Abstract
The bamboo treatment process starts with cutting, soaking in water, draining in free air, reinforcing in the fireplace, first-stage adhesive coating, hose-clamp installation, second-stage adhesive coating, and sand resurfacing. Data was taken from experimental testing of bamboo materials and bond strength tests of bamboo reinforcement in the laboratory of the Faculty of Engineering, University of Brawijaya Malang. The aim of treating and strengthening bamboo reinforcement is to overcome low-load capacity and prevent collapse due to slippage in bamboo reinforced concrete elements. Adhesive coating is employed to increase durability and prevent water absorption, while installing hose-clamps increases bamboo reinforcement slip resistance. The process outlined here represents the way to approach bamboo reinforcement, and laboratory data is processed into graphic images and tables of bond strength of bamboo reinforcement providing the basis for further research. This article comprises a standard operating procedure for treatment of bamboo reinforcement, graphic images, documentation photos, and data tables. The data is related to “Enhancing bamboo reinforcement using a hose-clamp to increase bond-stress and slip resistance” [1].
Keywords: Bond strength, Bamboo reinforcement, Strengthening, Bamboo
Specifications Table
| Subject | Engineering |
| Specific subject area | Civil and Structural Engineering |
| Type of data | Table, image |
| How data were acquired | Data was obtained from two experimental tests, namely the pull-out test (Fig. 14) and the beam flexural test (Fig. 16). Then, the test data is processed and analyzed into table data, image data, and documentation data |
| Data format | Raw and analyzed |
| Parameters for data collection | The main requirement for using bamboo as a concrete reinforcement is initial treatment. This involves the use of adhesives and hose-clamps to effectively increase the bond strength of bamboo reinforcement. Therefore a standard operating procedure and test data need to be established for the development of further research |
| Description of data collection | Bond strength data was obtained from testing bamboo reinforcement specimens after different treatments. Data from each specimen is processed and analyzed into table data, image data, and photo data which are described as single data. This single data is collected together, processed, compared, re-analyzed into table data, image data, and photo data, which is then called intact data |
| Data source location | University of Muhammadiyah Jember, Jember, 68121, Indonesia, and University of Brawijaya, Malang 65145, Indonesia |
| Data accessibility | Data with the article, raw data can be found in Table 1, http://bit.ly/2PvYuXS, and http://bit.ly/2NxiYgq |
| Related research article | Enhancing bamboo reinforcement using a hose-clamp to increase bond-stress and slip resistance. https://doi.org/10.1016/j.jobe.2019.100896 [1], |
Value of the Data
|
1. Data
In this article, data is presented in the form of the standard operating procedure (SOP) for bamboo reinforcement treatment, graphic images, documentation photos, and data tables. Standard operating procedure (SOP) of bamboo reinforcement treatment starts with cutting, soaking in water, draining in free air, reinforcing in the fireplace, first-stage adhesive coating, hose-clamp installation, second-stage adhesive coating, and sand resurfacing as shown in Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8, Fig. 9, Fig. 10, Fig. 11.
Fig. 4.
Bamboo petung (Dendrocalamus asper) at the felling site.
Fig. 5.
Drying of bamboo in free air for ±1 month after soaking.
Fig. 6.
Exfoliating the inside of the bamboo and adjusting the dimensions of the bamboo to the reinforcement plan.
Fig. 7.
Fireplace; treating the surface of bamboo reinforcement with a grinding machine.
Fig. 8.
Bamboo reinforcement of bamboo, Sikadur®-752, fine sand, hose-clamps, brushes, and steel stirrups.
Fig. 9.
The initial surfacing of Sikadur®-752 adhesive.
Fig. 10.
The installation of hose-clamps and the second layer of Sikadur®-752 adhesive.
Fig. 11.
Fine sand surfacing (volcanic dust from Raung Mountain, Jember, Indonesia).
Raw data of bond stresses and failure patterns in bamboo reinforcement pull-out tests of seven treatments are presented in Table 1, while analysis data in the form of a graph of the relationship between bond stress and variations in bamboo reinforcement treatment is shown in Fig. 1. A data graph of the load-deflection relationship of a bamboo reinforced concrete beam, with LVDT readings from after the collapse of the beam, is shown in Fig. 2. The raw data from Fig. 2 is provided in the following link: http://bit.ly/2PvYuXS. Fig. 3 shows the load-deflection relationship of bamboo reinforced concrete beams compared to results from previous researchers. The raw data from Fig. 3 is shown in the following link: http://bit.ly/2NxiYgq.
Table 1.
The data of bond strength and the failure pattern.
| Sample no | Specimens of pull-out test | Wide b (mm) | Thick t (mm) | Depth embedded in concrete cylinders (mm) | The length of the circumference of the reinforcement (mm) | Tensile load (kN) | Bond strength (MPa) | Average bond strength (MPa) | Failure pattern |
|---|---|---|---|---|---|---|---|---|---|
| 1 | (a) Normal | 15 | 15 | 200 | 60 | 12 | 1,00 | 1 | bond-slip failure |
| 2 | 15 | 60 | 12 | 1,00 | |||||
| 3 | 10 | 50 | 10 | 1,00 | |||||
| 4 | (b) Hose Clamp 10 cm | 15 | 15 | 200 | 60 | 13 | 1,08 | 1,09 | bond-slip failure |
| 5 | 15 | 60 | 13 | 1,08 | |||||
| 6 | 10 | 50 | 11 | 1,10 | |||||
| 7 | (c) Sikadur®-752 | 15 | 15 | 200 | 60 | 31 | 2,58 | 2,5 | bond-slip failure |
| 8 | 15 | 60 | 30 | 2,50 | |||||
| 9 | 15 | 60 | 29 | 2,42 | |||||
| 10 | (d) Sikadur®-752 + Hose Clamp 5 cm | 15 | 15 | 200 | 60 | 49 | 4,08 | 4,11 | bond and concrete cone failure |
| 11 | 15 | 60 | 49 | 4,08 | |||||
| 12 | 15 | 60 | 50 | 4,17 | |||||
| 13 | (d) Sikadur®-752 + Hose Clamp 10 cm | 15 | 15 | 200 | 60 | 42 | 3,50 | 3,64 | bond and concrete cone failure |
| 14 | 15 | 60 | 44 | 3,67 | |||||
| 15 | 15 | 60 | 45 | 3,75 | |||||
| 16 | (d) Sikadur®-752 + Hose Clamp 15 cm | 15 | 15 | 200 | 60 | 39,5 | 3,29 | 3,14 | bond and concrete cone failure |
| 17 | 15 | 60 | 36 | 3,00 | |||||
| 18 | 15 | 60 | 37,5 | 3,13 | |||||
| 19 | (d) Sikadur®-752 + Hose Clamp 20 cm | 15 | 15 | 200 | 60 | 35 | 2,92 | 3,01 | bond and concrete cone failure |
| 20 | 15 | 60 | 36 | 3,00 | |||||
| 21 | 15 | 60 | 37,5 | 3,13 |
Fig. 1.
The data graph of bond stress of bamboo reinforcement.
Fig. 2.
The load-deflection relationship of BRC beams and the readings of LVDT after the beam collapse.
Fig. 3.
The load-deflection relationship of BRC beams compared to previous research results [2].
2. Experimental design, materials, and methods
Bamboo petung (Dendrocalamus asper), features purplish black bamboo shoots, covered with feathers (miang) which resemble brown to black velvet. The large vertebra are 40–50cm long, and 12–18cm in diameter. Overall, petung bamboo reaches 20 m in height, with a curved tip, with color varying from green, dark green, purplish green, whitish green, or with white spots because of lichen. The nodes are surrounded by aerial roots. The thickness of the bamboo wall is between 11 and 36mm (Brink, M, 2008) in Wikipedia Indonesia [3].
Standard operating procedure (SOP) for preparing bamboo reinforcement includes installing hose-clamps, waterproof coating, sand coating, pull-out test setting, and flexural test setting.
Step 1: Bamboo cutting.
The bamboo used was at least three years old, with white spots, as shown in Fig. 4. Bamboo stems used are 6 m long from their base. This is because stems exhibit stronger mechanical properties and thickness up to 6 m. After logging, bamboo is cut to the size planned, and soaked in water for more than a month. Bamboo reinforcement pieces are cut to a length of approximately 1100 × 15mm. The number of nodes varies between two and three pieces.
Step 2: Drying of bamboo in free air for ±1 month [1,2,4] after soaking in water, as shown in Fig. 5.
Step 3: Fireplace treatment and adjustment of dimensions, as shown in Fig. 6.
Step 4: Fireplace and treating the surface of the bamboo reinforcement with a grinding machine, as shown in Fig. 7.
Step 5: Preparation of materials and tools, including, Sikadur®-752, fine sand, hose-clamps, and brushing, as shown in Fig. 8.
Step 6: The initial coating of adhesive Sikadur®-752, and installation of hose-clamps on the bamboo reinforcement, as shown in Figs. 9 and 10.
Instructions for installing hose-clamps:
-
•
The initial stage of Sikadur®-752 adhesive surfacing is carried out after the fireplace treatment, based on the planned dimensions.
-
•
Sikadur®-752 surfacing is carried out until it is even.
-
•
Installation of hose-clamps is carried out after the first Sikadur®-752 layer is dry.
-
•
The hose-clamps are installed in two ways, namely (1) by loosening the nut-bolts of the hose-clamps and directly inserting from the end of the bamboo reinforcement, or (2) opening the hose-clamps and installing them at the point of the installation plan.
-
•
Hose-clamps are tightened with a screwdriver, turned until it stops. There should be no additional tightening, so as to avoid defects and waterproof coating leaks on the bamboo reinforcement.
-
•
After the clamps are installed, a second Sikadur®-752 surfacing is carried out.
-
•
The coating of sand on bamboo reinforcement is applied after the second layer of Sikadur®-752 adhesive is half dry, as shown in Fig. 11.
Step 7: The construction of pull-out test specimens and flexural test specimens of bamboo reinforcement, as shown in Fig. 12.
Fig. 12.
Preparing pull-out test and flexural test specimens.
Step 8: Pull-out test setting. The bamboo reinforcement bond strength test uses a conventional pull-out test method [5]. Specimen details and pull-out test settings are shown in Fig. 13 and Fig. 14.
Fig. 13.
Specimen details for the pull-out test.
Fig. 14.
Pull-out test settings.
Step 9: The flexural test setting. This employs the four-point flexural test method. Details, geometry, and flexural test settings are shown in Fig. 15 and Fig. 16.
Fig. 15.
Detail and geometry of the bamboo reinforced concrete beam.
Fig. 16.
Flexural test settings for the four-point flexural test method.
Acknowledgments
The research described in this paper and publication costs are fully financially supported by the Research Support Program (PBR-UMJ) of the University of Muhammadiyah Jember, Indonesia.
Conflict of Interest
The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.
References
- 1.Muhtar, Dewi S.M., Wisnumurti, Munawir A. Enhancing bamboo reinforcement using a hose-clamp to increase bond- stress and slip resistance. J. Build Eng. 2019;26:100896. [Google Scholar]
- 2.Agarwal A., Nanda B., Maity D. Experimental investigation on chemically treated bamboo reinforced concrete beams and columns. Constr. Build. Mater. 2014;71:610–617. [Google Scholar]
- 3.Indonesia W. 2016. Bambu petung.Pdf.https://id.wikipedia.org/wiki/Bambu_betung [Google Scholar]
- 4.Rahman M.M., Rashid M.H., Hossain M.A., Hasan M.T., Hasan M.K. Performance evaluation of bamboo reinforced concrete beam. Int. J. Eng. Technol. IJET-IJENS. 2011;11:113–118. [Google Scholar]
- 5.Ghavami K. Bamboo as reinforcement in structural concrete elements. Cement Concr. Compos. 2005;27:637–649. [Google Scholar]