Abstract

Assessing the accuracy of predictive models is critical because predictive models have been increasingly used across various disciplines and predictive accuracy determines the quality of resultant predictions. Pearson product-moment correlation coefficient (r) and the coefficient of determination (r2) are among the most widely used measures for assessing predictive models for numerical data, although they are argued to be biased, insufficient and misleading. In this study, geometrical graphs were used to illustrate what were used in the calculation of r and r2 and simulations were used to demonstrate the behaviour of r and r2 and to compare three accuracy measures under various scenarios. Relevant confusions about r and r2, has been clarified. The calculation of r and r2 is not based on the differences between the predicted and observed values. The existing error measures suffer various limitations and are unable to tell the accuracy. Variance explained by predictive models based on cross-validation (VEcv) is free of these limitations and is a reliable accuracy measure. Legates and McCabe’s efficiency (E1) is also an alternative accuracy measure. The r and r2 do not measure the accuracy and are incorrect accuracy measures. The existing error measures suffer limitations. VEcv and E1 are recommended for assessing the accuracy. The applications of these accuracy measures would encourage accuracy-improved predictive models to be developed to generate predictions for evidence-informed decision-making.

Introduction

Predictive models have been increasingly used to generate predictions across various disciplines in the environmental sciences in parallel to the recent advancement in data acquisition, data processing and computing capabilities. Accuracy of the predictive models is critical as it determines the quality of their predictions that form the scientific evidence for decision-making and policy. Therefore, it is important to correctly assess the predictive accuracy. Many accuracy/error measures have been developed to assess the accuracy of predictive models, including correlation coefficient (r) and the coefficient of determination (r2) for numerical data [13]. However, it has been advised that r and r2 should not be used as a measure to assess the accuracy of predictive models for numerical data because they are biased, insufficient or misleading [410]. It has been further advised that r is a measure of correlation, not accuracy [11].

Despite the advice above, r and r2 have been used as predictive accuracy measures in various disciplines in numerous studies and have even been used as accuracy measures in some computing programs/software. Furthermore, r and r2 are among the most widely used measures to assess model performance in many disciplines [25,1214]. Their wide application in assessing predictive accuracy could be resulted from many reasons, such as that: 1) although r was found to be a biased measure of predictive accuracy, it was suggested as a measure of potential skill [7]; 2) the differences between the predicted values and the observed values of validation samples are sometimes termed residuals [2], but they are not the residuals that r and r2 are usually applied to [15,16]; 3) r and r2 were proven to be a component of mean square error (MSE) [17], and hence a component of root MSE (RMSE) that is one of the most commonly used error measures in the environmental sciences [6]; 4) a weighted r was also proposed to alleviate the problem associated with r [3]; 5) the advice above were based on computed, modelled or predicted values that were sometimes referred to as fitted values [5,18] which were used to derive r and r2 [15,16]; and 6) no solid evidence was provided to support the advice, although r and r2 were proven to biased [9,10]. Consequently, the advice becomes less convincing and has played little role in preventing people from using r and/or r2 to assess the accuracy of predictive models.

This study aims to 1) clarify relevant confusions about r and r2 and illustrate why they are incorrect measures of predictive accuracy, 2) demonstrate how they are misleading when they are used to assess the accuracy of predictive models, and 3) justify what should be used to assess the accuracy.

Methods

In this study, r was assumed to be the most often used Pearson product-moment correlation coefficient, and r2 was the coefficient of determination. In fact, r is the same as the r in r2 when r is positive, which is often the case for predictive modelling. To avoid any confusion, in this study relevant concepts are defined as below:

  1. the predicted values (y) were the values obtained from predictive models based on a validation method,

  2. the observed values (x) were the values of validation samples,

  3. fitted line was based on y and x and was assumed to be linear with a certain slope and an intercept, and

  4. fitted values were derived based on the fitted line.

2.1. Scenarios simulated for why r and r2 are incorrect measures of predictive accuracy

The relationship between y and x could vary with studies [4,13,1921]. It was expected to be linear with a slope of 1 and an intercept of 0 (i.e., ŷa = x, where ŷa was the fitted values based on y and x, and was equal to y) if a perfect match between y and x was obtained (Fig 1a and 1b). Any predictions deviating from y = x line were not accurate and contained certain errors. The following two scenarios were used to demonstrate why r is an incorrect measure of predictive accuracy as they closely represented the reality above. Scenario 1: the fitted values based on y and x were derived from ŷb = βx (Fig 1a); and scenario 2: the fitted values were derived from ŷb = β0 + β1x (Fig 1b). They deviated from the perfect match: ŷa = x.

Fig 1. The relationship of the observed values (x) and predicted values (y), where fitted line ŷa = x, suggesting y and x are perfectly matched.

Fig 1

a) the fitted line ŷb = βx deviates from ŷa = x by (1 − β)x; and b) the fitted line ŷb = β0 + β1x deviates from ŷa = x by (1 − β1)x − β0. For each pair of predicted and observed values (i.e., (x1, y1), (x2, y2) and (x3, y3)), the green lines represent the distance between the fitted and predicted values used for calculating r, and the red dashed lines represent the distance between the predicted and observed values.

In each scenario, we considered four situations (Fig 1a and 1b), i.e., predicted values were:

  1. on the fitted line ŷa = x;

  2. on the fitted line ŷb = βx or ŷb = β0 + β1x;

  3. above the fitted line ŷb = βx or ŷb = β0 + β1x; and

  4. below the fitted line ŷb = βx or ŷb = β0 + β1x.

2.2. Scenarios simulated for how r and r2 are misleading

In reality, the slope often deviates away from 1 for y and x; and the intercept also usually deviates from zero. To quantitatively prove how r is misleading in assessing the accuracy of predictive models, four scenarios were simulated (S1 Fig):

  1. x and y were perfectly linearly related with an intercept of 0, i.e., y = βx (Panel A in S1 Fig);

  2. x and y were perfectly linearly related with intercepts changing with their associated slopes, i.e., y = β0 + β1x (Panel B in S1 Fig);

  3. as the first scenario, but with certain noise (ε) in y, i.e., y = βx + ε (Panel C in S1 Fig); and

  4. as the second scenario, but with ε in y, i.e., y = β0 + β1x+ ε (Panel D in S1 Fig).

The first two scenarios were the extensions of the scenarios presented in Fig 1a and 1b, where the predictions matched the observations well and their relationship was assumed to be perfectly linear, but with a slope deviating from 1 and with or without intercepts respectively. They were largely ideal and only used to conveniently illustrate relevant issues associated with r.

The last two scenarios more closely reflected the reality [19,20], particularly the last scenario, because predictions were usually noisy and quite often the smaller observed values were predicted larger and the larger observed values were predicted smaller [4,13,21].

It was argued that measures using squared values are more sensitive to data variation or sample size than measures using the absolute values [8,22,23]. To test whether predictive accuracy measure depends on sample size and data variation, the last scenario above was further extended, where the predicted values were with different sample sizes and with noise of different data variations.

2.3. Assessment of predictive accuracy

Predictive accuracy should be measured based on the difference between the observed values and predicted values. However, the predicted values can refer to different information. Thus the resultant predictive accuracy can refer to different concepts. The predicted values quite often refer to the values that were predicted or modelled based on training samples [18]; and the resultant accuracy has been termed predictive accuracy in various studies. However, this accuracy is essentially measuring how well the model fits the training samples, thus it is not measuring the predictive accuracy. Predictive accuracy can also be based on the differences between the predicted values for, and the observed values of, new samples (e.g., validation samples). This is the predictive accuracy we refer to in this study.

To demonstrate how misleading r is, we need to select an appropriate measure as a reference. All mean absolute error (MAE) and MSE related measures, and variance explained by predictive models based on cross-validation (VEcv) use the correct difference [18]. Of these measures, VEcv doesn’t share the limitations associated with these error measures according to Li [18], so VEcv was selected as a control to assess the predictive accuracy and to compare with r. Additionally, VEcv was introduced to avoid relevant issues associated with Nash and Sutcliffe’s efficiency [24], G-value [25] and model efficiency [26]; and they are equivalent to VEcv if they are based on predictions derived from validation dataset [18]. Although VEcv was initially proposed for predictive models based on cross-validation because 10-fold cross-validation would produce more reliable results [27,28], it can be applied to results based on any validation methods or to any new samples besides validation samples.

To select reliable accuracy measure(s) for future studies, some commonly used error and accuracy measures for numerical data were evaluated (Table 1). Two other accuracy measures, Willmott et al.’s refined index of agreement (dr) [29,30] and Legates and McCabe’s (E1) [31], were considered. They were presented in percentage to make their resultant values comparable with VEcv.

Table 1. The mathematical definitions of relevant measures used in this study [8,15,18,30].

Error/accuracy Measure Definition*
Mean absolute error (MAE) 1n|yiyi^|/n
Mean square error (MSE) 1n(yiyi^)2/n
Relative MAE (RMAE) (MAEy¯)100 (%)
Root MSE (RMSE) MSE1/2
Relative RMSE (RRMSE) (RMSEy¯)100 (%)
Standardised RMSE (SRMSE) RMSE/s
Mean square reduced error (MSRE) MSE/s2
Variance explained (VEcv) (11n(yiyi^)21n(yiy¯)2)100 (%)
Legates and McCabe’s (E1) (11n|yiyi^|1n|yiy¯|)100 (%)
Willmott et al.’s refined index of agreement (dr) E1, if E1 > = 0; (1n|yiy¯ |1n|yiyi^|1)100 (%), if E1 < 0
Pearson product-moment correlation coefficient (r) 1n(yiy¯)(yi^y^i¯)(1n(yiy¯)2(yi^y^i¯)2)1/2

* n: the number of observations in a validation dataset; yi: the observed value in the validation data; yi^: the predicted value; y¯: mean of the observed values; s: standard deviation of the observed values; and y^i¯: mean of the predicted value.

For the first and third scenarios, the range of slope was selected to be between 0.1 and 1.2. This choice was to ensure that the range of VEcv for the simulated scenarios covers a reasonable range of VEcv because the VEcv of predictive models was found to be ranging from -153% to 97% based on 296 applications [18] and also to ensure the results can be well illustrated because when the slope was below 0.1, VEcv was getting quadratically lower and would distort the illustration; moreover, practically the slope would usually be below 1.2. For the second and last scenarios, the range of slope was selected to be between 0 and 1.2; and setting the slope to be 0 was to simulate when the global mean was used as predictions [18]. All simulation work was implemented in R 3.2.3 [32].

Since this study is based on simulated data only that can be produced using the information provided in this section, no further data are used and available. All relevant R functions and R scripts used for the simulations and subsequent plotting in this study are stored as ‘Measures-of-predictive-errors-and-accuracy-for-PONE-Supporting-information-2.R’ at: https://github.com/jinli22/Not-r-nor-r2.

Results and discussion

3.1. Why r and r2 are incorrect measures of predictive accuracy

When r is used to assess the predictive accuracy based on y and x, the relationship between y and x is usually assumed to be linear with a slope significantly larger than 0 and an intercept of any reasonable value. It measures the residuals that are the difference between y and the fitted values that are derived from y and x [15,16]. Its calculation is based on the departures of y from the fitted values, which is essentially a measure of the goodness-of-fit between y and x. Therefore, r is not a measure of predictive accuracy. Neither is r2 because the r in r2 is the same as r. The key confusion is that the fitted values have been mistakenly used as x, which is illustrated below.

When r is applied to the simulated situations (Fig 1), its calculation is essentially determined by the error sum of squares (i.e., Σ(y– ŷb)2) as detailed in Crawley [33], where ŷb is the fitted values based on the equations as depicted in Fig 1a and 1b and explained below.

  1. In the first situation, when the predicted values were on the fitted line ŷa = x, x and y were equal. The difference between x and y and between y and fitted values were 0.

  2. In the second situation, when the predicted values were on the fitted line ŷb = βx or ŷb = β0 + β1x, x and y were matched well proportionally. For example, for an observed value x1, with a predicted value y1, the difference used for calculating r was |y1 − ŷb1| and was still 0, where ŷb1 was the corresponding fitted value of x1 on ŷb = βx or ŷb = β0 + β1x. However, the real difference between the observed and predicted values is |x1 –y1| that can be expressed as |ŷa1 –y1| given that x1 = ŷa1, where ŷa1 was the corresponding value of x1 on ŷa = x.

  3. In the third situation, when a predicted value was above the fitted line ŷb = βx or ŷb = β0 + β1x, the predicted value was higher than the fitted value ŷb. For example, for an observed value x2, with a predicted value y2, the difference used for calculating r was |ŷb2– y2 |, where ŷb2 was the corresponding fitted value of x2 on ŷb = βx or ŷb = β0 + β1x. However, the real difference is |x2 –y2| that can be expressed as |ŷa2 –y2| given that x2 = ŷa2, where ŷa2 was the corresponding value of x2 on ŷa = x.

  4. In the final situation, when a predicted value was below the fitted line ŷb = βx or ŷb = β0 + β1x, the predicted value was lower than the fitted value ŷb. For example, for an observed value x3, with a predicted value y3, the difference used for calculating r was |ŷb3 –y3|, where ŷb3 was the corresponding fitted value of x3 on ŷb = βx or ŷb = β0 + β1x. However, the real difference is |x3 –y3| that can be expressed as |ŷa3 –y3| given that x3 = ŷa3, where ŷa3 was the corresponding value of x3 on ŷa = x

It is clear that r can only be used to assess the predictive accuracy when y and x are equal and perfectly matched, where the fitted values are equal to y. In all other cases, i.e., when the intercept is not zero and/or the slope deviates from 1 or y and x are not well matched (Fig 1a and 1b), the fitted values are used to calculate r, and the calculation of r is not based on the difference between the predicted values and observed values. Hence r is not a correct measure of predictive accuracy. Neither is r2 given that r in r2is the same as r. Although several studies have pointed that r and r2 are biased, insufficient and misleading measures of predictive accuracy [410], no study has demonstrated that their calculations were not based on the difference between the predicted values and observed values. On the basis of above demonstration, it can be concluded that r and r2 are incorrect measures of predictive accuracy.

3.2. How are r and r2 misleading in assessing the accuracy of predictive models?

Despite the illustration above, it is still unclear how misleading r and r2 are when they are used to assess the predictive accuracy. This needs to be quantitatively evidenced.

For the first two scenarios (Panels A and B in S1 Fig), as expected, when y and x were equal or perfectly matched, r was 1 (Fig 2a and 2b). This indicated that r has correctly measured the matches when slope is 1. When the slope varied from 0.1 to 1.2 in both scenarios, it showed that r was constantly equal to 1 (Fig 2a and 2b), although it was expected to decline when the slope deviated from 1. Since the fitted values were used to calculate r as illustrated in Fig 1a and 1b, its value remained unchanged with slope in these scenarios (Fig 2a and 2b). Undoubtedly, r is misleading when the slope is not 1 in these two scenarios.

Fig 2. The changes of accuracy measures (VEcv, dr and E1) and r with slope for the four simulated scenarios: a) scenario 1; b) scenario 2; c) scenario 3; and d) scenario 4.

Fig 2

For each scenario, a slope of 1 (blue vertical line), 0.9 (green dashed vertical line), 0.6 (blue dashed vertical line) and 0.3 (red dashed vertical line), and VEcv = 0 (blue solid horizontal line) were highlighted.

In contrast, VEcv was 100% as expected when the slope was 1 (Fig 2a and 2b). It declined when slope deviated from 1, dropping to 95.79%, 32.69%, -106.14% and -240.76% when slope was 0.9, 0.6, 0.3 and 0.1 respectively for the first scenario (Fig 2a) and diminishing to 99%, 84%, 51%, 9.75% and 0% when slope was 0.9, 0.6, 0.3, 0.05 and 0 respectively for the second scenario (Fig 2b). VEcv also declined when the slope was higher than 1 (Fig 2a and 2b). Since VEcv used the correct difference between the predicted and observed values as depicted in Fig 1, it has accounted for the changes in slope, has reflected such changes, and thus has reliably assessed the predictive accuracy.

As the slope deviated from 1, VEcv declines quadratically but r remained unchanged, showing that the bias (i.e., the departure of r from its corresponding VEcv) resulted from using r was getting increasingly larger (Fig 2a and 2b). The bias resulted from r was highlighted for slope at 0.3, 0.6, 0.9 and 1; and obviously the bias became increasingly larger when the slope further deviated from 1 in comparison with VEcv. This finding illustrated how r has failed to correctly measure the predictive accuracy and how misleading it is, so r cannot be used to assess predictive accuracy. It is also apparent that the r weighted by slope [3] also incorrectly reflects the predictive accuracy, although it indeed corrects some bias. This is because in the weighted r, the r was supposed to be linearly biased with slope, but the bias became quadratically higher when the slope deviated further from 1 (Fig 2a and 2b). Since r was constantly equal to 1, r2 would also be 1 and would display exactly the same pattern as r, thus r2 is misleading as well.

The last two scenarios (Panels C and D in S1 Fig) showed that r increased from 0.5252, 0.8083, 0.9288, 0.9643 to 0.9704 along slope ranging from 0.1, 0.3, 0.6, 0.9 to 1 for the third scenario (Fig 2c), and from 0.2328, 0.8083, 0.9288, 0.9643 to 0.9704 along slope ranging from 0, 0.3, 0.6, 0.9 to 1 for the fourth scenario (Fig 2d). Although r values declined as the slope became less than 1, its values were incorrect as they were based on the incorrect differences as illustrated in Fig 1. The change of r values with slopes in Fig 2c and 2d has revealed that it can even disguise its misleading behaviour because it indeed declined when the slope became less than 1. When the slope became larger than 1, the accuracy was expected to decline, but the r values, in fact, continued to increase from 0.9704 to 0.9788 for slope increasing from 1 to 1.2 for both scenarios (Fig 2c and 2d). This increase with the slope revealed the misleading behaviour of r when it is used to assess the predictive accuracy.

In contrast, for scenario 3, due to the noise in the predicted values, VEcv reached 92.51% when the slope was 1, declined when slope deviated from 1, dropped to 88.55%, 26.20%, -111.88% and -246.00% when slope was 0.9, 0.6, 0.3 and 0.1, and declined to 75.19% when slope was 1.2 (Fig 2c). For scenario 4, due to the noise in the predicted values, VEcv reached the maximum of 92.90% when slope was 0.95, decreased to 92.78%, 81.58%, 52.38%, 14.30% and 5.18% for slope at 0.9, 0.6, 0.3, 0.05 and 0 respectively, and declined to 85.98% for slope at 1.2 (Fig 2d). As discussed above, VEcv has correctly accounted for the changes in slope and thus has reliably assessed the predictive accuracy.

The changes in r values with slope in Fig 2c and 2d revealed that it also showed a similar trend as, and displays a correlation with, VEcv. This phenomenon can be found in previous studies [7]. This correlation could be because r is a component of MSE [7,17], hence a component of VEcv because VEcv can be expressed using MSE [18]. Such correlation may have contributed to the confusion about the suitability of r to assess predictive accuracy.

The bias resulted from using r was further depicted for slope at 0.3, 0.6, 0.9 and 1 in comparison with VEcv in Fig 2c and 2d. The bias became quadratically higher when the slope deviated from 1 instead of linearly, which is similar to what have been observed for the first two scenarios (Fig 2a and 2b). This finding demonstrated that the r weighted by slope [3] is also an incorrect measure of the predictive accuracy for the last two scenarios because the bias is non-linearly related to the slope.

For r2, it would display similar patterns as those displayed by r in Fig 2c and 2d.

The relationships and mismatches between r and VEcv presented in Fig 2 were further depicted and highlighted in Fig 3. For r2, it also showed similar relationships with VEcv as r (Fig 3). The mismatches between r and MSE related measures were apparently present in previous studies (e.g., [7,34]), but no further action has been taken to investigate such phenomenon. Since MSE is linearly related to VEcv [18], VEcv would also be expected to have similar mismatches as in these previous studies, which are consistent with the findings of the current study. These mismatches suggest that the usual practice of comparing r and r2 values is also wrong because r and r2 with the same values can refer to different accuracy in terms of VEcv as shown in Fig 3.

Fig 3. The relationships between r (or r2) and VEcv for the four simulated scenarios in Fig 1 and S1 Fig.

Fig 3

Although these findings are based only on four simulated scenarios, they provide convincing evidence to support that r, the weighted r as well as r2 are incorrect measures of predictive accuracy.

3.3. Comparison of accuracy measures

The patterns of VEcv, E1 and dr under four scenarios were displayed in Fig 2. It showed that VEcv, E1 and dr all were 100% when the slope was 1; then they decreased when slope deviated from 1; VEcv declined quadratically while E1 and dr decreased linearly, but they all reached 0% at the same slope for the first two scenarios (Fig 2a and 2b). When their values were > 0%, both E1 and dr were identical. When their values were < 0%, E1 still decreased linearly with slope while dr separated from E1 and decreased non-linearly with a slower pace than E1, and VEcv continued to decline quadratically with a faster pace than E1 (Fig 2a and 2b). The patterns displayed by VEcv, E1 and dr in relation to slope for scenarios 3 and 4 were largely similar to those for the first two scenarios, although they all did not reached 100% due to noise in the data, with E1 and dr decreased more than VEcv (Fig 2c and 2d). These findings support that 1) dr is a linear rescaling of E1 when they are positive and 2) it is merely cosmetic and unnecessary to remap the negative values of E1 to dr because a model with a negative E1 is flawed and of inefficacy and it is immaterial how it is scaled [31]. Moreover, the findings also suggest that the arguments and conclusion about dr and E1 by Willmott et al. [30] are problematic because E1 and dr were not identical in their study when they were non-negative. Thus only two accuracy measures, VEcv and E1, remain for further investigation.

It is clear that VEcv and E1 displayed monotonic changes relative to each other (Fig 2). The differences between VEcv and E1 in relation to slope were resulted from that VEcv was based on the square of the differences between the predictions for and the observations of validation samples while E1 was based on the absolute values of the differences. It demonstrates that both measures produced the same accuracy order for all predictive models under these four simulated scenarios. This finding suggests that VEcv and E1 are essentially the same in terms of relative predictive accuracy for the simulated scenarios, so the preference of E1 over measures based on the square differences by Legates and McCabe [8] is not supported under these simulated scenarios. This finding demonstrated that 1) the concern on the measure based on the square differences (i.e., VEcv) because it varies with the variability of the error magnitudes [8,30] is baseless; 2) both VEcv and E1 are equally interpretable. The key differences between them are that 1) VEcv explains the percentage of the variance of validation samples, while E1 explains the percentage of the sum of the absolute differences; and 2) VEcv is quadratically related to the differences between the predictions for and the observations of validation samples, while E1 is linearly related to the differences.

The relationship of VEcv and E1 showed that they largely maintained the monotonic changes relative to each other, although some non-monotonic changes were displayed when different data noises were considered (Fig 4). It was concluded that E1 is preferred also because the measure based on the square differences varies with E1 but not monotonically [8,30]. This phenomenon is expected because for two datasets with the same E1 are not expected to be the same in terms of their data variation. On the other hand, it could also be stated as that ‘E1 varies with VEcv but not monotonically’. However, using either of them as a control to test the other requires solid justification that is lacking. The above findings actually suggest that VEcv and E1 should be used as complementary measures when one of them produces the same or similar accuracy values for predictive models, the other may be able to tell the difference between the models.

Fig 4. The relationships between VEcv and E1 for the fourth simulated scenario in S1 Fig and two additional extensions: 1) ε = rnorm (30, sd = 2), 2) ε = rnorm (300, sd = 2) and 3) ε = rnorm (300, sd = 3), with only the positive values presented.

Fig 4

It is also apparent that the relationship of VEcv and E1 was maintained when the sample size increased from 30 to 300 for the same data variation and the standard deviation increased from 2 to 3 for the same sample size (Fig 4). This suggests that the relationship of VEcv and E1 is expected to be independent of sample size and data variation (i.e., error magnitude). These findings suggest that measures using the squared values do not respond differently to changes in sample size and data variation as measures using absolute values, which do not support the speculations on these issues by previous studies [8,22,23,30].

3.4. What should be used to assess the predictive accuracy?

Many measures for assessing the predictive accuracy have been reviewed or even recommended for numerical data [1,2]. Of these measures, besides r and r2, MAE and root MSE (RMSE) are among the most commonly used or recommended measures [1,2,6]. Therefore, the commonly used measures, MAE and RMSE, are considered in this study.

For MAE and RMSE, their advantages and disadvantages were discussed previously [22,23,35,36]. RMSE were criticised to suffer the following issues [22]: 1) it varies with the variability of the error magnitudes, 2) it varies with MAE but not monotonically, 3) its values are in between MAE and MAE* n0.5 (i.e., the square root of sample size n) and vary with (n0.5), and 4) it does not satisfy the triangle inequality of a metric. Of these issues, the first two issues are similar to what have been clarified above regarding the differences between VEcv and E1. As to the third one, it was clearly demonstrated that RMSE and MAE are highly linearly correlated according to the findings for relative MAE (RMAE) and relative RMSE (RRMSE) and has nothing to do with sample size n [18]. And for the fourth ‘issue’, it was proved to be not the case by Chai and Draxler [35]. Therefore, all these issues are largely invalid speculations. Furthermore, because the relationships between VEcv and E1 observed above and the relationships between RMSE and MAE [18], relevant arguments and speculations on the advantages and disadvantages of relevant measures using the squared or absolute differences need to be reassessed. Since all MAE and MSE related measures including RMSE as well as VEcv and E1 use the correct information to produce the predictive error or accuracy [18], they will be discussed below.

Of these MAE and MSE related measures, MAE and RMSE are the two most commonly used measures for assessing the predictive accuracy in the environmental sciences [6]. They are, however, unit/scale dependent (Table 2). Hence their application is limited to assessing predictive models that are applied to the same dataset. Moreover, they cannot tell how accurate the models are. The results based on these two measures for different datasets are not compatible, even for the same methods. This is because different datasets are usually different in unit/scale. According to Li [18], MSE, like RMSE, also shares these limitations.

Table 2. The relation of error/accuracy measures and data properties.

Error/accuracy Measure Unit/scale independent Variance-independent Predictive accuracy Relationship with VEcv*
MAE No No Unknown (1VEcv/100)(n1)2.0572ns
RMSE No No Unknown (1VEcv/100)(n1)/ns
MSE No No Unknown ((1VEcv/100)(n1)/n)s2
RMAE Yes No Unknown (1VEcv/100)(n1)2.0572nCV
RRMSE Yes No Unknown (1VEcv/100)(n1)/nCV
SRMSE Yes Yes Unknown (1VEcv/100)(n1)/n
MSRE Yes Yes Unknown (1VEcv/100)(n1)/n
VEcv Yes Yes Known

* These equations were derived from Li [18], where n is the number of observations in, s is standard deviation of, and CV is coefficient of variation of, a validation dataset

RMAE and RRMSE are independent of unit/scale and not sensitive to data means according their definitions (Table 1). They enable us to compare results derived from different datasets that may have different unit/scale and different data means. However, they are linearly correlated with data variance [6,37]. Therefore, their application is limited to assessing predictive models that are applied to datasets with the same data variance which is hardly true in the reality. Furthermore, they are error measures and not accuracy measures, so they can only tell which model produce less error but they are unable to tell how accurate the models are. This may explain why there are so many published studies recommending models with negative VEcv to generate their predictions [18].

According to Li [18], standardised RMSE (SRMSE) and mean square reduced error (MSRE) don’t share the limitations associated with RMSE, but they are only error measures and still cannot tell the predictive accuracy as discussed above.

VEcv is an accuracy measure that is unit/scale, data mean and variance independent according to its definition [18]; and it unifies the error measures above via various equations in Table 2. It is an accuracy measure of predictive models and thus their predictions, and it provides a universal tool to assess and directly compare the accuracy of predictive models for any numerical data of various unit/scale, mean and variation from any disciplines. Moreover, these equations enable us to derive corresponding VEcv from relevant error measures and directly compare and assess the accuracy of predictive models for variables from different disciplines if relevant information is available as discussed previously [18].

Since both VEcv and E1 are reliable measures of the accuracy of predictive models, they could be used as complementary measures to each other as discussed in section 3.3. Hence they are recommended for future studies, although the relationships of E1 with the existing MSE and MAE related error measures are not as well defined as VEcv, which may be worth further investigation in future. With the applications of these accuracy measures, it would prevent flawed predictive models (i.e., models with negative VEcv and E1) be recommended to generate predictions. Consequently, predictive models with improved accuracy are expected to be developed to generate predictions for evidence-informed decision-making.

In addition, as demonstrated in previous studies, the randomness associated with cross-validation affects the accuracy measures [3840], VEcv is thus also affected by such randomness [41]. So is E1 given that it uses the same information as VEcv. Therefore, we recommend that the cross-validation, with an exception of leave-one-out method, needs to be repeated a certain number of times (e.g., 100 times) to stabilise the VEcv and E1 in future studies. Furthermore, despite the assumption that VEcv and E1 were derived from validation results [8,18], they can be equally applicable to assessing predictive models based on new samples besides validation samples.

Conclusions

This study has clarified relevant issues associated with predictive accuracy and predicted values. The calculation of r and r2 is not based on the difference between the observed and predicted values. They can only be used to assess the accuracy when predicted and observed values are perfectly matched; otherwise they do not measure the accuracy and are incorrect and quadratically biased. The weighted r is also incorrect measure of predictive accuracy. The usual practice of comparing r (and r2) values is problematic because r with the same values can refer to different predictive accuracy. The existing MSE and MAE related error measures suffer various limitations in their applications and are unable to tell the predictive accuracy. VEcv, an accuracy measure, unifies these error measures and is unit/scale, data mean and variance independent. It provides a universal tool to assess and directly compare the accuracy of predictive models for any numerical data of various unit/scale, mean and variation from any disciplines and is recommended for assessing the accuracy of predictive models in the future. Furthermore, E1 can be equally applicable to assessing the accuracy of predictive models as VEcv.

Supporting information

S1 Fig. Scenarios simulated for the relationship of the observed values (x) and predicted values (y) assumed to be linear with a slope of 1 (black line), 0.9 (green dashed line), 0.6 (blue dashed line) and 0.3 (red dashed line).

a) x and y are perfectly linearly related, with an intercept of 0; b) x and y are perfectly linearly related, with intercepts changing with their associated slopes; c) x and y are linearly related, with certain noise (ε) in the predictions and with an intercept of 0; d) x and y are linearly related, with certain noise (ε) in the predictions and with intercepts changing with their associated slopes. The noise was randomly generated (i.e., ε = rnorm (30, sd = 2)).

(DOCX)

Acknowledgments

I would like to thank Liuqi Wang, Peter Tan and Tanya Whiteway for their valuable comments and suggestions. This study was supported by Geoscience Australia. This paper is published with the permission of the Chief Executive Officer, Geoscience Australia.

Data Availability

All relevant R functions and R scripts used for the simulations and subsequent plotting in this study are stored as ‘Measures-of-predictive-errors-and-accuracy-for-PONE-Supporting-information-2.R’ at: https://github.com/jinli22/Not-r-nor-r2.

Funding Statement

This study was supported by Geoscience Australia. The funder had no role in study design, data collection and analysis, decision to publish, or preparation of the manuscript.

References

  • 1.Liu C, White M, Newell G (2011) Measuring and comparing the accuracy of species distribution models with presence-absence data. Ecography 34: 232–243. [Google Scholar]
  • 2.Bennett ND, Croke BFW, Guariso G, Guillaume JHA, Hamilton SH, Jakeman AJ, et al. (2013) Characterising performance of environmental models. Environmental Modelling & Software 40: 1–20. [Google Scholar]
  • 3.Krause P, Boyle DP, Bäse F (2005) Comparison of different efficiency criteria for hydrological model assessment. Advances in Geosciences 5: 89–97. [Google Scholar]
  • 4.Willmott CJ (1981) On the validation of models. Physical Geography 2: 184–194. [Google Scholar]
  • 5.McCuen RH, Snyder WM (1975) A proposed index for comparing hydrographs. Water Resources Management 11: 1021–1024. [Google Scholar]
  • 6.Li J, Heap A (2008) A Review of Spatial Interpolation Methods for Environmental Scientists. Geoscience Australia, Record 2008/23, 137pp. Record 2008/23 Record 2008/23. [Google Scholar]
  • 7.Murphy AH, Epstein E (1989) Skill scores and correlation coefficients in model verification. Monthly Weather Review 117: 572–581. [Google Scholar]
  • 8.Legates DR, McCabe GJ (1999) Evaluating the use of "goodness-of-fit" measures in hydrologic and hydroclimatic model validation. Water Resources Research 35: 233–241. [Google Scholar]
  • 9.Legates DR, Davis RE (1997) The continuing search for an anthropogenic climate change signal: Limitations of correlation-based approaches. Geophysical Research Letters 24: 2319–2322. [Google Scholar]
  • 10.Kessler E, Neas B (1994) On correlation, with applications to the radar and raingage measurement of rainfall. Atmospheric Research 34: 217–229. [Google Scholar]
  • 11.Kuhn M, Johnson K (2013) Applied Predictive Modeling. New York: Springer. [Google Scholar]
  • 12.Schemper M (2003) Predictive accuracy and explained variation. Statistics in Medicine 22: 2299–2308. doi: 10.1002/sim.1486 [DOI] [PubMed] [Google Scholar]
  • 13.Weglarczyk S (1998) The interdependence and applicability of some statistical quality measures for hydrological models. Journal of Hydrology 206: 98–103. [Google Scholar]
  • 14.Vicente-Serrano SM, Saz-Sánchez MA, Cuadrat JM (2003) Comparative analysis of interpolation methods in the middle Ebro Valley (Spain): application to annual precipitation and temperature. Climate Research 24: 161–180. [Google Scholar]
  • 15.Crawley MJ (2003) Statistical Computing: An Introduction to Data Analysis using S-Plus. Chichester: John Wiley & Sons; 761 p. [Google Scholar]
  • 16.Draper NR, Smith H (1981) Applied Regression Analysis. New York: John Wiley & Sons; 709 p. [Google Scholar]
  • 17.Gupta HV, Kling H, Yilmaz KK, Martinez GF (2009) Decomposition of the mean squared error and NSE performance criteria: Implications for improving hydrological modelling. Journal of Hydrology 377: 80–91. [Google Scholar]
  • 18.Li J (2016) Assessing spatial predictive models in the environmental sciences: accuracy measures, data variation and variance explained. Environmental Modelling & Software 80: 1–8. [Google Scholar]
  • 19.Singh V, Carnevale C, Finzi G, Pisoni E, Volta M (2011) A cokriging based approach to reconstruct air pollution maps, processing measurement station concentrations and deterministic model simulations. Environmental Modelling & Software 26: 778–786. [Google Scholar]
  • 20.Karl JW (2010) Spatial predictions of cover attributes of rangeland ecosystems using regression kriging and remote sensing. Rangeland Ecology & Management 63: 335–349. [Google Scholar]
  • 21.He Y, Wang J, Lek-Ang S, Lek S (2010) Predicting assemblages and species richness of endemic fish in the upper Yangtze River. Science of the Total Environment 408: 4211–4220. doi: 10.1016/j.scitotenv.2010.04.052 [DOI] [PubMed] [Google Scholar]
  • 22.Willmott CJ, Matsuura K (2005) Advantages of the mean absolute error (MAE) over the root mean square error (RMSE) in assessing average model performance. Climate research 30: 79–82. [Google Scholar]
  • 23.Willmott CJ, Matsuura K, Robeson SM (2009) Ambiguities inherent in sums-of-squares-based error statistics. Atmospheric Environment 43: 749–752. [Google Scholar]
  • 24.Nash JE, Sutcliffe JV (1970) River flow forecasting through conceptual models part I—A discussion of principles. Journal of Hydrology 10: 282–290. [Google Scholar]
  • 25.Schloeder CA, Zimmerman NE, Jacobs MJ (2001) Comparison of methods for interpolating soil properties using limited data. Soil Science Society of American Journal 65: 470–479. [Google Scholar]
  • 26.Greenwood DJ, Neeteson JJ, Draycott A (1985) Response of potatoes to N fertilizer: dynamic model. Plant Soil 85: 185–203. [Google Scholar]
  • 27.Hastie T, Tibshirani R, Friedman J (2001) The Elements of Statistical Learning: Data Mining, Inference and Prediction. New York: Springer-Verlag; 533 p. [Google Scholar]
  • 28.Kohavi R. A study of cross-validation and bootstrap for accuracy estimation and model selection; 1995. pp. 1137–1143. [Google Scholar]
  • 29.Willmott CJ, Robeson SM, Matsuura K (2012) A refined index of model performance. International Journal of Climatology 32: 2088–2094. [Google Scholar]
  • 30.Willmott CJ, Robeson SM, Matsuura K, Ficklin DL (2015) Assessment of three dimensionless measures of model performance. Environmental Modelling & Software 73: 167–174. [Google Scholar]
  • 31.Legates DR, McCabe GJ (2013) A refined index of model performance: a rejoinder. International Journal of Climatology 33: 1053–1056. [Google Scholar]
  • 32.R Development Core Team (2015) R: A Language and Environment for Statistical Computing. Vienna: R Foundation for Statistical Computing. [Google Scholar]
  • 33.Crawley MJ (2007) The R Book. Chichester: John Wiley & Sons, Ltd; 942 p. [Google Scholar]
  • 34.Kvalseth TO (1985) Cautionary note about R2. The American Statistician 39: 279–285. [Google Scholar]
  • 35.Chai T, Draxler RR (2014) Root mean square error (RMSE) or mean absolute error (MAE)?–Arguments against avoiding RMSE in the literature. Geoscientific Model Development 7: 1247–1250. [Google Scholar]
  • 36.Willmott CJ, Matsuura K (2006) On the use of dimensioned measures of error to evaluate the performance of spatial interpolators. International Journal of Geographical Information Science 20: 89–102. [Google Scholar]
  • 37.Li J, Heap A (2011) A review of comparative studies of spatial interpolation methods in environmental sciences: performance and impact factors. Ecological Informatics 6: 228–241. [Google Scholar]
  • 38.Li J (2013) Predictive Modelling Using Random Forest and Its Hybrid Methods with Geostatistical Techniques in Marine Environmental Geosciences. In: Christen P, Kennedy P, Liu L, Ong K-L, Stranieri A, Zhao Y, editors. The proceedings of the Eleventh Australasian Data Mining Conference (AusDM 2013), Canberra, Australia, 13–15 November 2013: Conferences in Research and Practice in Information Technology, Vol. 146.
  • 39.Li J (2013) Predicting the spatial distribution of seabed gravel content using random forest, spatial interpolation methods and their hybrid methods. The International Congress on Modelling and Simulation (MODSIM) 2013. Adelaide. pp. 394–400.
  • 40.Li J, Siwabessy J, Tran M, Huang Z, Heap A (2013) Predicting Seabed Hardness Using Random Forest in R In: Zhao Y, Cen Y, editors. Data Mining Applications with R: Elsevier; pp. 299–329. [Google Scholar]
  • 41.Li J, Alvarez B, Siwabessy J, Tran M, Huang Z, Przeslawski R, et al. (2017) Application of random forest and generalised linear model and their hybrid methods with geostatistical techniques to count data: Predicting sponge species richness. Environmental Modelling & Software 97: 112–129. [Google Scholar]

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Supplementary Materials

S1 Fig. Scenarios simulated for the relationship of the observed values (x) and predicted values (y) assumed to be linear with a slope of 1 (black line), 0.9 (green dashed line), 0.6 (blue dashed line) and 0.3 (red dashed line).

a) x and y are perfectly linearly related, with an intercept of 0; b) x and y are perfectly linearly related, with intercepts changing with their associated slopes; c) x and y are linearly related, with certain noise (ε) in the predictions and with an intercept of 0; d) x and y are linearly related, with certain noise (ε) in the predictions and with intercepts changing with their associated slopes. The noise was randomly generated (i.e., ε = rnorm (30, sd = 2)).

(DOCX)

Data Availability Statement

All relevant R functions and R scripts used for the simulations and subsequent plotting in this study are stored as ‘Measures-of-predictive-errors-and-accuracy-for-PONE-Supporting-information-2.R’ at: https://github.com/jinli22/Not-r-nor-r2.


Articles from PLoS ONE are provided here courtesy of PLOS

RESOURCES