Table 1.
Parameter measured | Air | EtOH |
---|---|---|
Dam latency to displaced pups P2 | 9.00(2.78) | 7.80(1.87) |
Dam latency to displaced pups P5 | 8.16(1.33) | 7.83(1.47) |
Dam latency to retrieve displaced pups P2 | 43.5(18.41) | 41.17(14.21) |
Dam latency to retrieve displaced pups P5 | 23.17(7.02) | 30.50(8.94) |
Dam latency to rebuild nest P2 | 119.7(23.28) | 154.2(13.06) |
Dam latency to rebuild nest P5 | 156.3(27.71) | 116.7(17.90) |