Skip to main content
. 2020 Aug 21;494:114627. doi: 10.1016/j.desal.2020.114627

Table 3.

Calculated technical characteristic of the virtual “Chtouka Ait Baha like” RO plant.

Calculated energy needs
Total nominal power (kWe) 45,740
Annual energy consumption (GWh/y) 380
Specific energy consumption (kWh/m3) 4.0



Calculated technical details of RO plant
Number of trains 16
Number of pressure vessels/train 150
Number of membrane elements/pressure vessel 7
Total number of membrane elementsa 16,800
Energy recovery devicesb 220
Feed pressure (bar) 64
Conversion rate 43.5%
a

The standard membrane surface for each membrane element is 37,15 m2.

b

The energy recovery device based on pressure exchanger is based on ERI PX300 model.