large table with over 40,000 records in data table, Table 2 only shows partial data.

Table 2.

Parts of the input data.

(a).

Train running schedule of transit lines (part of the data)
Train number Station Arrival time Departure time Line Direction
410000 Fuxingmen 7:03:43 7:04:28 Line 1 Upstream
410002 Fuxingmen 7:05:48 7:06:33 Line 1 Upstream
410001 Fuxingmen 7:01:12 7:01:47 Line 1 Downstream
410003 Fuxingmen 7:03:17 7:04:02 Line 1 Downstream
420000 Xizhimen 7:00:15 7:01:15 Line 2 Upstream
420002 Xizhimen 7:02:15 7:03:15 Line 2 Upstream
420001 Xizhimen 7:01:34 7:02:34 Line 2 Downstream
420003 Xizhimen 7:03:34 7:04:34 Line 2 Downstream

(b).

Transfer walking time at different transfer station (parts of the data)
Transfer stations Original line Terminal line Transfer walking time (/s) Transfer stations Original line Terminal line Transfer walking time (/s)

Xizhimen Line 2 Line 4 164 Fuxingmen Line 1 Line 2 394
Line 4 Line 2 209 Line 2 Line 1 150

Dongzhimen Line 2 Line 13 358 Jianguomen Line 1 Line 2 169
Line 13 Line 2 270 Line 2 Line 1 81

Xidan Line 1 Line 4 235 Dongdan Line 1 Line 5 275
Line 4 Line 1 360 Line 5 Line 1 323

Zhichunlu Line 10 Line 13 241 Dongsi Line 5 Line 6 357
Line 13 Line 10 225 Line 6 Line 5 339

National Library Line 4 Line 9 166 Xuanwumen Line 2 Line 4 166
Line 9 Line 4 45 Line 4 Line 2 619

Beitucheng Line 8 Line 10 85 Guomao Line 1 Line 10 309
Line 10 Line 8 90 Line 10 Line 1 322

Huoying Line 8 Line 13 315 Shaoyaoju Line 10 Line 13 211
Line 13 Line 8 215 Line 13 Line 10 207

Chongwenmen Line 2 Line 5 238 Liuliqiao Line 9 Line 10 80
Line 5 Line 2 392 Line 10 Line 9 103

Hujialou Line 6 Line 10 142 Lishuiqiao Line 5 Line 13 217
Line 10 Line 6 127 Line 13 Line 5 231

(c).

Train capacity of each line (persons per vehicle)

Lines Line 1 Line 2 Line 4 Line 5 Line 6 Line 8
Capacity 1850 1850 1830 1840 2570 1980
Lines Line 9 Line 10 Line 13 Line 14 Line 15
Capacity 1900 1900 1850 2570 1980
Lines Changping line Yizhuang line Fangshan line Daxing line Batong Line Airport express
Capacity 1900 1900 1900 1830 1900 448

In order to verify the results of the P1 above, we select one day in April 2014 of the AFC system to obtain the O-D demands as presented above which is provided from the BMCT.

Parameters are calibrated by SPSS statistically with the existing research data, which is shown in Table 3. The assignment period is from 7:00 a.m. to 9:00 a.m. The network assignment is running on an AMD Core 16 quad, 8 Gb Ram server. The computing time is about 20 minutes.

Table 3.

The values of the parameter in the model.

Parameters β 1 β 2 β 3 ε α 1 γ
Values 1.5 2 1 0.1% 0.15 4
Parameters σ t tor t wat,tor d1 d2 N
Values 3.0 20 15 10% 5% 3

Figure 3 indicates the iterations of the MSA for θ = 1. The gap function converges rapidly at the beginning and slowly after 80 iterations (0.637%), suggesting that the advanced MSA has good convergence property in large scale network calculation. In this study, the presupposed gap factor ε = 0.1%. The final gap function is 0.1%, which indicates that the assignment results are much close to the equilibrium results. Seeing that the gap function is less than 0.5% after iterating 92 times (0.49%) which is demonstrated in Figure 3, solution results with less than 0.5% gap function are expected to be acceptable in practice, which the iterations and calculating time can be reduced.

Figure 3.

Figure 3

Convergence characteristics for θ = 1.

The computation results are showed in Figure 4 from 7:00 a.m. to 9:00 a.m., and the time interval is 30 minutes. In order to illustrate assignment results of passengers flow distribution in BURT network directly, this paper develops a system which outputs trainload of each section. Besides, this paper defines different color of the transit line sections to indicate the trainload which is shown in Figure 4. The colors are defined to be four degrees of trainload, where green indicates ω ≤ 0.8, yellow indicates 0.8 < ω ≤ 1, orange indicates 1 < ω ≤ 1.2, and red indicates ω > 1.2.

Figure 4.

Figure 4

Passenger flow distribution in BURT network 7:00–9:00 a.m., each figure displays one time interval of 30 minutes.

To further analyze the computing results, we compare the computing flows distributing on sections of the lines with the survey data, which includes passenger flows and trainload during the same section in Figure 5. It can be obviously seen that the average errors between computing and observed passenger flows are acceptable.

Figure 5.

Figure 5

Comparison of surveyed flows, computed flows, and capacity in transit sections.

In addition, the parameter sensitivity test can be put forward to obtain full understanding of the proposal model. This study changes the parameter θ at a time with all the other parameters being fixed to estimate different assignment results by the assignment method. Figure 6 indicates the path choice probability deviation when taking different values of θ. Some resultant sections over delays are shown in Table 4 of the whole network for θ = 0.1 to 20, and flows loading on some sections are shown in Figure 7 when θ takes different values.

Figure 6.

Figure 6

Path choice probability deviation with different values of θ.

Table 4.

Overload delays of transit sections for different values of the parameter θ.

Transit sections Line Overload delays of transit sections for different values of θ (/s)
0.1 0.2 0.5 1 2 5 10 20
FXM-XD 1 74.25 83.55 89.01 106.25 113.83 119.02 137.15 151.38
ZSM-JST 2 15.07 18.92 22.12 24.38 25.72 26.84 28.43 34.53
CSK-XWM 4 22.22 28.21 31.90 34.61 38.12 41.73 43.03 46.84
HB-HN 5 150.61 165.12 172.53 178.7 189.3 197.8 201.3 206.4
HJL-DDQ 6 34.41 45.21 50.31 54.12 58.91 64.5 67.5 72.69
ATZX-BTC 8 36.3 47.21 53.36 57.56 63.35 69.3 71.4 85.4
BJXZ-JSBWG 9 94.95 120.8 136.91 148.85 164.28 180.22 186.21 203.15
BTC-JDM 10 72.79 92.97 104.28 113.29 124.45 136.91 140.84 153.95
GM-JTXZ 10 81.25 102.59 116.62 125.88 138.62 151.56 156.48 172.35
XEQ-SD 13 152.30 208.23 223.16 247.18 262.46 281.34 290.47 348.22

Figure 7.

Figure 7

Impacts of θ in assignment results of train running sections.

(1) The vertical axis in Figure 6 represents the normalized value comparison to the path with the least generalized travel time cost. The horizontal axis in Figure 6 represents the choice probability deviation. A large value of θ means that passengers are more sensitive to the difference between the generalized travel costs of their paths. When the value of θ increases, subtle difference in the generalized cost between the alternative paths will lead to a huge probability deviation in the choice probability. Hence, the path choice probability deviation distribution curve is smooth with a small value of θ and steep with a large value of θ.

(2) It can be seen in Table 4 that the overload delay of the whole network and the partial network would be increased with the increase of parameter θ. With the increase of parameter θ, the passengers would have more knowledge of the network with the paths, congestion status, and schedule or timetable in choosing the departure time and trains of temporal paths. As there is no other path with less generalized travel time cost, passengers would like to board the first coming train until full, which will increase congestion cost because passengers understand clearly that waiting for the next train may not reduce the total cost. And the assignment results have demonstrated the phenomenon that since each passenger has high degree of knowledge for network, they tend to choose the same path as they expected at the same time; however, this increases actual overload delay cost because of the capacity constraint.

(3) As the parameter θ varies from 0.1 to 20, it can be seen that the assignment results change slightly in Figure 6 during 8:00 to 8:30 a.m. As presented above, a large value of θ means a full knowledge of the network, with a less perception generalized travel time cost function error, and the passengers tend to choose the optimal path with minimum perception cost. A small value of θ indicates that passengers would choose many paths including some high cost paths at the beginning of their travel randomly due to the limited understanding of the network. As the assignment results in different values of the parameter θ comparing with the surveyed flows, the value of θ is better to take the range of [1,5] while the average error is 10.1%~12.3% to the surveyed flows.

5. Conclusion

A SUE assignment model with capacity constraints has been described in this paper to estimate and predict the passenger flow temporal and spatial distribution in the rail transit network. An advanced MSA algorithm is presented to solute the assignment model which is incorporated with the stochastic effect of passengers' choice behaviors, the schedule of transit system, capacity constraints of trains, and a large-scale rail transit network. By using schedule expanded network representation, the time-space dynamic assignment problem is formulated as a generalized cost model. Furthermore, this study considers some important factors of passengers, for example, passenger overload delay, which they determine to minimize in their path choice. Passenger overload delay is defined as unknown variables which are determined by the equilibrium mechanism and train capacity constraints with the arcs generalized cost function used in this study. Also this paper analyzes the equilibrium mechanism equivalent to the condition that the mathematical problem will be solved to the equilibrium passenger overload delay when the arcs reach their capacity level.

The model provides an important idea to evaluate the performance of the rail transit system subjected to train running sections load. The numerical example in application of BURT network in this study demonstrates that this model can be used on practical large-scale network due to the rapid convergence (within 200 iterations) and reasonable precision (10.1%~12.3%) in practice. With further research of the parameter sensitivity, the results indicate that passengers with better knowledge of the network would result in more overload delay in their trips and cause various assignment results.

As BURT network expanded rapidly, it has become a more and more critical task to scientifically estimate the passenger flow distribution in the network. For further research, the proposal model applied to BURT network will be extended with passenger behaviors, such as queuing choice and transfer station choice.

Acknowledgments

This research is mainly supported by a grant from Natural Science Foundation of Beijing, China (9132015), and the Fundamental Research Funds for the Central Universities (2014JBM058). The work in this study is supported by the State Key Laboratory of Rail Traffic Control & Safety (RCS2014ZTY1), Beijing Higher Education Young Elite Teacher Project (YETP0555), Fundamental Research Funds for the Central Universities (2014JBZ008), and Fundamental Research Funds for the Central Universities (2014JBM058). The authors would like to thank the anonymous referees for their helpful, critical, and constructive comments on an earlier version of the paper.

Conflict of Interests

The authors declare that there is no conflict of interests regarding the publication of this paper.

Authors' Contribution

(1) Dr. Dewei Li has contributed to Section 3.2, in which he helps to modify and add the flow conservation conditions. (2) Dr. Haodong Yin has contributed to Section 4, in which he helps to develop the system to verify the model application. (3) Dr. Dewei Li and Dr. Haodong Yin have proposed valuable suggestions to the paper modifications.

References

  • 1.Zhong M., Si B. Development of a transfer-cost-based passenger flow assignment model for Beijing rail transit network using automated fare collection data. Proceedings of the 90th Annual Meeting of the Transportation Research Board; 2011; [Google Scholar]
  • 2.Xu W., Miao L., Lin W.-H. Stochastic user equilibrium assignment in schedule-based transit networks with capacity constraints. Discrete Dynamics in Nature and Society. 2012;2012:15. doi: 10.1155/2012/910754.910754 [DOI] [Google Scholar]
  • 3.Decea C. H. J., Fernandez L. J. E. Transit assignment to minimal routes: an efficient new algorithm. Traffic Engineering & Control. 1989;30(10):491–494. [Google Scholar]
  • 4.Spiess H., Florian M. Optimal strategies: a new assignment model for transit networks. Transportation Research Part B. 1989;23(2):83–102. [Google Scholar]
  • 5.Lam W. H. K., Gao Z. Y., Chan K. S., Yang H. A stochastic user equilibrium assignment model for congested transit networks. Transportation Research Part B: Methodological. 1999;33(5):351–368. doi: 10.1016/s0191-2615(98)00040-x. [DOI] [Google Scholar]
  • 6.Kurauchi F., Bell M. G., Schmöcker J.-D. Capacity constrained transit assignment with common lines. Journal of Mathematical Modelling and Algorithms. 2003;2(4):309–327. doi: 10.1023/b:jmma.0000020426.22501.c1. [DOI] [Google Scholar]
  • 7.Wu J. H., Florian M., Marcotte P. Transit equilibrium assignment: a model and solution algorithms. Transportation Science. 1994;28(3):193–203. doi: 10.1287/trsc.28.3.193. [DOI] [Google Scholar]
  • 8.Nuzzolo A. Schedule-based transit assignment models. In: Lam W. H. K., Bell M. G. H., editors. Advanced Modelling for Transit Operations and Service Planning. Oxford, UK: Pergamon; 2003. pp. 93–124. [Google Scholar]
  • 9.Nuzzolo A., Crisalli U. Schedule-Based Modeling of Transportation Networks. Berlin, Germany: Springer; 2009. The schedule-based modeling of transportation systems: recent developments; pp. 1–26. [Google Scholar]
  • 10.Lam W. H. K., Bell M. G. H. Advanced Modeling for Transit Operations and Service Planning. Emerald Group Publishing; 2002. [Google Scholar]
  • 11.Wilson N. H. M., Nuzzolo A. Schedule-Based Modeling of Transportation Networks. Springer; 2008. [Google Scholar]
  • 12.Nuzzolo A., Russo F., Crisalli U. A doubly dynamic schedule-based assignment model for transit networks. Transportation Science. 2001;35(3):268–285. doi: 10.1287/trsc.35.3.268.10149. [DOI] [Google Scholar]
  • 13.Moller-Pedersen J. Assignment model of timetable based systems (TPSCHEDULE). Proceedings of the 27th European Transportation Forum, Seminar F; 1999; Cambridge, UK. pp. 159–168. [Google Scholar]
  • 14.Tong C. O., Wong S. C. A stochastic transit assignment model using a dynamic schedule-based network. Transportation Research, Part B: Methodological. 1998;33(2):107–121. doi: 10.1016/s0191-2615(98)00030-7. [DOI] [Google Scholar]
  • 15.Nguyen S., Pallottino S., Malucelli F. A modeling framework for passenger assignment on a transport network with timetables. Transportation Science. 2001;35(3):238–249. doi: 10.1287/trsc.35.3.238.10152. [DOI] [Google Scholar]
  • 16.Hamdouch Y., Lawphongpanich S. Schedule-based transit assignment model with travel strategies and capacity constraints. Transportation Research Part B: Methodological. 2008;42(7-8):663–684. doi: 10.1016/j.trb.2007.11.005. [DOI] [Google Scholar]
  • 17.Alfa A. S., Chen M. Temporal distribution of public transport demand during the peak period. European Journal of Operational Research. 1995;83(1):137–153. doi: 10.1016/0377-2217(93)e0311-k. [DOI] [Google Scholar]
  • 18.Poon M. H., Wong S. C., Tong C. O. A dynamic schedule-based model for congested transit networks. Transportation Research Part B: Methodological. 2004;38(4):343–368. doi: 10.1016/s0191-2615(03)00026-2. [DOI] [Google Scholar]
  • 19.Nielsen O. A. A stochastic transit assignment model considering differences in passengers utility functions. Transportation Research Part B: Methodological. 2000;34(5):377–402. doi: 10.1016/s0191-2615(99)00029-6. [DOI] [Google Scholar]
  • 20.Nuzzolo A., Crisalli U., Rosati L. A schedule-based assignment model with explicit capacity constraints for congested transit networks. Transportation Research Part C: Emerging Technologies. 2012;20(1):16–33. doi: 10.1016/j.trc.2011.02.007. [DOI] [Google Scholar]
  • 21.Hamdouch Y., Ho H. W., Sumalee A., Wang G. Schedule-based transit assignment model with vehicle capacity and seat availability. Transportation Research Part B: Methodological. 2011;45(10):1805–1830. doi: 10.1016/j.trb.2011.07.010. [DOI] [Google Scholar]
  • 22.Sumalee A., Tan Z., Lam W. H. K. Dynamic stochastic transit assignment with explicit seat allocation model. Transportation Research Part B: Methodological. 2009;43(8-9):895–912. doi: 10.1016/j.trb.2009.02.009. [DOI] [Google Scholar]