Skip to main content
. 2019 Jun 26;40(20):2706–2717. doi: 10.1002/elps.201900167

Table 6.

Predicted LAMP structure size versus real LAMP structure size for LAMP primer set 2. n = 5

Structure Predicted size (bp) Average structure size (bp) Difference (bp)
Stem and Loop, x = 1 180 189 9
Stem and Loop ×2, x = 2 300 290 10
Stem and Loop ×3, x = 3 409 407 2
Stem and Loop ×4, x = 4 529 544 15
Stem and Loop ×5, x = 5 638 660 22
Stem and Loop ×6, x = 6 758 784 26

This article is being made freely available through PubMed Central as part of the COVID-19 public health emergency response. It can be used for unrestricted research re-use and analysis in any form or by any means with acknowledgement of the original source, for the duration of the public health emergency.