Skip to main content
. 2005 Jun 4;330(7503):1320–1322. doi: 10.1136/bmj.330.7503.1320

Table 1.

The assessment team

• The team must be self sufficient in food, water, shelter, medical supplies, transport, and communications
• A practical team size is often two to six people, splitting into teams of two once in the country
• While one assessor does the talking, a companion listens, observes, and takes notes. In this way little is missed or misinterpreted