Skip to main content
. 2019 Jan 15;8(1):8. doi: 10.3390/pathogens8010008

Table 1.

Air and surface sampling protocols applied to the HVAC systems of Hospitals 1 and 2 before and after rotating dehumidification wheel (RDW) disinfection. (SA1 and SA2: surgery areas; IC and sIC: intensive and sub-intensive areas).

Hospital Months of Samplings Hvac Systems Sampling Conditions Matrix
HOSPITAL 1 September–December 2016 SA1
SA2
IC
sIC
First sampling with RDW in operation
May–July 2017 Second sampling with RDW in operation
(24 h after the disinfection)
Air and surfaces
HOSPITAL 2 April–May 2018 SA1
SA2
IC
sIC
First sampling with RDW in operation
July 2018 Second sampling with RDW in operation
(24 h after the disinfection)
Air and surfaces