Skip to main content
Data in Brief logoLink to Data in Brief
. 2021 Mar 24;36:106973. doi: 10.1016/j.dib.2021.106973

A survey dataset to identify industry practices and challenges for mine rehabilitation completion criteria in Western Australia

Marit E Kragt a,, Ana Manero a,b
PMCID: PMC8086008  PMID: 33981813

Abstract

The development of acceptable and achievable completion criteria is fundamental to the successful relinquishment of mined land to a post-mining use. Despite the central role of completion criteria, there is still a need to build capacity and understanding of how to set targets and develop measurable completion criteria that are accepted by all stakeholders involved. The work described in this paper aimed to elicit industry practice, barriers, and opportunities for the development of feasible and acceptable completion criteria. We developed a quantitative survey that was administered online. The target respondents consisted of mining companies, consulting businesses, and relevant regulators in Western Australia. The survey questionnaire, raw survey data, and summary statistics are provided in this paper to increase research transparency and facilitate reproducibility of the methods by researchers in other jurisdictions.

Keywords: Closure criteria, Closure planning, Ecosystem restoration, Mine closure, Monitoring, Survey data

Specifications Table

Subject Management, Monitoring, Policy and Law
Specific subject area Mine rehabilitation
Type of data Table
Chart
How data were acquired Survey (survey questionnaire available at https://doi.org/10.26182/x2fw-s027)
Data format Raw
Analyzed
Parameters for data collection The target sample consisted of mining industry professionals directly involved in the writing or assessing of mine completion criteria—or related planning and closure processes. Target stakeholders:
i) Environmental managers or compliance officers within mining companies;
ii) Consultants engaged with developing mine closure plans and completion criteria; and
iii) State regulators with experience in assessing mine closure plans or mine completion processes.
Description of data collection Data was collected between June 2018 and October 2018 through an online survey. Potential participants were identified through purposive sampling and chain referrals, using the researchers’ professional networks, word-of-mouth, and publicly available information such as company and government websites, and published literature. Participants were approached via email, targeting managers in the rehabilitation and closure teams of mining companies, closure specialists at consulting businesses, and environmental officers or managers at State Government agencies involved in mine closure planning and approval (‘regulators’).
Data source location Institutions: Mining companies, Consulting businesses, State Government agencies
City/Town/Region: Western Australia
Country: Australia
Data accessibility Repository name: Pure, The University of Western Australia Research Repository
Data identification number: https://doi.org/10.26182/x2fw-s027
Direct URL to data: https://research-repository.uwa.edu.au/en/datasets/a-survey-dataset-to-identify-industry-practices-and-challenges-fo
Related research article M.E. Kragt and A. Manero, 2021, Identifying industry practice, barriers, and opportunities for mine rehabilitation completion criteria in Western Australia, J. Env. Manage., 287: 112258. DOI: 10.1016/j.jenvman.2021.112258.

Value of the Data

  • Setting feasible, acceptable, and measurable targets forms the basis for successful rehabilitation of mined lands, but little guidance exists on how such targets (‘completion criteria’) should be developed. This survey dataset captures what barriers and challenges are faced by industry stakeholders (mining companies, consultants, regulators) when developing completion criteria for mine site rehabilitation.

  • This dataset provides useful information for government agencies about what challenges mining proponents face. The data will also benefit researchers searching for information about mine rehabilitation and closure criteria.

  • The data-set, and accompanying questionnaire, may be used by other researchers who aim to conduct a similar study in other jurisdictions.

  • The authors are not aware of similar work that consulted with a large number of industry stakeholders and regulators about the processes followed and barriers encountered when developing mine completion criteria and closure plans.

1. Data Description

The data file contains the raw survey data of an industry survey conducted with mining company employees, consultants, and government agencies on how they develop or assess mine rehabilitation completion criteria and mine closure plans, and the barriers encountered in that process. A total of 75 responses were collected.

The first column of the Excel spreadsheet captures the date on which the survey was completed (Survey Date); the second column screens whether the respondent is involved in developing, advising on, or approving mine completion criteria and/or closure plans (only ‘yes’ respondents are included); the third column captures which group of stakeholders the respondent most identifies with (Consulting, Mining Industry, or Government); and the fourth column is a respondent identifier (ID) that captures whether the respondent is an employee of a mining company (MC), a consultant (C) or a regulator (R). The remaining columns are results for each survey question. The phrasing and answer options of each question are detailed in the survey questionnaire accessible at https://doi.org/10.26182/x2fw-s027.

Due to human ethics requirements, some variables and responses that were collected in the questionnaire had to be removed from the raw survey data to ensure that responses are non-identifiable. The following information has been removed from the publically available data file:

  • Any identifying information such as IP addresses, email addresses, and location of mine sites (Question S1-I2).

  • Questions where answers revealed respondents’ identifying information:
    • How do you make sure that your completion criteria (MC question S3-I4) / the completion criteria you develop (C question S3-C2) are SMART? (specific, measurable, achievable, resources, time-bound)?
    • Could you give one (or more) example(s) of measurable indicators that you use to assess progress towards your completion criteria?” (Questions S3-I6 and S3-C4)
    • What regulatory body are you part of?” (R question S1-G1)
    • The following teams are involved in advising on/assessing mine closure plans in your organisation__________” (Questions S5-I5 and S5-G1)

Descriptive statistics of the sample and survey responses are provided below. For ease of formatting, these descriptive statistics are provided in tabulated form.

1.1. Sample description (Table 1)

Table 1.

Surveyed stakeholder groups.

Stakeholder group % Count
Mining industry 54.7% 41
Consulting business 24.0% 18
Government agency 21.3% 16

TOTAL 100% 75

The majority of surveyed mining companies and consultants were involved in iron ore, gold, mineral sands, or mining of basic raw materials (Table 2), with operations spread across all regions of WA. A range of small, medium, and large mining operators participated in the study, with 2016–17 operating revenues ranging from less than 1 million AUD (n = 3) to over 5 billion AUD (n = 9) (Table 3). Almost half of consulting businesses surveyed were small local business, with the rest sole traders and large international companies (Table 3). Government employees (henceforth ‘Regulators’) came from the Department of Biodiversity, Conservation and Attractions (n = 6); Department of Mines, Industry Regulation and Safety (n = 3); Department of Water and Environmental Regulation (n = 3); and the Department of Planning, Lands and Heritage (n = 2). Two government employees did not state which agency they were affiliated with.

Table 2.

Primary minerals relevant to mining companies and consulting business respondents.

Mining industry: Predominantly mined mineral(s) by our organisation
Consulting: Type of mining industry that is primary client
% Count % Count
Iron ore 27.1% 16 20.0% 16
Gold 13.6% 8 20.0% 16
Other (e.g. copper, lithium) 25.4% 15 13.8% 11
Mineral sands 10.2% 6 12.5% 10
Bauxite 6.8% 4 8.8% 7
Rare earths 0 8.8% 7
Diamonds 1.7% 1 6.3% 5
Coal 5.1% 3 5.0% 4
Salt 0 3.8% 3
Basic raw materials 10.2% 6 1.2% 1

TOTAL 100% 59 100% 80

Table 3.

Size of mining companies and consulting businesses in survey responses.

What was your company's approximate operating revenue in the 2016–17 financial year?
What is the approximate size of your company?
Mining industry operating revenue % Count Consulting business size % Count
< 1 million 7.5% 3 Large consulting business with offices in multiple (intern)national locations 27.8% 5
1–9 million 7.5% 3
10–49 million 7.5% 3 Large consulting business with several offices in Western Australia 0
50–99 million 5.0% 2
100–499 million 10.0% 4 Small-medium consulting business with one office in Perth (or elsewhere in WA) 44.4% 8
500–999 million 2.5% 1
1–5 billion 10.0% 4 Sole trader 22.2% 4
> 5 billion 22.5% 9 Other, namely 5.6% 1
Don't know 27.5% 11

TOTAL 100% 40 TOTAL 100% 18

1.2. Land tenure and decisions about post-mining land use (Table 4, Table 5, Table 6)

Table 4.

Tenure at the site prior to the establishment of the mine lease (mining industry respondents only).

What was the tenure at the site prior to the establishment of the mine lease? Mining industry
Pastoral lease 35.7% 25
Unallocated crown land 25.7% 18
Private land 12.9% 9
Native title 11.4% 8
Forestry reserves 8.6% 6
Reserve land 5.7% 4
Other, namely 0
Don't know 0

TOTAL 100% 70

Table 5.

Pre- and post-mining land use at sites selected by survey respondentsa.

Land use Pre-mining land use (# of sites) Post-mining land use (# of sites) Pre-mining LU = Post-mining LU (# of sites)
Pastoral 25 25 24
Natural ecosystem 17 19 14
Forestry 6 4 4
Agriculture 5 6 5
Recreation 1 6 1
Other (e.g. industrial or commercial, residential, or energy generation) 3 12
a

The number of pre- and post-mining land uses is larger than the 39 total received responses because all but three sites had multiple pre-mining land uses and/or multiple post-mining land uses.

Table 6.

Decision making framework(s) used to choose the end land use (mining companies and consulting only).

What decision making framework(s) did you use to choose the end land use? Mining industry Consulting business
Based on what was there before 37.3% 25 14.1% 9
Negotiated with the regulator 13.4% 9 18.8% 12
Negotiations with the client 18.8% 12
Negotiated with local communities 13.4% 9 15.6% 10
Specified by the regulator (e.g. in approval) 13.4% 9 4.7% 3
Multi-Criteria Analysis 11.9% 8 7.8% 5
Landscape capability assessments 7.5% 5 10.9% 7
Cost-Benefit Analysis 1.5% 1 4.7% 3
No decision-making framework 1.5% 1 0
Something else 0 4.7% 3

TOTAL 100% 67 100% 64

1.3. Development of completion criteria and associated challenges (Table 7, Table 8, Table 9, Table 10, Table 11)

Table 7.

Level of detail of completion criteria developed for specific site (mining industry only).

How refined are the completion criteria developed for the site? Mining industry
Criteria have not yet been developed for the site 2.7% 1
Criteria are generic and broadly indicative 40.5% 15
Criteria have been refined for the site 43.2% 16
Criteria are very detailed and specific 13.5% 5

TOTAL 100% 37

Table 8.

Do completion criteria have measurable indicators? (Mining industry only).

Does each of your completion criteria have a measurable indicator? Mining industry
Yes, ALL of our criteria have measurable indicators against them 27.8% 10
Yes, SOME of our criteria have measurable indicators against them 47.2% 17
No, NONE of our criteria have measurable indicators against them 0
No, we are still in the process of determining indicators for our criteria 25.0% 9

TOTAL 100% 36

Table 9.

Regulators' perception of completion criteria assessed in mine closure plans.

In general, are the completion criteria in mine closure plans sufficiently detailed and site specific? In general, do the completion criteria in mine closure plans have measurable indicators against each criteria?
The majority of the plans I see have detailed and specific CC/measurable indicators 0 7% 1
This varies greatly between sites 13% 2 7% 1
This varies greatly between companies 53% 8 29% 4
The majority of the plans I see lack detail in their CC/measurable indicators 33% 5 57% 8

TOTAL 100% 15 100% 14

Table 10.

Information source(s) used to guide the development of completion criteria (mining and consulting only).

What information source(s) do you use to guide the development of completion criteria? Mining industry Consulting business
Guidelines for Preparing Mine Closure Plans 19% 31 16% 16
Rehab team's knowledge 16% 26 14% 14
Our previous closure plans 15% 24 12% 12
Internal guidelines 10% 17 4% 4
Closure plans from others 9% 14 5% 5
Approvals team's knowledge 7% 12 9% 9
Mine Closure Leading Practice Handbook 5% 8 8% 8
EPA Environmental Factor Guidelines 4% 7 8% 8
Mine Rehabilitation Leading Practice Handbook 4% 7 7% 7
EPA Guidance “Rehabilitation of Terrestrial Ecosystems” 4% 6 7% 7
SERA Standards for Ecological Restoration 1% 1 5% 5
Other 6% 9 4% 4
Don't know 1% 1 0

TOTAL 100% 163 100% 99

Table 11.

Risks taken into account when developing/assessing completion criteria.

What risks do/did you take into account when developing/assessing completion criteria (for this site?) (select as many as apply) Mining industry
Consulting business
Regulators
TOTAL
% # % # % # count
Failure of vegetation establishment 7.2% 24 7.5% 11 8.3% 12 47
Erosion risks 7.2% 24 7.5% 11 7.6% 11 46
Impacts on groundwater 7.5% 25 6.1% 9 8.3% 12 46
Impacts on surface water 7.2% 24 6.8% 10 7.6% 11 45
Financial (e.g. company resources changing) 7.8% 26 6.1% 9 4.1% 6 41
Acid drainage 6.0% 20 6.1% 9 7.6% 11 40
Landforms not created to design standards 6.0% 20 6.1% 9 6.9% 10 39
Extreme weather (e.g. likelihood of cyclones, flood events, droughts) 5.7% 19 6.8% 10 6.9% 10 39
Impacts on threatened flora and fauna 5.4% 18 6.1% 9 7.6% 11 38
Ecological communities do not develop 5.4% 18 7.5% 11 6.2% 9 38
Human access to relinquished mine site (e.g. pit lakes) 5.7% 19 6.8% 10 5.5% 8 37
Regulatory changes 6.6% 22 5.4% 8 3.4% 5 35
Climate change effects on long term rehabilitation outcomes 4.8% 16 4.1% 6 6.2% 9 31
Cumulative risks across the catchment 3.6% 12 2.7% 4 5.5% 8 24
Litigation over environmental or social outcomes 4.5% 15 3.4% 5 2.8% 4 24
Community expectations being too high 3.6% 12 5.4% 8 2.1% 3 23
Community changing their preferences 4.8% 16 3.4% 5 1.4% 2 23
Other, namely 1.5% 5 2.0% 3 2.1% 3 11

TOTAL 93% 335 93% 147 92% 145 627

A few significant differences are observed in rankings (Table 12). ‘Small’ mining companies (with less than 100 million operating revenue) place more importance on the statement ‘Regulator imposes additional standards on previously approved CC’ than medium- to large-sized mining companies (p = 0.06).

Table 12.

Mean ranked importance of challenges when developing completion criteria (ranked from 1 = most important to 8 = least important). Standard deviations in parentheses. (n = number of responses received).

Challenge Mining industry (n = 35) Consultants (n = 17) Regulators (n = 12)
Insufficient data to develop evidence-based CC 3.23 (1.99) 2.24 (1.73) 1.58 (0.76)
Alternative post-mine land uses not adequately explored 3.97 (2.26) 3.88 (2.08) 3.67 (1.70)
No appropriate reference to benchmark achievement against 4.69 (1.88) 4.47 (1.85) 2.83 (1.28)
Government departments set different standards 3.49 (1.84) 4.65 (1.61) 5.58 (1.98)
Approved CC are impossible to achieve 5.40 (2.07) 4.00 (2.11) 4.25 (1.23)
Regulator imposes additional standards on previously approved CC 3.94 (1.84) 5.41 (1.46) 5.75 (1.09)
Proponents are required to monitor everything, instead of selectively 4.97 (1.72) 5.47 (1.79) 6.00 (1.22)
Something else 6.31 (2.80) 5.88 (3.07) 6.33 (2.90)

Comparing between stakeholders, the mining industry rates ‘Insufficient data’ and ‘Approved completion criteria are impossible to achieve’ as a less important challenge than consulting businesses and government agencies (p = 0.07 and p = 0.03 respectively). The mining industry places more importance than consulting businesses and government agencies on ‘Government departments all set different standards’ (p = 0.03) and ‘Regulator imposes additional standards on previously approved completion criteria’ (p = 0.00). Government agencies place a higher ranking on ‘We have no appropriate reference to benchmark achievement against’ than the other two stakeholder groups (p = 0.01).

1.4. Monitoring and evaluation practices (Table 13, Table 14, Table 15, Table 16, Table 17)

Table 13.

Approaches to evaluating progress towards rehabilitation and meeting completion criteria.

How do you typically evaluate progress towards completion criteria? Mining industry Consulting business
Compare against benchmarked analogue/reference sites 42.4% 25 39.5% 15
Monitoring whether the system's trajectory is towards a stable system 40.7% 24 39.5% 15
ISO or other standards 8.5% 5 5.3% 2
No stated benchmark 5.1% 3 0
Compare against agreed criteria/outcomes 1.7% 1 7.9% 3
Other 1.7% 1 7.9% 3

TOTAL 100% 59 100% 38

Table 14.

Typical evaluation/monitoring methods used.

What evaluation/monitoring method(s) do you typically use to assess completion criteria? Mining industry Consulting business
Vegetation transects 18.0% 23 20.3% 14
Ecosystem Function Analysis/ Landscape Function Analysis 14.8% 19 15.9% 11
Remote sensing 11.7% 15 17.4% 12
Soil and/or water testing 18.0% 23 10.1% 7
Erosion/landform stability plots 14.1% 18 13.0% 9
Permanent vegetation plots 11.7% 15 10.1% 7
Fauna trapping 7.0% 9 2.9% 2
Grazing / cropping trials 0.8% 1 2.9% 2
Other (visual monitoring, combination of methods, …) 3.9% 5 7.2% 5

TOTAL 100% 128 100% 69

Table 15.

Reasons for using specific monitoring methods.

What are the main reasons for choosing that/those monitoring method(s)? Pick up to three options. Mining industry Consulting business
To address our specific completion criteria 30.2% 26 28.6% 12
Based on our previous experiences 20.9% 18 23.8% 10
To detect early effectiveness of interventions 17.4% 15 19.0% 8
To improve statistical efficiency (e.g. power analysis) 9.3% 8 9.5% 4
Based on referenced best practice 7.0% 6 9.5% 4
Based on external guidelines 9.3% 8 0
Based on examples from other businesses 3.5% 3 2.4% 1
Other (e.g. based on approval processes) 1.2% 1 7.1% 3
Don't know 1.2% 1 0

TOTAL 100% 86 100% 42

Table 16.

Key considerations when choosing a reference site.

What are the key considerations when choosing a reference site? Pick up to three Mining industry Consulting business
Matches anticipated end land use 19% 13 26% 10
Matches pre-existing vegetation at mine site 29% 20 11% 4
Suitability to end land use 19% 13 18% 7
Based on what's achievable 7% 5 24% 9
Proximity to mine site 16% 11 8% 3
Similar disturbance history 3% 2 8% 3
Similar grazing pressure 1% 1 3% 1
Other, namely 4% 3 3% 1
Don't know 0 0

TOTAL 100% 68 100% 38

Table 17.

Time points at which progress is monitored.

At what points in time do you monitor progress? Mining industry Consulting business
Annually 40.0% 14 18.8% 3
Periodically 8.6% 3 12.5% 2
At pre-defined points in time, typically 37.1% 13 37.5% 6
Other, namely 11.4% 4 31.2% 5
Don't know 2.9% 1 0

TOTAL 100% 35 0% 16

1.5. Coordination and engagement with other organizations (Table 18, Table 19, Table 20)

Table 18.

Key regulators that respondents engage with.

Who is/are the key regulator(s) that you engage with when developing mine completion criteria and planning for closure? / Who is/are the other key regulator(s) that you engage/consult with when advising or assessing mine closure plans? Mining industry
Consulting business
Regulators
% # % # % #
DMIRS (Dep. Mines, Industry reg., Safety) 23% 29 24% 16 19% 9
DWER (Dep. Water and Environmental Regulation) 18% 22 13% 9 19% 9
EPA (Environmental Protection Agency) 12% 15 13% 9 15% 7
DBCA (Dep. Biodiversity, Conservation, Attractions) 12% 15 13% 9 6% 3
JTSI (Dep. Jobs, Tourism, Science, Innovation) 5% 6 7% 5 11% 5
DPLH (Dep. Planning, Lands, Heritage) 7% 9 3% 2 6% 3
Parks and Conservation Commission 2% 3 1% 1 9% 4
Pastoral Lands Board 1% 1 6% 4 4% 2
DPIRD (Dep. Primary Industries and Regional Development) 2% 3 3% 2 4% 2
Local government 7% 9 1% 1 0
Forest Product Commission 3% 4 1% 1 2% 1
We don't engage with regulators 2% 3 1% 1 0
WaterCorp 1% 1 1% 1 0
DLGSCI (Dep. Local Government, Sport and Cultural Industries) 0 1% 1 0
Pilbara Development Commission 0 1% 1 0
Other, namely 3% 4 6% 4 4% 2

TOTAL 100% 124 100% 67 100% 47

Table 19.

Do you have one contact person in the department, or do you have multiple points of contact?

Mining industry Consulting business
We have one consistent contact person 28.1% 9 0
We liaise with different persons at the department 71.9% 23 100% 16

Table 20.

Key community stakeholders that respondents engage with.

What community stakeholders do you typically engage with when developing your completion criteria? (open answer question) (# of responses) Mining industry (n = 35)
Consulting business (n = 17)
Regulators (n = 12)
% # % # % #
None 11% 4 35% 6 53% 9
Pastoral owners/Pastoralists/Landholders 46% 16 59% 10 12% 2
Traditional owners/Aboriginal groups/Indigenous claimants/Native title groups 49% 17 53% 9 12% 2
Local Government/Shire 34% 12 41% 7 6% 1
Regional Government 6% 2
Local communities 17% 6 35% 6
Other tenement neighbours/Adjacent landowners 14% 5 6% 1
NGO's (e.g. Wildflower Society) 3% 1 29% 5
Catchment Council/NRM Groups 9% 3 6% 1
Local businesses 12% 2
Usually arrange by client 12% 2
None for crown land 6% 2
Research partners 3% 1
Stakeholder engagement will occur as sites approach closure 3% 1

1.6. Resources

The following two tables synthesise five open answer responses about the resources avaialble to meet, develop, or evaluate completion criteria (Tables 21 and 22).

Table 21.

Resource availability to meet/develop/evaluate completion criteria.

Does your business have sufficient resources to meet/develop/evaluate mine completion criteria or provide input into mine closure planning? Please think of financial resources, knowledge, staff numbers, practical skills, etc. Mining industry
Consulting business
Regulators
% # % # % #
Yes we have sufficient resources 71% 27 41% 7 14% 2
We lack staff 11% 4 14% 2
We lack knowledge/data 5% 2 35% 6 7% 1
We lack financial resources 5% 2
We lack practical skills 3% 1
We lack guidance from regulator 12% 2
We lack examples of successful mine closures 6% 1 7% 1
We don't have enough time available 14% 2
We don't have sufficient resources available (no explanation provided) 5% 2 6% 1 43% 6

TOTAL 100% 38 100% 17 100% 14

Table 22.

Are current resources provided by the regulator(s) sufficient to help planning of completion criteria?.

Are the current resources provided by the regulator(s) sufficient to help your planning of completion criteria? Mining industry Consulting
Yes, there is sufficient guidance available 33% 13 38% 6
We need access to consistent staff with the appropriate knowledge 18% 7 25% 4
We need guidelines for developing completion criteria 13% 5 6% 1
We need greater alignment between government departments 8% 3 13% 2
We need more realistic criteria expectations 5% 2 13% 2
We need faster response times to submissions 10% 4
We need more policy guidance on mine relinquishment 8% 3
We need defined examples of expectation and benchmarks 5% 2
We need more sharing of rehab data 3% 1 6% 1

TOTAL 100% 40 100% 16

2. Experimental Design, Materials and Methods

This study used a two-phase exploratory research design [1] that consisted of (1) semi-structured qualitative interviews, which informed the development of (2) an online survey that is reported in this DIB paper. In-depth interviews were conducted to gain an understanding of the range of barriers and challenges faced by industry and regulatory stakeholders around mine rehabilitation, developing completion criteria, closure planning, monitoring and risk management. The interviews informed the development of a broad industry survey that was administered online and is reported here.

The survey data was collected between June and October 2018. The target sample consisted of WA mining industry professionals who are directly involved in the writing or assessing mine completion criteria—or related planning and closure processes. Three groups of stakeholders were targeted: i) environmental managers or compliance officers within mining companies, ii) consultants engaged with developing mine closure plans and completion criteria; and iii) State regulators with experience in assessing mine closure plans or mine completion processes [2].

Respondents were sampled through non-probability sampling techniques, including convenience sampling, expert sampling, and chain-referrals [3]. Potential participants were identified through professional networks of the project staff, word-of-mouth, and from publicly available information such as company websites (e.g. authors of company mine closure plans), government websites (e.g. Department of Mines’ Mines and Mineral Deposits Database1), and published literature (e.g. Mine Closure Conference proceedings). Potential respondents were invited via email through an anonymous survey link. The initial survey invitation was sent to 100 valid email addresses.2 Respondents were asked to distribute the link to other members of their team(s) involved in mine closure or in developing mine completion criteria. The industry survey was completed by 75 respondents: 41 mining companies’ employees (survey IDs MC9-MC49), 18 consultants (survey IDs C6-C23), and 16 government employees (survey IDs R7-R22). Because the software system does not keep count of forwarded surveys (only those completed), we cannot identify the precise survey response or refusal rate.

Because some questions were phrased differently for different stakeholders, and depending on a respondent's answers to previous questions, the number of questions shown to respondents varied (see attached questionnaire). The survey employed a variety of question types, ranging from ranking and Likert scale questions to open answer text. The survey was administered and coded in Qualtrics online survey software [4] and consisted of six parts:

  • 1.

    Questions about the respondent's organization

  • 2.

    Land tenure and decisions about post-mining land use

  • 3.

    Development of completion criteria and associated challenges

  • 4.

    Monitoring and evaluation practices

  • 5.

    Coordination within the organization and engagement with other organizations

  • 6.

    Resources needed to define completion criteria

Ethics Statement

This research was conducted under the University of Western Australia ethics protocol RA/4/20/4241. All research participants provided informed consent.

CRediT Author Statement

Marit Kragt: Conceptualization, Methodology, Software, Formal analysis, Investigation, Data curation, Writing - Original Draft, Supervision, Project administration; Ana Manero: Methodology, Formal analysis, Investigation, Data Curation, Writing - Original Draft.

Declaration of Competing Interest

The authors declare that they have no known competing financial interests or personal relationships which have or could be perceived to have influenced the work reported in this article.

Acknowledgments

This work was commissioned by the Western Australian Biodiversity Science Institute (WABSI). Funding for this project was received from WABSI; Department of Mines, Industry Regulation and Safety (DMIRS); Department of Water and Environmental Regulation (DWER); Alcoa; BHP; Hanson Heidelberg Cement; IGO; Iluka; Rio Tinto; Roy Hill and South32. In kind support was provided by Curtin University, the Department of Biodiversity Conservation and Attractions, and Murdoch University. Marit Kragt was funded by the Australian Government as an Australian Research Council Discover Early Career Award (project DE160101306). Ana Manero was supported by the Australian Research Council (project FL190100164) to carry out the manuscript review and resubmission.

Footnotes

2

Any email address that did not ‘bounce’ was considered a ‘valid’ address.

Contributor Information

Marit E. Kragt, Email: marit.kragt@uwa.edu.au.

Ana Manero, Email: ana.manero@anu.edu.au.

References

  • 1.Creswell J.W., Plano Clark V.L. Third edition. SAGE Publishing; Thousand Oaks, CA, USA: 2017. Designing and Conducting Mixed Methods Research. ISBN: 9781483347011. [Google Scholar]
  • 2.Kragt M.E., Manero A. Identifying industry practice, barriers, and opportunities for mine rehabilitation completion criteria in Western Australia. J. Env. Manag. 2021;287 doi: 10.1016/j.jenvman.2021.112258. [DOI] [PubMed] [Google Scholar]
  • 3.Daniel J. SAGE Publishing; Thousand Oaks, CA, USA: 2012. Sampling Essentials: Practical Guidelines for Making Sampling Choices. [DOI] [Google Scholar]
  • 4.Qualtrics. Qualtrics Software, Provo, Utah, USA 2018. Available at: https://www.qualtrics.com.

Articles from Data in Brief are provided here courtesy of Elsevier

RESOURCES