Abstract
Figures of merit for future tokamak fusion power plants (FPPs) are presented. It is argued that extrapolation from present-day experiments to proposed FPPs must follow a consistent development path, demonstrating the largest required leaps in intermediate devices to allow safe extrapolation to an FPP. This concerns both plasma physics and technology. At constant plasma parameters, the figures of merit depend on both major radius R and magnetic field B. We propose to use the term ‘size’ for a combination of R and B to avoid ambiguities in scaling arguments. Two routes to FPPs are discussed: the more conventional one increasing R, based on the assumption that B is limited by present technology; and an alternative approach assuming the availability of new technology for superconducting coils, allowing higher B. It is shown that the latter will lead to more compact devices, and, assuming a criterion based on divertor impurity concentration, is in addition more favourable concerning the exhaust problem. However, in order to obtain attractive steady-state tokamak FPPs, the required plasma parameters still require considerable progress with respect to present experiments. A credible strategy to arrive at these must hence be shown for both paths. In addition, the high-field path needs a demonstration of the critical technology items early on.
This article is part of a discussion meeting issue ‘Fusion energy using tokamaks: can development be accelerated?’.
Keywords: tokamak, fusion power plant, exhaust, confinement, stability limits
1. Introduction
The development of nuclear fusion as an energy source using magnetic confinement in toroidal geometry has progressed along a path on which devices progressively became larger in terms of the torus' major radius R and also made use of increased strength of the confining magnetic field B in order to reach conditions close to ‘ignition’, i.e. where the energy loss from the plasma by conduction and convection is compensated by the heating of the plasma through the α-particles generated in the fusion reaction1 [1]. The ignition criterion can be expressed by the so-called triple product nTτE, where n is the plasma density, T the ion temperature and τE the energy confinement time, i.e. ratio of plasma stored energy to the loss power; τE has been found to strongly increase with both R and B. Today, the largest tokamak JET (R = 3 m, B = 4 T) can achieve conditions close to breakeven (where the fusion power generated is as large as the power deposited in the plasma to sustain it), and the next-step device ITER (R = 6.2 m, B = 5.2 T), presently under construction, aims at increasing this ratio to 10. However, an economically attractive fusion power plant (FPP) will require even larger values and has to fulfil several other conditions, such as long pulses or steady-state operation (effectively allowing continuous electricity production).
In order to determine the parameters of a future tokamak FPP, an extrapolation is hence used, based on a combination of experimental results and theoretical understanding. Assuming a certain plasma performance in terms of energy confinement, stability and exhaust, one can determine the required machine parameters such as R, B and the required auxiliary heating power PAUX or the current drive (CD) power PCD to drive the plasma current. These have to be consistent with the assumptions about technology, e.g. the value of B is usually limited by the critical current in the superconductor or by the forces on the inner leg of the toroidal field coils.
A ‘roadmap’ to a tokamak FPP usually involves several steps that develop the necessary physics and technology to arrive at an attractive FPP. For example, the EU Roadmap [2] builds on a demonstration of dominant self-heating of the plasma by α-particles in ITER, followed by the demonstration of a closed fuel cycle in DEMO. A credible strategy must be presented for ‘safe’ extrapolation within a roadmap to minimize the risk of failure in a step. In the EU Roadmap, the present assumption is that the physics necessary for the plasma scenario will essentially be demonstrated in ITER, and DEMO is no longer considered an experimental device. Likewise, the present EU DEMO design builds on ITER technology where possible.
In this paper, we will examine different extrapolation paths to a tokamak FPP, and argue that the term ‘size’ should comprise both geometrical size R as well as magnetic field strength B. In the next section, we propose four figures of merit that have to be optimized to arrive at an efficient FPP. These will be formulated using a simple zero-dimensional (0D) model that captures the dependence on the essential plasma physics parameters as well as on the machine parameters R and B. In the following section, we discuss a route to an FPP based on increasing R, assuming that the value of B is limited by present-day technology. Then, a route that increases B, assuming progress with superconductor technology, is discussed. In the final section, conclusions are drawn for both development lines.
2. Figures of merit for tokamak fusion power plants
In this section, we define figures of merit for tokamak FPPs and show how to derive them from a simple 0D model that involves the basic plasma parameters as well as the size parameters R and B. The choice of plasma parameters is similar to the model presented in [3] and [4], and for the derivation of the equations, we refer the reader to the detailed descriptions given there. We use the following 0D plasma parameters:
-
—
Normalized pressure βN = β/(AIp/(RB)), where β = 〈p〉/(B2/(2μ0)) is the ratio of average kinetic pressure to magnetic field pressure, A is the torus' aspect ratio, i.e. the ratio of major to minor radius, and Ip is the plasma current. The quantity βN is limited by ideal magnetohydrodynamic (MHD) stability. Since, under optimum conditions, the fusion power Pfus increases quadratically with β, this so-called β-limit effectively limits the fusion power achievable for given B.
-
—
Confinement relative to the ITER confinement scaling: it is envisaged that ITER will operate under ‘H-mode’ plasma conditions, where a transport barrier at the plasma edge increases τE with respect to (w.r.t.) so-called L-mode conditions [1]. The confinement quality is hence measured by H = τE/τE,ITER98 where τITER98 is the energy confinement time predicted by the empirical ITER H-mode scaling [5]. Assuming H > 1 hence means that one assumes that confinement is better than the value predicted by the ITER scaling law.
-
—
Electron density relative to the empirical ‘Greenwald’ density limit fGW = nave/nGW with nGW = Ip/(πA2/R2) [6]. Here, nave is the line-averaged electron density in units of 1020 m−3. Since fusion power scales quadratically with n, the density limit also limits the fusion power achievable for given plasma current Ip.
-
—
Safety factor q = Sqcyl where qcyl = 5 μ0 (R/A2)(B/Ip) is the cylindrical safety factor and S is the so-called shape factor that takes into account the effect of toroidicity and shaping of the plasma cross section. In the present study, S has been held constant and hence the shape dependence of other quantities has been neglected. The safety factor is limited by the ideal MHD kink limit, effectively limiting the maximum achievable plasma current, which in turn limits the density by the Greenwald limit. Also, τE increases roughly linearly with Ip so that limiting Ip will also limit τE.
-
—
Power flux across the separatrix relative to the H–L threshold fLH = Psep/PHL, where Psep is the power crossing the separatrix in charged particles, i.e. radiation is not included. A minimum power Psep is needed to transit to H-mode confinement conditions, and for this threshold value PLH, the empirical scaling [7] is used. Once H-mode conditions are established, the back transition to L-mode conditions occurs when Psep falls below a threshold value PHL. In our study, we assume PHL = PLH, neglecting a possible favourable hysteresis PHL < PLH. This assumes implicitly that radiation losses are controlled, e.g. by addition of suitable impurities, such that the desired fLH is reached. For an extension using the simple model presented here, taking into account the effect of impurity seeding on confinement, see [8].
The figures of merit used in our analysis are the following:
-
—Fusion power Pfus: this quantity is roughly equal to the thermal power generated by the plant. The self-heating of the plasma through fusion-produced α-particles is just Pfus/5:
2.1 -
—Ratio of fusion power to auxiliary power needed to sustain the plasma from power balance, QPB:
2.2 -
—
Note the ‘resonance denominator’, as the α-heating fully sustains the plasma (ignited plasma). Here QPB should be minimized to minimize the recirculating electrical power in the plant which, according to [8], is inversely proportional to QPB in the limit that PAUX dominates the auxiliary electrical power needed to run the plant.
-
—Ratio of fusion power to CD power needed to sustain the plasma current, QCD. Like QPB, this quantity should be minimized to minimize recirculating power. In this paper, we assume that the tokamak operates in steady state, and we use a generic scaling of the CD efficiency with T/n, where T is the plasma temperature. This leads to
2.3 -
—
Note that also this quantity exhibits a ‘resonance denominator’ when the so-called bootstrap current fraction IBSIP ∼ A1/2qβN attains 100%. The bootstrap current is a self-generated thermo-electrical toroidal current with its magnitude proportional to the radial gradient of the pressure gradient. For a fully consistent solution, QCD = QPB, but as the two quantities assume large values, their difference will not influence the power balance strongly and hence this condition is not always enforced in this paper. As outlined in [3], equations (2.1), (2.2) and (2.3) assume that the temperature range is close to that of the optimum reactivity, i.e. around 10–20 keV average temperature, which must be verified afterwards on inserting the assumed density n = fGWnGW.
-
—Concentration of impurities in the divertor, fZ,div: the power flowing across the separatrix is guided by the magnetic field to the first wall in a very narrow region, potentially leading to high local heat loads. Here, we assume that the power across the separatrix is so large that impurities have to be introduced into the region outside the separatrix to lead to additional dissipation. We use a criterion derived by Reinke [9]
2.4 -
—
This criterion takes into account recent results that indicate that the width of the power-conducting layer outside the separatrix scales with the poloidal gyro-radius [10]. In our parameter studies, we will assume that fZ,div takes on the value foreseen for the ITER Q = 10 scenario, meaning that the exhaust scenario would be demonstrated in ITER.
Equations (2.1)–(2.4) allow one to calculate the figures of merit for particular choices of the plasma parameters as well as R and B. Since we are interested in scaling with these parameters, we will plot, for particular choices of the plasma parameters, lines of constant figures of merit in R–B space to understand the interdependences.
As an example, we show in figure 1 the figures of merit for the ITER Q = 10 scenario (A = 3.1, q = 3.1, H = 1, βN = 1.8, fGW = 0.85, fLH = 1.33), where the figures of merit have been set to the ITER values Pfus = 400 MW, QPB = 10 and fZ = fZ,ITER (the particular value has not been calculated explicitly and will only be used in a relative way).
It can be seen that the lines for the three figures of merit cross in the ITER point, which fulfils all three criteria. Also plotted in figure 1 is the condition QPB = 10, which is not fulfilled by far. This is not surprising because the ITER Q = 10 scenario is aimed at pulsed operation, but it also shows that, with this optimization strategy, it will not be easy to obtain steady state.
It can also be seen in figure 1 that the lines for QPB and Pfus are almost on top of each other in the whole parameter range. This is due to the very similar scaling of the two figures of merit, which means as one is fixed, the other one will not vary significantly along this path in the R–B plane. This has been interpreted as ‘Pfus and QPB not depending on size’ [11,12], but, as can be seen from, for example, fig. 2 in [11], B varies throughout the whole scan and the same Pfus and QPB at smaller size imply a higher B. For the purpose of the present study, we propose the ‘size’ of a tokamak should be measured by a combination of R and B, for example, BR3/4 if QPB and Pfus are the figures of merit considered. We note, however, that there is no unique combination of the two parameters to describe all four figures of merit described above, and for QPB, it will depend on the exponents of the (empirical) confinement scaling law used. For the remainder of the paper, we will hence examine the figures of merit in R–B space, similar to figure 1. Note that for a fixed set of the figures of merit (Pfus, QPB, QCD, fZ), the acceptable area in R–B space is above the lines for the first three parameters (they should be maximized) and below the line of constant fZ. This will define an acceptable area in R–B space which, in some cases, may not exist (such as in figure 1 if QCD ≥ 10 was taken as a requirement).
We will now examine two different strategies to increase the ‘size’ towards an FPP, namely increasing R at roughly constant B (assuming a technology limit on B) and increasing B while at the same time decreasing R (assuming that new magnet technology exists).
3. The road to a tokamak fusion power plant: increasing geometric size
In this section, we discuss the ‘conventional’ approach of scaling up tokamaks in order to reach parameters necessary for economic production of power. As an example, we look at the recently developed ‘stepladder’ strategy that is based on the assumption of steady-state tokamak operation in a ‘hybrid H-mode’ regime, i.e. higher q and βN than in ITER baseline operation, which according to (2.3) will increase QCD. At the same time, the higher q means a reduction in QPB, which is compensated by choosing a regime in which it is expected that τE exceeds that of ITER baseline operation, i.e. H = 1.2. The ITER research plan actually foresees a phase in which, after demonstrating its Q = 10 goal, such a steady-state scenario will be developed and the parameters chosen in the stepladder approach are compatible with this plan. In the ‘stepladder’ approach, an FPP design point is chosen that sits at the upper limit of B, assuming conventional superconducting magnet technology (B = 6.1 T on the plasma axis) and just fulfils the requirement of acceptable recirculating power (QPB = 30, corresponding to less than 20% of recirculating power). DEMO is then scaled down in order to fulfil the EU stakeholder requirement of 500 MW net electrical power. We note here that, as discussed in detail in [4], the simple equations (2.1)–(2.3) slightly underpredict the size of the machines because the temperature is already exceeding the optimum value. Hence, 1.5-dimensional (1.5D) transport modelling has been employed in [4] to confirm the basic findings of the 0D model. The R–B diagrams for DEMO and FPP in this strategy are shown in figure 2.
Both design points fulfil the imposed requirements on QCD and Pfus, while actually QPB exceeds substantially QCD, indicating that the power requirements are indeed no longer set by the power balance but rather by the steady-state constraint. Concerning exhaust, it can be seen that both points lie below the ITER yellow similarity line, but this was achieved by reducing the margin w.r.t. the LH threshold power, i.e. fLH was reduced from 1.33 to 1.2 (DEMO) and further down to 1.0 for the FPP. This means that, assuming the ITER exhaust solution will be used for DEMO and FPP, FPP is right at the margin of the approach. It is interesting to note that criterion (2.4) is fulfilled although the exhaust criterion used in [4] was actually limiting the value of Psep, the heat flux into the scrape-off-layer volume, to the ITER value, which, assuming the Eich scaling for the width [10], can be written as PsepB/(qAR) = const. This is a consequence of the stepladder strategy keeping the absolute value of the density constant (precisely to deal with the exhaust) and hence B/(qR) = const. In this case, fLH ∼ 1/R2.8 on the stepladder, while fLH ∼ 1/R2 in (2.4) if all other parameters are kept constant. Hence, for the limited range of extrapolation, the difference between the two criteria is not too large. For larger variations (as will be discussed in the next section), the difference could be substantial.
In summary, a strategy in which the magnetic field is limited to that of present superconducting magnet technology, i.e. of the order of 6 T on axis for A = 3, will lead to devices of the order of R = 8–9 m. In order to satisfy the exhaust criterion (2.4), fLH is usually close to 1 and fGW is chosen at the upper limit, together with q not being too large. At FPP size, this is also needed to limit the ion temperature, which is usually already above the optimum value due to the lowish density due to the unfavourable scaling of the Greenwald density (nGW ∼ B/(qR)). The latter two choices (highish fGW and lowish q) on the other hand imply a limited QCD as can be seen from (2.3). These findings from the simple 0D model are fully in line with a more extensive analysis using a 1.5D transport code in conjunction with a divertor model [13].
4. The road to a tokamak fusion power plant: increasing magnetic field
From the discussion following equations (2.1)–(2.4), it is clear that extrapolation to reactor-like conditions can also be done by increasing the magnetic field. This is based on the assumption that, in future, magnet technology will be available to exceed the values typical for present large-scale superconducting fusion magnets. The present technology, as is used, for example, in ITER (NbTi or Nb3Sn), is limited by the maximum value of B that occurs at the inner leg of the toroidal field coil. The above-mentioned conventional limit of 6 T on axis corresponds to roughly 12–13 T at the inner leg, the value being set by the critical current density in the superconductor. With the prospects of high-temperature superconductors of the REBCO (rare earth barium copper oxide) type becoming available for use in fusion magnets, it is expected that this limit could be increased to around 20 T, with the limitation now coming from the need to support the increased mechanical stresses (e.g. [14]). Assuming that a satisfactory engineering solution can be found, we now analyse the possibilities that an increase of the central magnetic field up to a value of around 10 T can offer.
Starting from the stepladder approach shown in figure 2, it can be seen that a region below the yellow exhaust line, but above the other lines opens up as one moves to larger B and smaller R. In figure 3, we analyse how QCD could be increased by moving into this region, while at the same time satisfying the exhaust criterion. Figure 3a shows the R–B space for the same plasma physics parameters as used in the stepladder DEMO in figure 2a, but now with a slightly increased fusion power and the figure of merit QCD increased to 50 (which would correspond to a very attractive recirculating electrical power of less than 10%). It is clear that the operational space for this regime would only open up above 15 T, way beyond our assumptions even for improved magnet technology. However, because exhaust is more relaxed at higher B, lower R, we can now increase q, which has a stronger effect on QCD than on fZ,ITER, at least if βN is high enough. In figure 3b, this is demonstrated by increasing q to 6, at otherwise unchanged parameters. Now, an operational space opens up that would allow one to locate a point at e.g. R = 5 m and B = 10 T that would actually exceed the figures of merit QCD and fZ,ITER for the FPP shown in figure 2, at strongly reduced size. Thus, we conclude that it is possible to find more compact solutions that fulfil all requirements on the figures of merit at higher B. We also conclude that, with the physics assumptions made for the EU stepladder, an attractive FPP could be placed at R = 5 m, B = 10 T.
Figure 3 indicates a possible approach to benefit from the future availability of higher-field fusion magnets. The question remains if other strategies can lead to even more compact devices or if the plasma performance requirements can be relaxed w.r.t. to the stepladder parameters used in figure 3. One parameter that could still be used for optimization is the aspect ratio A, which, taken to its extreme, would lead to the spherical torus approach, as advocated, for example, in [15]. In a spherical torus, A approaches 1, while conventional tokamaks have an aspect ratio around 3. It is at present not clear if the confinement and stability parameters of spherical tori follow the same scaling laws as those of conventional aspect-ratio tokamaks, and hence we do not study this approach here, but rather refer to [15]. Instead, we stay with a conventional aspect ratio of A = 3.1. In order to find a solution with reduced plasma performance, we decrease βN to 3.0 and fGW to 1, keeping fLH = 1.2. Following the same strategy as above, we increase further q to increase the bootstrap fraction such that QCD can still have a high value. At q = 8.2, we can obtain an operational window2 at low R, down to R = 3 m at B = 10 T. This is shown in figure 4. However, we note that now the fusion power is as low as 200 MW and the H-factor needed to guarantee at least QPB = QCD, as indicated by the coloured contour levels in figure 4, must be postulated to substantially exceed the ITER level (H ≥ 2 in the region of interest). This is of course due to the high q which reduces confinement, which has to be compensated by high H-factor.
Thus, we conclude that it is not possible to access the region at R < 5 m unless more optimistic assumptions about the physics performance are made. This is actually consistent with the ARC [14] study that assumed an H-factor of 1.8 and more aggressive shaping and temperature profiles than used in our study to increase at the same time the fusion power.
5. Discussion and conclusion
In this contribution, we have analysed the size of future tokamak power plants. We have shown that the term ‘size’ involves a combination of the geometrical size and the strength of the confining magnetic field. For our figures of merit, however, no unique combination of R and B can be given that would describe ‘size’ in one parameter. This has been shown to be different if only core plasma physics is described, because the usual dimensionless parameters β, ρ* and ν* can be uniquely described in so-called dimensionless engineering parameters R5/4B and PR3/4 [16]. We have used a different approach here, mainly because both the empirical Greenwald limit and the exhaust figure of merit cannot be expressed in these dimensionless variables, which, for the latter, can be easily understood because atomic physics plays a role which sets an absolute energy scale.
Different strategies to increase the ‘size’ of tokamaks to become viable FPPs have been discussed. Increasing geometrical size, i.e. major radius R, and limiting B to values that can be achieved using present-day superconductors, typical power plants are of the size range R = 8–9 m, limited by the ability to exhaust the energy carried across the separatrix in charged particles through the divertor. In addition, aiming at steady-state tokamaks, the fusion gain Q is usually limited by the power requirement for CD. Assuming that magnet technology that allows higher values of B will be available in future, e.g. by using REBCO tapes that have a higher critical current density, it would be possible to decrease R at otherwise constant plasma performance. An operational point around 5 m, 10 T has been pointed out, at which a tokamak could produce 2.5 GW of fusion power in steady-state conditions, using plasma performance parameters that lie within the range of present tokamak experiments. Decreasing the size further needs an improvement in confinement and/or stability beyond these parameters, more typical of what is achieved in present-day experiments under transient conditions only. Hence, this route will need substantial development in both plasma physics and magnet technology.
Concerning typical roadmaps to fusion power using tokamaks, it will be important to demonstrate such improved parameters, in both physics and technology, as soon as possible. If major development steps are still to be demonstrated in a nuclear device, the risk for extrapolation will be enhanced considerably because these are less flexible for experimentation. This element must be taken into account when evaluating ‘fast’ strategies that aim at an accelerated development of fusion energy using tokamaks.
Acknowledgements
The author wants to acknowledge enlightening discussions with M. Coleman (CCFE) and M. Siccinio (IPP).
Footnotes
We assume that the DT fusion reaction is used, where D + T → He + n + 17.6 MeV.
Note that the precise value of q becomes critical in this region where the bootstrap fraction is high, indicating that a more sophisticated analysis will be required to confirm the exact result.
Data accessibility
This article has no additional data.
Competing interests
I declare I have no competing interests.
Funding
This work has been carried out within the framework of the EUROfusion Consortium and has received funding from the Euratom research and training programme 2014–2018 under grant agreement number 633053.
Disclaimer
The views and opinions expressed herein do not reflect those of the European Commission.
References
- 1.Ongena J, Koch R, Wolf R, Zohm H. 2016. Magnetic-confinement fusion. Nat. Phys. 12, 398–410. ( 10.1038/nphys3745) [DOI] [Google Scholar]
- 2.Donné AJH. 2019. The European roadmap towards fusion electricity. Phil. Trans. R. Soc. A 377, 20170432 ( 10.1098/rsta.2017.0432) [DOI] [PMC free article] [PubMed] [Google Scholar]
- 3.Zohm H. 2011. On the minimum size of DEMO. Fusion Sci. Technol. 58, 613–624. ( 10.13182/FST10-06) [DOI] [Google Scholar]
- 4.Zohm H. 2017. A stepladder approach to a tokamak fusion power plant. Nucl. Fusion 57, 086002 ( 10.1088/1741-4326/aa739e) [DOI] [Google Scholar]
- 5.ITER Physics Expert Group on Confinement and Transport; ITER Physics Expert Group on Confinement Modelling and Database; and ITER Physics Basis Editors. 1999. Chapter 2: Plasma confinement and transport. Nucl. Fusion 39, 2203 ( 10.1088/0029-5515/39/12/302) [DOI] [Google Scholar]
- 6.Greenwald M, Terry JL, Wolfe SM, Ejima S, Bell MG, Kaye SM, Neilson GH. 1988. A new look on tokamak density limits. Nucl. Fusion 28, 2199–2207. ( 10.1088/0029-5515/28/12/009) [DOI] [Google Scholar]
- 7.Martin Y., Takizuka T. 2008. Power requirement for accessing the H-mode in ITER. J. Phys.: Conf. Ser. 123, 012033 ( 10.1088/1742-6596/123/1/012033) [DOI] [Google Scholar]
- 8.Zohm H. 2018. On the use of high magnetic field in reactor grade tokamaks. J. Fusion Energy. Online First. ( 10.1007/s10894-018-0177-y) [DOI] [Google Scholar]
- 9.Reinke M. 2017. Heat flux mitigation by impurity seeding in high-field tokamaks. Nucl. Fusion 57, 034004 ( 10.1088/1741-4326/aa5145) [DOI] [Google Scholar]
- 10.Eich T, Sieglin B, Scarabosio A, Fundamenski W, Goldston RJ, Herrmann A. 2011. Inter-ELM power decay length for JET and ASDEX upgrade: measurement and comparison with heuristic drift-based model. Phys. Rev. Lett. 107, 215001 ( 10.1103/PhysRevLett.107.215001) [DOI] [PubMed] [Google Scholar]
- 11.Costley A. 2016. On the fusion triple product and fusion power gain of tokamak pilot plants and reactors. Nucl. Fusion 56, 066003 ( 10.1088/0029-5515/56/6/066003) [DOI] [Google Scholar]
- 12.Biel W, Lackner K, Sauter O, Wenninger R, Zohm H. 2017. Comment on ‘On the fusion triple product and fusion power gain of tokamak pilot plants and reactors'. Nucl. Fusion 57, 038001 ( 10.1088/1741-4326/aa4f51) [DOI] [Google Scholar]
- 13.Siccinio M, Fable E, Angioni C, Saarelma S, Scarabosio A, Zohm H. 2018. Impact of an integrated core/SOL description on the R and BT optimization of tokamak fusion reactors. Nucl. Fusion 58, 016032 ( 10.1088/1741-4326/aa9583) [DOI] [Google Scholar]
- 14.Sorbom B, et al. 2015. ARC: a compact, high-field, fusion nuclear science facility and demonstration power plant with demountable magnets. Fusion Eng. Design 100, 378–405. ( 10.1016/j.fusengdes.2015.07.008) [DOI] [Google Scholar]
- 15.Menard J, et al. 2016. Fusion nuclear science facilities and pilot plants based on the spherical tokamak. Nucl. Fusion 56, 106023 ( 10.1088/0029-5515/56/10/106023) [DOI] [Google Scholar]
- 16.Lackner K. 2008. Dimensionless engineering variables for measuring the ITER and reactor relevance of tokamak experiments. Fusion Sci. Technol. 54, 989–993. ( 10.13182/FST08-A1914) [DOI] [Google Scholar]
Associated Data
This section collects any data citations, data availability statements, or supplementary materials included in this article.
Data Availability Statement
This article has no additional data.