Land subsidence caused serious damages of mage-city infrastructures. This data in brief presents a new questionnaire to establish judgment matrix during the risk assessment of land subsidence. The data source of the assessment factors is provided. The analytical hierarchy process (AHP) and interval fuzzy AHP (FAHP) are used to calibrate the weights of assessment factors. The new questionnaire is used to collect the viewpoints from experts. Based on the viewpoints of experts, the judgment matrix can be established using pairwise comparison. The data presented herein was used for the article, titled “Risk assessment of mega-city infrastructures related to land subsidence using improved trapezoidal FAHP” Lyu et al. (2019) [1].

Keywords: Land subsidence, Risk assessment, Trapezoidal fuzzy number, FAHP, GIS


Specifications Table

Subject area Engineering
More specific subject area Safety, Risk, Reliability and Quality
Type of data Table
How data was acquired The assessment data was obtained from official internet sites of public administration and statistics. Part of the data was obtained through an expert survey on the importance degree between the influencing factors and risks.
Data format Raw, analyzed
Experimental factors The data were processed with 30 m resolution in GIS before analysis.
Experimental features The data were collected from the website of local government and the statistic yearbook of Shanghai (see Table 2).
Data source location Shanghai, China
Data accessibility Data are included in this article
Related research article Lyu, H.M., Shen, S.L., Zhou, A.N., Yang, J. Risk assessment of mega-city infrastructures related to land subsidence using improved trapezoidal FAHP, Science of the Total Environment, published online: https://doi.org/10.1016/j.scitotenv.2019.135310
Value of the Data
  • The data sources of all assessment factors related to the research article [1] are provided.

  • The data article provides a new questionnaire, which is used to collect viewpoints from experts.

  • Based on the viewpoints from the new questionnaire, the judgment matrix with the trapezoidal fuzzy number can be established.

  • The data article provides a calculation process to determine the trapezoidal fuzzy number and then establish the fuzzy judgment matrix, which can aid researchers and analysts in understanding how to apply the trapezoidal FAHP with the new questionnaire.

  • The new questionnaire can be applied in other cases related to risk assessment.

1. Data

Data including the hazard and vulnerability is used to assess the risk induced by land subsidence to significant infrastructures. Table 1 lists the data source and description of the assessment factors. Table 2 lists the vulnerability index for the risk assessment of the land subsidence [2,3]. Based on the obtained assessment factors, both the traditional and new questionnaires were used to obtain the viewpoints of the experts. Table 3 presents the new questionnaire. Table 4 comprises the linguistic variables and corresponding trapezoidal fuzzy number. The trapezoidal fuzzy number is used to express the importance of the assessment factors. Table 5 presents the statistical viewpoints obtained from six experts. Table 6 presents the extended trapezoidal FAHP judgement matrix for the hazard index. Table 7 presents the extended trapezoidal FAHP judgement matrix for the vulnerable index.

Table 1.

Data sources and description of each factor.

Index Sub-index Description Data source and format
Hi H1 Hazard intensity of land subsidence Data from Shanghai Institute of Land Resource Survey
H2 Groundwater extraction intensity
H3 Historical land subsidence
H4 Historical settlement rate
H5 Potential land subsidence Author's research result with 30 m resolution
H6 Average ground elevation Geospatial data cloud with 30 m resolution
Vj V1 Population density Data from reference SSB (2017) [2]
V2 Gross domestic product (GDP) per unit area
V3 Construction land ratio
V4 Metro line density
V5 Industrial output per unit area
V6 Elevated road density
V7 Disaster reduction input
V8 Recharge groundwater input

Table 2.

Data for vulnerability index assessment of Shanghai land subsidence division district (Data from SSY, 2017).

District V1 (×103p/km2) V2 (billion/km2) V3 (%) V4 (km/km2) V5 (billion/km2) V6 (km/km2) V7 (×103 rmb/km2) V8 (×103 rmb/km2)
Urban centre 24.07 2.51 93.47 1.03 7.48 1.59 363.8 2861.4
Pudong 4.55 3.7 70.48 0.43 7.67 0.44 192.5 128.4
Minhang 6.85 1.24 70.33 0.32 8.50 0.2 72.2 7.0
Jiading 3.40 0.89 47.77 0.12 11.54 0.03 84.2 91.5
Baoshan 7.49 1.07 67.46 0.28 6.61 0.4 230.9 159.0
Songjiang 2.91 0.75 40.36 0.09 5.52 0 20.1 1.5
Jinshan 1.37 0.33 35.3 0 2.67 0 47.2 7.9
Qingpu 1.81 0.46 29.31 0 2.31 0 30.7 2.1
Fengxian 1.70 0.32 26.69 0 2.08 0 31.6 10.6
Chongming 0.59 0.07 11.18 0 0.30 0 37.5 44.9

Table 3.

Newly designed consulting questionnaire for the risk assessment of land subsidence.

Factor Influence of the factor on the risk induced by land subsidence
1 2 3 4 5 6 7 8 9
Factor 1
Factor 2
Factor 3
Factor 4
……
Factor n

1.

Note: to ensure that each score can be assigned, you are suggested to assign each score to no more than two factors. Please tick [✓] in any one rating that you feel is appropriate for each factor.

Table 4.

Linguistic variables and corresponding trapezoidal fuzzy number.

Linguistic terms Ordinary assignment (AHP) Trapezoidal fuzzy number
Equal 1 1′= (1,1,1,1)
Slightly strong 3 3′= (1,1.222,1.857,2.333)
Fairly strong 5 5′= (1.5,1.857,3,4)
Very strong 7 7′= (2.333,3,5.667,9)
Absolutely strong 9 9′= (4,5.667,9,9)

(2,4,6,8) and (2′,4′,6′,8′) imply that the importance degrees belong to the interval variables.

Table 5.

Statistical viewpoints from six experts.

Factor Influence of the factor on the risk induced by land subsidence
1 2 3 4 5 6 7 8 9
Hazard intensity of land subsidence (H1) I I IV
Groundwater extraction intensity (H2) II II II
Historical land subsidence (H3) II III I
Historical settlement rate (H4) I III II
Potential land subsidence (H5) I III II
Average ground elevation (H6) II III I
Population density (V1) IV II
GDP per unit area (V2) II II II
Construction area ratio (V3) I II II I
Metro system density (V4) I II I II
Industrial output per unit area (V5) I I IV
Elevated road density (V6) I II II I
Disaster reduction input (V7) I II II I
Recharge groundwater input (V8) II II II

Note: Roman number in table represents selected times of the score from 1 to 9.

Table 6.

Extended trapezoidal FAHP judgement matrix for hazard index.

H1 H2 H3 H4 H5 H6
H1 (1,1,1,1) (1,1,1,1) (1,1.111,1.429,1.667) (1,1.222,1.857,2.333) (1,1.111,1.429,1.667) (1,1.111,1.429,1.667)
H2 (1,1,1,1) (1,1,1,1) (1,1.111,1.429,1.667) (1,1.111,1.429,1.667) (1,1.111,1.429,1.667) (1,1.111,1.429,1.667)
H3 (0.6,0.7,0.9,1) (0.6,0.7,0.9,1) (1,1,1,1) (1,1.222,1.857,2.333) (1,1.222,1.857,2.333) (1,1.111,1.429,1.667)
H4 (0.429,0.538,0.818,1) (0.6,0.7,0.9,1) (0.429,0.538,0.818,1) (1,1,1,1) (1.5,1.857,3,4) (1.917,2.429,4.334,6.5)
H5 (0.6,0.7,0.9,1) (0.6,0.7,0.9,1) (0.429,0.538,0.818,1) (0.25,0.333,0.538,0.667) (1,1,1,1) (1,1.222,1.857,2.333)
H6 (0.6,0.7,0.9,1) (0.6,0.7,0.9,1) (0.6,0.7,0.9,1) (0.154,0.231,0.412,0.522) (0.429,0.538,0.818,1) (1,1,1,1)

Table 7.

Extended trapezoidal FAHP judgement matrix for vulnerability index.

V1 V2 V3 V4 V5 V6 V7 V8
V1 (1,1,1,1) (1,1,1,1) (1,1.111,1.429,1.667) (1,1.222,1.857,2.333) (1.25,1.540,2.429,3.167) (1.5,1.857,3,4) (1.5,1.857,3,4) (1.5,1.857,3,4)
V2 (1,1,1,1) (1,1,1,1) (1,1,1,1) (1,1.111,1.429,1.667) (1,1.222,1.857,2.333) (1.25,1.540,2.429,3.167) (1.5,1.857,3,4) (1.5,1.857,3,4)
V3 (0.6,0.7,0.9,1) (1,1,1,1) (1,1,1,1) (1,1.111,1.429,1.667) (1,1.111,1.428,1.667) (1,1.222,1.857,2.333) (1,1.222,1.857,2.333) (1.25,1.540,2.429,3.167)
V4 (0.429,0.538,
0.818,1)
(0.6,0.7,0.9,1) (0.6,0.7,0.9,1) (1,1,1,1) (1,1.111,1.428,1.667) (1,1.222,1.857,2.333) (1.25,1.540,2.429,
3.167)
(1.25,1.540,2.429,3.167)
V5 (0.316,0.412,
0.649,0.8)
(0.429,0.538,0.818,1) (0.6,0.7,0.9,1) (0.6,0.7,0.9,1) (1,1,1,1) (1,1.222,1.857,2.333) (1.25,1.540,2.429,
3.167)
(1.5,1.857,3,4)
V6 (0.25,0.333,0.538,0.667) (0.316,0.412,0.649,0.8) (0.6,0.7,0.9,1) (0.6,0.7,0.9,1) (0.6,0.7,0.9,1) (1,1,1,1) (1,1.111,1.428,1.667) (1,1.111,1.428,1.667)
V7 (0.25,0.333,0.538,0.667) (0.25,0.333,
0.538,0.667)
(0.429,0.538,0.818,1) (0.316,0.412,0.649,
0.8)
(0.316,0.412,0.649,0.8) (0.6,0.7,0.9,1) (1,1,1,1) (1,1,1,1)
V8 (0.25,0.333,0.538,0.667) (0.25,0.333,0.538,0.667) (0.316,0.412,
0.649,0.8)
(0.316,0.412,0.649,
0.8)
(0.25,0.333,0.538,0.667) (0.6,0.7,0.9,1) (1,1,1,1) (1,1,1,1)

2. Experimental design, materials and methods

2.1. Consulting questionnaire

Fig. 1 shows the traditional questionnaire. Pairwise comparisons were used in the traditional questionnaire. In the traditional questionnaire, each assessment factor is compared with another [4,5]. The traditional questionnaire has two limitations: (i) obtaining expert judgments using the traditional questionnaire is tedious and time-consuming, and (ii) inconsistencies frequently arise from subjective expert judgments, which produces an inconsistent judgment matrix [6,7]. Assuming that there are n factors, every expert can make a number of pairwise comparisons n(n-1)/2 (see Fig. 1). The total number of pairwise comparisons increases when multiple factors are involved in the risk assessment hierarchy. The new questionnaire comprises the use of nine scores for obtaining the viewpoints of the experts (Table 3). The experts are required to assign a score to a factor. Based on the expert responses obtained using the new questionnaire, in the next analysis step, the analysts can make pairwise comparisons and establish a consistent judgment matrix [8,9]. Based on the consistent judgment matrix and the score obtained using the new questionnaire, the analysts can determine the triangular fuzzy numbers according to Table 4. Finally, the fuzzy judgment matrix can be established.

Fig. 1.

Fig. 1

Traditional questionnaire for pairwise comparison.

2.2. Responses from new questionnaire

Table 5 lists the statistical viewpoints from six experts. As listed in Table 5, the score for H1 ranges from 7 to 9; therefore, H1 is initially assigned as 7–9. It is noteworthy that 9 is selected four times. Owing to the same reason, H2 = 7–9, considering that both 7 and 9 are selected twice; H3 = 4–7, with 4 selected twice and 6 thrice; H4 = 4–6, with 5 selected thrice and 6 twice; H5 = 3–5, with 4 selected thrice and 5 twice; H6 = 1–3, with 2 selected thrice and 1 twice. Each element in the judgement matrix can be expressed as a ratio of one interval number to another, such as H1H2=7979, H1H3=7947, H1H4=7946, H1H5=7935, H1H6=7913, etc. Thus, a pairwise comparison judgement matrix can be obtained. Similarly, the judgment matrix of vulnerability index can also be obtained [[10], [11], [12]].

2.3. Establishment of trapezoidal fuzzy judgment matrix

Once the judgment from the Table 5 demand the consistent requirement, the trapezoidal fuzzy judgment can be established by replacing the trapezoidal fuzzy number (see Table 5). In the replacement process of each factor, it is noteworthy that the selection time of each score was considered to construct the triangular fuzzy number to obtain a trapezoidal fuzzy number that is as close as possible to the original ratio. Table 6, Table 7 list the judgement matrices with trapezoidal fuzzy numbers. The detailed calculation process can refer the related companion article Lyu et al. [1].

Acknowledgments

The research work described herein was funded by the Research Funding of Shantou University for New Faculty Member (Grant No. NTF19024-2019), and the Innovative Research Funding of the Science and Technology Commission of Shanghai Municipality (Grant No. 18DZ1201102). These financial supports are gratefully acknowledged.

Footnotes

Appendix A

Supplementary data to this article can be found online at https://doi.org/10.1016/j.dib.2019.105007.

Conflict of Interest

The authors declare that they have no known competing financial interests or personal relationships that could have appeared to influence the work reported in this paper.

Appendix A. Supplementary data

The following is the supplementary data to this article:

Multimedia component 1
mmc1.zip (375B, zip)

References

  • 1.Lyu H.M., Shen S.L., Zhou A.N., Yang J. Risk assessment of mega-city infrastructures related to land subsidence using improved trapezoidal FAHP. Sci. Total Environ. 2019 doi: 10.1016/j.scitotenv.2019.135310. published online. [DOI] [PubMed] [Google Scholar]
  • 2.SSB . 2017. Shanghai Statistics Bureau. Statistic Yearbook of Shanghai (in Chinese) Shanghai. [Google Scholar]
  • 3.Ministry Housing and Urban-Rural Development of the People's Republic of China. Metro Design Standard; 2013. GB50157. [Google Scholar]
  • 4.Li F., Phoon K.K., Du X., Zhang M. Improved AHP method and its application in risk identification. J. Constr. Eng. Manag. 2013;139(3):312–320. 10.1061/(ASCE)CO.1943-7862.0000605. [Google Scholar]
  • 5.Nezarat H., Sereshki F., Ataei M. Ranking of geological risks in mechanized tunneling by using Fuzzy Analytical Hierarchy Process (FAHP) Tunn. Undergr. Space Technol. 2015;50:358–364. [Google Scholar]
  • 6.Lee S. Determination of priority weights under multiattribute decision-making situations: AHP versus Fuzzy AHP. J. Constr. Eng. Manag. 2015;10 1061/(ASCE)CO.1943-7862.0000897, 05014015. in press. [Google Scholar]
  • 7.Saaty T.L. A scaling method for priorities in hierarchical structures. J. Math. Psychol. 1977;15:234–281. [Google Scholar]
  • 8.Lyu H.M., Sun W.J., Shen S.L., Zhou A.N. Risk assessment using a new consulting process in fuzzy AHP. J. Constr. Eng. Manag. 2019 ASCE. [Google Scholar]
  • 9.Lyu H.M., Shen S.L., Zhou A.N., Zhou W.H. Flood risk assessment of metro systems in a subsiding environment using the interval FAHP-FCA approach. Sustain Cities Soc. 2019;50:101682. doi: 10.1016/j.dib.2019.104468. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 10.Lyu H.M., Shen S.L., Zhou A.N. Perspectives for flood risk assessment and management for mega-city metro systems. Tunn. Undergr. Space Technol. 2019;84(2019):31–44. [Google Scholar]
  • 11.Lyu H.M., Sun W.J., Shen S.L., Arulrajah A. Flood risk assessment in metro systems of mega-cities using a GIS-based modeling approach. Sci. Total Environ. 2018;626:1012–1025. doi: 10.1016/j.scitotenv.2018.01.138. [DOI] [PubMed] [Google Scholar]
  • 12.Lyu H.M., Shen S.L., Yang J., Yin Z.Y. Inundation analysis of metro systems with the storm water management model incorporated into a geographical information system: a case study in Shanghai. Hydrol. Earth Syst. Sci. 2019;23:4293–4307. [Google Scholar]

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Supplementary Materials

Multimedia component 1
mmc1.zip (375B, zip)

Articles from Data in Brief are provided here courtesy of Elsevier

RESOURCES