. 2021 Dec 17;7(12):e08631. doi: 10.1016/j.heliyon.2021.e08631

Multiobjective optimal power flow for static voltage stability margin improvement

Rebeccah Kyomugisha a,, Christopher Maina Muriithi b, Milton Edimu c
PMCID: PMC8715161  PMID: 35005280

Abstract

Worldwide, utilities are aiming to increase the stability of modern power systems during system disturbances. Optimizing generation scheduling can improve system security in contingency and stressed conditions while lowering losses and generation costs. An efficient operating strategy for maintaining power system stability is proposed in this work. The paper focuses on incorporating a Voltage Collapse Proximity Index (VCPI) in the traditional optimal power flow problem for multiobjective optimization (MO). Different case studies are assessed to evaluate the impact on the control variables. A Preference Selection index (PSI) is utilized to determine the best-case study for optimal system operation. The effectiveness of the proposed approach is tested on standard IEEE 30-bus and IEEE 57-bus during normal, contingency, and stressed conditions using MATPOWER. During normal conditions, the MO voltage stability constrained optimal power flow (VSC-OPF) increases the system stability by 28.13 % higher than the single objective (SO) case. Furthermore, the transmission losses are lowered by 14.69% with the proposed MO approach. During line outage contingency conditions, the voltage stability enhancement and loss reduction are higher in the MO than in the SO case by 13.60% and 23.19%. However, the loss minimization and stability improvement during normal and contingency conditions come at a slightly higher generation cost of 5.05% in both systems. On the other hand, during stressed conditions, the SO performs better in voltage stability improvement (by 8.77%) and loss reduction (by 6.97%) than in the MO voltage stability constrained OPF. Additionally, PV Curve analysis for the two systems indicates that voltage stability in MO OPF problems provides a more significant margin enhancement of 9.00%, 118.95% in normal and contingency, respectively, higher than the SO case. However, the SO case increases the load margin by 12.36% more than the MO case in stressed conditions. Consequently, the PSI ranks the multiobjective optimization of the three objectives as the most optimal way for operating the systems in normal and line outage contingency conditions. However, during increased load conditions, the system performance is better if a singular objective function is considered. This is due to the lack of adequate reactive power generation during stressed conditions, and hence a singular objective focus is sufficient to assure system stability. Therefore, the proposed approach is an effective preventive control measure for possible voltage collapse in typical power systems. The resulting improvement also brings about a sufficient system stability margin, causing the system to become more secure.

Keywords: Fuzzy decision making, MOPSO, Preference Selection Index, PV curves, VCPI, Voltage collapse


Fuzzy decision making, MOPSO, Preference Selection Index, PV curves, VCPI, Voltage collapse.

1. Introduction

The voltage instability problem is becoming a severe issue in modern power systems because the generation and transmission capacity is unable to meet the increasing load demand. At the same time, the lack of adequate reactive power sources in the system leads to bulk power losses in transmission lines [1]. The conditions worsen during system disturbances. Therefore, it is essential to consider voltage stability improvement among the objectives of the optimal power flow (OPF) problem. OPF is one of the significant tools used over decades in energy management systems for reliable operation and proper planning of modern power systems. The OPF problem is a non-linear, non-convex, and multi-dimensional optimization problem with control variables such as voltage magnitude, active and reactive power generation as continuous variables, and transformer tap ratios and shunt capacitor as discrete variables [2]. In high-risk voltage instability situations such as heavily loaded and line outage contingency conditions, the voltage limit constraint might be insufficient to assure the acceptable voltage stability level. Instead, the objective function should incorporate or focus on the voltage stability enhancement to guarantee system security [3]. Hence, the renewed interest in voltage stability constrained optimal power flow problems [1, 3, 4, 5, 6, 7, 8, 9].

In the recent literature, three main approaches have been used to evaluate the voltage stability constrained OPF (VSC-OPF) problems. Firstly, in [1, 3, 10, 11, 12, 13, 14], the voltage stability indices (VSI) are formulated as singular objective functions. VSIs describe the system stability by measuring the distance of the actual state of the system to the stability limit. In [1], the proposed approach enhanced the voltage stability margin by 19.96%, 7.55%, and 0.18% for IEEE 30-, IEEE 57-, and IEEE 118-bus systems, respectively. Moreover, during line outage conditions, the system loadability was also enhanced by an average of 3.75% across the three test systems. [3] also used this approach to evaluate the effectiveness of different stability indices for generation cost, emission, transmission loss reduction, and maximum loadability enhancement. The results indicated that VCPI reduced the transmission system losses by 58.11%, 49.64%, 35.59% and, 62.00% for IEEE 14-, IEEE 30-, IEEE 57- and IEEE 118-buses, respectively, compared to the L-index. On the other hand, L-index gave the maximum loadability on the test systems. Authors in [5, 15] also incorporated the L-index summation as one of the objective functions for validating the proposed algorithms. In [16], the summation of L-index as the objective function under a single line outage contingency was also evaluated. Despite the simplicity and less computational requirements in this approach [1], there is still a lack of operational practicality. Power systems have conflicting objectives such as generation cost and loss minimization, which must be addressed simultaneously. The generation costs also in this approach are lower since only one objective is minimized. However, the system is more prone to higher transmission losses.

The voltage stability indices are formulated in a multiobjective (MO) optimization problem in the second approach. The MO is treated as a single-objective optimization by assigning suitable weights to each objective function, and then only a single solution is obtained [17, 18]. The merging of voltage stability and generation cost objective functions using the weighted sum approach in [19] provided a higher reduction in generation cost and loss of 0.15% and 7.42%, respectively, compared to the singular objective function approach. Additionally, the voltage stability improvement was 4.03% more than the single-objective approach. However, the problem with this technique is that it requires weights for each objective resulting in the limitation of the available choices and the need for multiple runs [20]. In engineering problems, subjective and unpredictable weightings used in objective functions are the primary cause of a misleading solution because different sensitivities and unpredictable noise of different data sets lead to uncertainty in weighting. Thus, the Pareto optimality approach is an excellent way to obtain a set of possible solutions, including an optimum solution in objective function space, overcoming weighting, and combining [21].

The last approach, the multiobjective optimization method, finds a compromise solution by satisfying two or more objective functions simultaneously. This technique minimizes the voltage stability improvement alongside other competing objectives such as cost and loss minimization. An external repository is utilized to save all non-dominated optimal solutions during the process. Upon having the Pareto-optimal set of non-dominated solutions, a fuzzy decision-making technique is applied to sort out the best compromise solution to the decision-maker. In [4], a multiobjective optimization considering two indices, novel line stability index (NLSI) and critical boundary index (CBI), was performed for stressed system conditions. The analysis revealed that multiobjective VSC-OPF incorporating VSIs enhanced the stability by about 64.558% higher than the single-objective approach [22]. Furthermore, the cost and loss reduction in the VSC-OPF approach [4] was higher by 0.19% and 9.837%, respectively. Authors in [23] also solved a multiobjective OPF of a wind-thermal power system while incorporating the Voltage Stability Enhancement Index (VSEI). The addition of a stability index in multiobjective OPF improved the system stability by 20.477% higher than the single objective function problem of VSEI. There is also a cost and loss reduction of 0.32% and 2.59%, respectively, benefited from using the multiobjective OPF involving the addition of the VSEI. [24, 25] also implemented a multiobjective optimization using the L-index on the IEEE 30- and IEEE 57-bus systems. However, the analyses do not consider any change in the system operating conditions. The studies in this approach demonstrate a significant improvement in the stability and security of the system when VSIs are incorporated in the MO OPF problems. Additional benefits of loss and cost reduction are also achieved with this approach. However, the literature highlighted lacked a holistic justification for using line VSIs in the system. Additionally, no selection mechanism was provided for the different results from the several case studies, leaving the decision prone to human error as operators have to decide the best option for operating the system. This can lead to a compromise of the system's security and stability and eventual system collapse. More so, voltage stability is critical during system disturbances, yet the literature doesn't prioritize system stability improvement during such conditions. As a result, a more detailed analysis is still required to advise utilities on the ideal operating plan.

Therefore, this research proposes an efficient operational strategy for improving static voltage stability during different system conditions. The aim is to justify the significance of multiobjective voltage stability constrained optimization in maintaining system stability during system disturbances. The Multiobjective Particle Swarm Optimisation (MOPSO) algorithm is employed to minimize three objectives of generation cost, transmission loss, and the maximum voltage collapse proximity index (VCPI). To verify the proposed approach, the VSC-OPF is tested on two systems: IEEE 30-bus and IEEE 57-bus systems, under normal, contingency, and stressed operating scenarios. The results from single objective and multiobjective case studies are compared to justify the importance of the approach.

The key contributions of this work are as follows:

  • (i)

    Analysis of multiobjective function incorporating the Voltage Collapse Proximity Index for different system operating conditions

  • (ii)

    An evaluation of the impact of the system conditions on the static voltage stability performance considering generation cost and power loss

  • (iii)

    A ranking of results from the different case studies based on the Preference Selection Index

The advantages of this approach include a fast approximation of distance to collapse due to the use of the superior VCPI index [1, 3, 4] and, it is a time-saving technique for decision-makers as the Preference Selection Index provides a quick output of the best operating case study. However, the challenge remains on the limitation of the generator power outputs that would curtail the level of improvement achieved during system disturbances. Moreover, evaluating two or more objective functions is more complex than one. The proposed approach presented in Figure 1 is applicable in the Energy Control Center as a preventive control measure for possible voltage collapse [1].

Figure 1.

Figure 1

Block schematic of the proposed approach in a typical energy control center (ECC).

The rest of the article is classified into five sections: Section 2 introduces the problem formulation and constraints of the multiobjective optimization problem. Section 3 highlights the basic concepts of multiobjective optimization using the Multiobjective Particle Swarm Optimization Algorithm. Section 4 discusses the optimization results obtained and the system's performance in different operating conditions. Results from five case studies are analyzed here for both IEEE 30- and IEEE 57-bus systems. Finally, in Section 5, the deductions and implications from the simulation findings are presented.

2. Problem formulation

Multiobjective Optimal power flow (MO-OPF) problem is formulated using more than one objective function to find optimal control variables while simultaneously satisfying constraints. This study considers the minimization of three objective functions; fuel cost, voltage stability, and transmission loss [4]. The general multiobjective approach is formulated with the following primary objective function [26];

minimizef(x)={f1(x,u),f2(x,u),f3(x),,fNobj(x,u)} (1)

subject to

g(x,u)=0 (2)
h(x,u)0 (3)

where f, g, and h represent the objective function, equality and inequality constraints, respectively. The x vector represents state variables i.e., active power of the slack bus, load bus voltage magnitudes, reactive generator powers, and apparent power flows. x is expressed as in Eq. (4):

x=[Pgslack,Vd1,.,VdNd,Qg1,.,QgNs,Sl1,.,S1N1], (4)

where Pgslack represents the slack bus generator active power at the slack bus, Vd1 is the load bus voltage magnitude at bus i, Ng is the total number of generators, Sli is the branch i apparent power flow, and Nl is the total number of transmission lines/branches.

u is a vector of control variables consisting of active power generation (except on the slack bus), generator bus voltages, transformer tap ratios, and the reactive powers of shunt compensation capacitors, and is expressed as:

u=[Pgi,.,PgNd,Vg1,.,VgNs,T1,.,TNtran,Qc1,.,QcNcap], (5)

Where Pgi is the bus i active power generation, Vgi is the bus i generator bus voltage magnitude, Ntran is the total number of transformer taps, Qci is the bus i shunt compensation capacitor at i, and Ncap is the total number of compensation capacitors.

Multiobjective optimization is a technique built on the principle of Pareto dominance. Details of the Pareto dominance algorithm for optimal solution point sorting can be found in [27]. Figure 2 shows the Pareto optimal solutions based on the concept of nondominated sorting. The Pareto Front (or curve) is a set of nondominated solutions, being chosen as optimal if no objective can be improved without sacrificing at least one other objective.

Figure 2.

Figure 2

Non-dominated sorting of a population-based on Pareto Front.

2.1. Objective functions

In this study, three objective functions of the OPF, consisting of fuel cost, transmission line losses, and maximum value of the line VCPI are considered as detailed below.

2.1.1. Minimization of total fuel cost of generation

The objective here is to minimize the total fuel generation cost. The function is formulated as follows;

f1(x,u)=i=1ng(ai+biPgi+biPgi2) (6)

where fc(x) is the total fuel cost, ng is the number of generator buses; ai, bi and ci are the ith generator cost coefficients; and Pgi is the active power injection of the ith generator.

2.1.2. Minimization of loss

The objective of this function is to minimize transmission loss in MW. It is given by;

f2(x,u)=k=1NlineGk(Vi2+Vj22ViVjcos(θiθj)) (7)

where Gk is the conductance of the kth line. Vi and Vj are the voltage magnitude at the two ends of line k. θi and θj are the bus voltage angles at the two ends of line k.

2.1.3. Minimization of the maximum line VCPI

The Voltage Collapse Proximity Index (VCPI) is incorporated into the traditional OPF problem highlighted in Eq. (8). The static voltage stability margin improvement is based on VCPI is proposed as follows;

f3(x,u)=max(VCPIi) (8)

where VCPI is given by [3]:

VCPI(power)=PrPr(max) (9)
Pr(max)=Vs2Zcos4cos2((θ)/2) (10)

where =tan1(Qr/Pr)

The value of VCPI increases gradually with increasing power flow through a transmission line. When VCPI reaches the value 1, then voltage collapse occurs. The value of VCPI varies from 0 (no-load condition) to 1 (voltage collapse).

2.2. System constraints

In the OPF problem, there are two types of constraints to consider. Eqs. (11), (12), (13), (14), (15), (16), and (17) describe the system constraints to be handled.

2.2.1. Equality constraints

These include the power balance equations in the network;

PgiPdi=Vij=1NVj(Gijcosθij+Bijsinθij)i=1,,N (11)
QgiQdi=Vij=1NVj(Gijsinθij+Bijcosθij)i=1,...,N (12)

where Pgi and Qgi are the generated active and reactive powers at the i th generator. Pdi and Qgi are the real and reactive power loads at bus i. Vi and Vj are the voltage magnitude at buses i and j. Gij and Bij denotes line conductance and susceptance between buses i and j, respectively. θij is the phase angle difference between buses i and j. N represents the total system buses.

2.2.2. Inequality constraints

The inequality constraints to be considered are as follows:

Generator limits:

PgiminPgiPgimax,i=1,...,Ng (13)
QgiminQgiQgimax,i=1,...,Ng (14)
VgiminVgiVgimax,i=1,...,Ng (15)

Transmission line limits:

|SLi|SLimax, (16)

Load bus voltage magnitude limits:

VdiminVdiVdimax,i=1,,Nd (17)

where Pgimin is the minimum active power generation, Pgimax the maximum active power generations at bus. Qgimin and Qgimax are the minimal and maximum reactive powers generations at bus i. Vgimin and Vgimax are the lower and upper limit of generator voltage magnitudes at bus i. SLi and SLimax denote the apparent power flow and its maximum value at branch i. Vdimin and Vdimax are the lower and upper limit load voltages at bus i.

2.3. Constraint handling

Satisfying the equality constraints is guaranteed by running Newton Raphson power flow equations. The inequality constraints are guaranteed through self-restriction of the control variables within predefined boundaries. An extra term called the penalty function that combines all the inequality constraints is added to the primary cost function. In this study, quadratic constraints handling will be used to generate an augmented fitness function of the form [1];

Jx,u=fx,u+KPPgslack-Pgslacklim2+KVi=1Nload(Vdi-Vdilim)2+KQi=1Nline(Qgi-Qgilim)2+KSi=1Nline(SLi-SLilim)2 (18)

where J (x,u) is the penalized objective function; Kp, KQ, KV, and Ks are the penalty factors. The original objective function f (x,u) is altered if the solution x is infeasible. Pgslacklim, Qgilim, Vdilim and SLilim are the limit values associated with generator active power, reactive power, load bus voltage, and apparent power. The constraint violations of the state variables are shown in Eqs. (19), (20), (21), and (22).

Pgslacklim={Pgslackmax,ifPgslack>PgslackmaxPgslack,ifVdimin<Pgslack<PgslackmaxPgslackmin,ifPgslack<Pgslackmin (19)
Qgilim={Qgimax,ifQgi>QgimaxQgi,ifQgimin<Qgi<QgimaxQgimin,ifQgi<Qgimin (20)
Vdilim={Vdimax,ifVdi>VdimaxVdi,ifVdimin<Vdi<VdimaxVdimin,ifVdi<Vdimin (21)
SLilim=SLimaxifSLi>SLimax (22)

The penalty function outputs very high values when the real or active power is outside the allowable range; hence the algorithm moves the active and reactive powers in the permissible limits to avoid a high penalty value.

3. Computational algorithm and procedure

3.1. Multiobjective particle swarm optimization (MOPSO) algorithm

This study's optimization algorithm used to solve the Voltage Stability Constrained OPF is the MOPSO algorithm. It is used to solve the weighting factors problem encountered in PSO by uniting "Pareto-dominance principles" with PSO. The MOPSO approach employed in this work is described in [27, 28]. All of the non-dominated particles in the swarm are gathered into a sub-swarm called Repository, and every particle chooses its global best target among members of this Repository, as highlighted in Figure 3. Like PSO, particles in MOPSO share information and move towards global best particles and their own personal (local) best memory. Using the local best Xj(t) and the global best Xj(t) of each particle, ),j=1,...,n, the jth particle velocity in the kth dimension is updated according to Eq. (23). The position is updated according to Eq. (24).

vj,kt=wtvj,kt1+c1r1xj,kt1xj,kt1+c2r2xj,kt1xj,k(t-1) (23)
xj,k(t)=vj,k(t)+xj,k(t1) (24)

where vj,k(t) represents the velocity of particle j at iteration t. c1 and c1 are positive constants and r1 and r1 are uniformly distributed random numbers in [0,1]. xj,k(t) is the position of particle j at iteration t.

Figure 3.

Figure 3

MOPSO algorithm procedure.

3.2. Best compromise solution (BCS)

Fuzzy set theory has been commonly used to efficiently choose a candidate Pareto-optimal solution among the many possible solutions on the Pareto front. Due to the nature of the decision maker's irrationality, the ith objective function of a solution in the Pareto-optimal set, Fi, is represented by a membership function μi defined as [29]:

μi={1,FiFimin,FimaxFiFimaxFimin,FiminFiFimax,0,FiFimax (25)

where Fimax and Fimin are maximum and minimum values of the ith objective function, respectively.

For each non-dominated solution k, the normalized membership function μk is calculated as:

μk=i=1Nobjμikj=1Mi=1Nobjμij (26)

The number of nondominated solutions is M. The best compromise solution is the one having the highest value of μk. Arranging all solutions in descending order according to their membership function will provide the decision-maker with a priority list of nondominated solutions. This will guide the decision-maker, given the current operating conditions.

4. Results and discussion

The study investigates the system's performance in three operating scenarios when voltage stability is incorporated in the conventional OPF problem. The goal is to improve static voltage stability while meeting other objectives such as generation cost and loss reduction. Two test systems, IEEE 30-bus, and IEEE-57 bus were used to investigate the effectiveness of VSC-OPF on different cases studies of the multiobjective problem. The test system data is detailed as follows:

  • (i)

    IEEE 30-bus, shown in Figure 4(a) consists of 30 buses, 6 generators, 41 branches, and 4 transformers. The generators are located at Bus 1, 2, 5, 8, 11, and 13, while transformers are at lines 6–9, 6–10, 4–12, and 27–28. The total connected load is 283.4MW and 126.2MVAR. The detailed data was taken from [30].

  • (ii)

    IEEE 57-bus test system includes 57 buses, 7 generators, 80 branches, and 15 transformers. The generators are located at buses 1, 2, 3, 6, 8, 9, and 12. The total active and reactive loads are 1250.8MW and 336.4MVAR, respectively. The data was obtained from [31]. The typical single-line diagram is presented in Figure 4(b).

Figure 4.

Figure 4

Single line diagram of the: (a)IEEE 30-bus system (b) IEEE 57-bus system.

Tables 1 and 2 show the generator cost functions for IEEE 30-bus and 57-bus respectively.

Table 1.

IEEE 30-bus generator cost coefficients.

Gen Bus a b c Pmin Pmax
1 1 0.00375 2.00 0 50 200
2 2 0.01750 1.75 0 20 80
3 5 0.06250 1.00 0 15 50
4 8 0.00834 3.25 0 10 35
5 11 0.02500 3.00 0 10 30
6 13 0.02500 3.00 0 12 40

Table 2.

IEEE 57-bus generator cost coefficients.

Gen Bus a b c Pmin Pmax
1 1 0.0776 20 0 0 575.88
2 2 0.0100 40 0 0 100
3 3 0.2500 20 0 0 140
4 6 0.0100 40 0 0 100
5 8 0.0222 20 0 0 550
6 9 0.0100 40 0 0 100
7 12 0.032258 20 0 0 410

MATPOWER toolbox in MATLAB was utilized for all power flow and continuation power flow analyses performed in this study. Five case studies were used to evaluate the network's performance under various scenarios. The intention is to demonstrate how the system performs when different generation cost, voltage stability, and loss objectives are considered. The best-case is obtained using the Preference Selection index (PSI). The mathematical formulations of PSI are provided in [32]. The results obtained from Best Compromise Solutions (BCS) obtained under the multiobjective studies are used to further assess the corresponding system voltage, loss, and voltage stability performance. The summary of case studies used in the comparison is as follows:

  • (i)

    Base Case: This case evaluates the system when the power outputs are not optimized. The system is operated with active and reactive powers, as presented in Tables 1 and 2.

  • (ii)

    Case 0: This case utilizes the inbuilt MATPOWER Interior Point Solver for the optimal power flow problem. It is a single objective optimal power flow considering conventional OPF cost function.

  • (iii)

    Case 1: This is a multiobjective optimization considering two objective functions of generation cost and power loss.

  • (iv)

    Case 2: This is the second multiobjective problem for two objectives of generation cost and the maximum value of the line Voltage Collapse Proximity Index minimization.

  • (v)

    Case 3: This combines all the three objective functions: generation cost, power loss, and the maximum value of the line Voltage Collapse Proximity Index.

The listed case studies were performed for the system in three main operating scenarios described below;

  • (i)

    Scenario SC-1: This is the system in normal operating conditions. IEEE 30-bus is operated with load demands of 283.4MW and 126.2MVAR, while IEEE 57-bus has active and reactive loads of 1250.8MW and 336.4MVAR. The total generation is also presented in [30] and [31] for IEEE 30-bus and IEEE 57-bus, respectively.

  • (ii)

    Scenario SC-2: This simulates the system in line outage contingency conditions. A ranking of line contingencies based on the line VCPI was performed to simulate this scenario. This is used to identify the system's most critical line. For IEEE 30-bus, Line 1–2, which had the maximum VCPI of 1.3525, was considered for line outage. For the IEEE 57-bus system, Line 8–9 emerged with the maximum VCPI of 1.4989 and therefore, was also considered for line outage.

  • (iii)

    Scenario SC-3: This is the system in stressed conditions. Firstly, the maximum loading was obtained for each system using Continuation Power Flow (CPF) analysis. Then, the load demand was increased to close or beyond the normal operating point to simulate the effects of sudden load increase as in the case of faults. The system load on the IEEE 30-bus was increased by 1.4 as indicated in Table 3, similar to [4]. For IEEE 57-bus, the load was increased to 1375.88MW (1.1 times the base load). The purpose was to simulate two systems in which the level of load increase differs and thus, comprehensively evaluate the impact of voltage stability improvement after that.

Table 3.

Summary of all case studies and scenarios conducted.

Scenarios (SC) Details Base Case 0 Case 1 Case 2 Case 3
IEEE 30-bus
SC-1: Normal operating conditions Base load conditions Load demand = 283.4 MW and 126.2 MVAR Cost
Loss
VCPI
SC-2: System under contingency conditions Maximum VCPI is 1.3525 on Line 1–2. Hence, this line is put out of service Cost
Loss
VCPI
SC-3: System under stressed conditions Maximum loadability = 1.3057 p.u..p2pLoad demand increased by 1.4 times. New load = 403.8MW and 179.8MVAR Cost
Loss
VCPI
IEEE 57-bus
SC-1: Normal operating conditions Base load conditions Load demand = 1250.8MW and 336.4MVAR Cost
Loss
VCPI
SC-2: System under contingency conditions Maximum VCPI is 1.4989 on Line 8–9. Hence, This line is put out of service Cost
Loss
VCPI
SC-3: System under stressed conditions Maximum loadability = 0.7153 p.u..p2pLoad demand increased by 1.1 times. New load = 1375.88 MW and 370.04 MVAR Cost
Loss
VCPI

A summary of all case studies and scenarios considered in this work is presented in Table 3.

The system control variables considered are generator active and reactive power outputs, generator and load bus voltages.

4.1. Multiobjective optimization

This subsection presents the details of the system performance under the multiobjective case studies (Case 1–3) for multiobjective OPF. The Best Compromise Solutions obtained from the pareto fronts have been presented in bold in Tables 4, 6 and 8.

Table 4.

IEEE 30-bus summary results for individual best and BCS for Case 1.

Case 1
Parameter SC-1 SC-2 SC-3
Individual optimization
Best Cost ($/hr.) 802.39 840.13 1,285.10
Best Loss (MW) 3.58 4.20 13.10
Best Compromise Solution
Best Cost ($/hr.) 841.95 868.45 1,300.00
Best Loss (MW) 5.54 8.86 15.60
Pgen (MW) 288.94 292.26 419.15
Qgen (MVAR) 90.13 107.88 183.48
VCPI (max) 0.3113 0.7545 1.1100
VCPI (sum) 4.1512 5.1728 8.1998

Table 6.

IEEE 57-bus summary results for individual best and BCS for Case 1.

Case 1
Parameter SC-1 SC-2 SC-3
Individual optimization
Best Cost ($/hr.) 41,853.00 42,944.00 47,387
Best Loss (MW) 13.00 18.00 18.00
Best Compromise Solution
Best Cost ($/hr.) 42,795.00 43,912.00 48,024.11
Best Loss (MW) 13.37 21.00 19.62
Pgen (MW) 1265.17 1265.02 1395.50
Qgen (MVAR) 166.63 176.11 202.26
VCPI (max) 0.9997 1.0339 1.3687
VCPI (sum) 12.7856 12.7281 14.4946

Table 8.

IEEE 30-bus summary results for individual best and BCS for Case 2.

Case 2
Parameter SC-1 SC-2 SC-3
Individual optimization
Best Cost ($/hr.) 802.92 840.65 1,288.30
Best VCPI(max) 0.3058 0.4091 0.9000
Best Compromise Solution
Best Cost ($/hr.) 860.16 868.91 1,309.10
Best VCPImax 0.4450 0.7774 1.0200
VCPI (sum) 4.7968 5.2159 8.6677
Pgen (MW) 288.93 292.37 421.68
Qgen (MVAR) 90.20 107.98 192.91
Loss (MW) 5.53 8.97 17.88

4.1.1. Case 1

In this case, the aim is to minimize two objective functions: generation cost in $/hr. and transmission loss in MW. Figure 5(a) depicts the Pareto optimum solutions for all three scenarios SC-1, SC-2, and SC-3 for the IEEE 30-bus system and Figure 6(a) for the IEEE 57-bus system. Additionally, the BCS from each Pareto group of solutions is highlighted in a red star. As demonstrated in Eqs. (25) and (26), the BCS was derived from the Fuzzy Decision Making (FDM) theory.

Figure 5.

Figure 5

IEEE 30-bus system pareto optimal solutions for: (a) Case 1 (b) Case 2 (c) Case 3.

Figure 6.

Figure 6

IEEE 57-bus system pareto optimal solutions for: (a) Case 1 (b) Case 21 (c) Case 3.1.

The BCS value for SC-1 for IEEE 30-bus was 841.95$/hr for generating cost and 5.54MW for transmission loss. The VCPI(max) stability index for this case was 0.3113, suggesting a steady operating condition. The cost rises to 868.45$/hr since the generation is increased to 292.26MW in contingency conditions (SC-2). The loss and VCPI(max) increase to 8.86MW and 0.7545, respectively, due to an increase in line losses induced by the loss of Line 1–2. However, the system's stability is preserved. The maximum generation costs, losses, and voltage stability index occur when the system is stressed (Cost: 1300.00$/hr, Loss: 15.60MW, and VCPI(max): 1.11). Because 1.11 is over the voltage collapse point of 1, the system may experience voltage collapse under higher load situations. Table 4 shows a comparison of Best Compromise Solutions to the best individual values. As demonstrated in Table 5, the results achieved here are comparable to those published in other recent investigations.

Table 5.

Comparison of IEEE 30-bus BCS for Case 1 SC-1 results.

Algorithm Population Size Iterations Power Loss (MW) Fuel Cost ($/h)
MOPSO 50 100 5.5436 841.9512
MOPSO [33] 100 500 4.9785 843.63
PSO [34] 20 200 6.12 850.01
MODA [35] 100 100 4.8143 849.3526
NSGA II [36] 100 300 5.3483 833.5363
MOMICA [37] 120 500 4.5603 848.0544
MOFA-PFA [38] 100 300 4.6727 845.01
MOEA/D [33] 100 500 4.9099 835.36
MOGA [39] 100 300 5.6482 841.05
MOABC/D [40] 100 1000 5.2451 827.636

Case 1 of the IEEE 57-bus study shows a similar pattern to the 30-bus. Figure 6(a) demonstrates that when the operating scenario conditions vary from normal (SC-1) to contingency (SC-2) to stressed (SC-3) conditions, the generation cost, power loss, and VCPI(max) all increase. Table 6 summarizes the findings of this Case study. Individual optimization still has the lowest generation cost and loss than multiobjective optimization. The BCS estimates a generating cost of 42,795 dollars per hour and a power loss of 13.37 MW. In SC-1, this corresponds to a VCPI(max) of 0.9997, near the stability limit. As seen in Figure 18, the SC-2 and SC-3 stability limitations are beyond the critical point. Table 7 compares and contrasts the findings of this study with those of prior studies. MOPSO performs comparably to the five other algorithms mentioned.

Figure 18.

Figure 18

IEEE 57-bus voltage stability performance for different scenarios by: (a) VCPI(max) (b)VCPI(sum).

Table 7.

Comparison of IEEE 57-bus BCS for Case 1 SC-1 results.

Algorithm Population Size Iterations Power Loss (MW) Fuel Cost ($/h)
MOPSO 50 100 13.37 42,795
APFPA [41] 30 100 12.1513 43,486
MOCS [42] 100 300 11.99 42,176
MODA [35] 100 300 16.2646 41,903
HFBA-COFS [43] 100 300 10.6995 42,122
NSGA-II [43] 100 500 11.129 42,125
DA [44] 40 300 13.6065 42,584

4.1.2. Case 2

The objective functions in this case study are reduction of generation cost and VCPI(max). All scenarios are considered for analysis for IEEE 30-bus and 57-bus systems, as shown in Figures 5(b) and 6(b). Tables 8 and 10 show the best compromise solutions generated from the Pareto fronts for 30-bus and 57-bus networks, respectively.

Table 10.

IEEE 57-bus summary results for individual best and BCS for Case 2.

Case 2
Parameter SC-1 SC-2 SC-3
Individual optimization
Best Cost ($/hr.) 41,738 41,754 47,371
Best VCPI(max) 1.025 0.724 1.365
Best Compromise Solution
Best Cost ($/hr.) 41,856.00 43,297.01 47,868.16
Best VCPI(max) 1.4658 0.8596 1.4229
VCPI (sum) 13.7839 14.0564 14.6862
Pgen (MW) 1269.61 1271.81 1396.06
Qgen (MVAR) 174.97 190.78 202.77
Loss (MW) 17.61 20.01 20.18

When cost and VCPI(max) are considered objective functions, the findings for IEEE 30-bus in Table 8 show a total generation cost of 860.16 $/hr for SC-1, compared to 841.95$/hr for Case 1. The addition of VCPI(max) does not really enhance the system's voltage stability and loss performance.

Table 9 compares the BCS obtained in this work compared to those reported in the literature stated. It can be well observed that L-index provides the lowest values of stability index and highest losses and hence is not efficient in the fast prediction of voltage collapse. VCPI proves to be a superior collapse index.

Table 9.

Comparison of IEEE 30-bus BCS for Case 2 SC-1.

Algorithm Stability Index Fuel Cost ($/h) Power Loss (MW) Max of Index Sum of Index
MOPSO VCPI 860.1559 5.53 0.445 4.7968
WEA [45] L-index 847.331 9.3141 0.1099 -
Mjaya [46] L-index 801.0117 8.7715 0.12485 -
MSA [24] L-index 804.4838 9.9486 0.13917 -

As shown in Table 10 and Figure 6(b), case 2 performance for IEEE 57-bus results in a compromise generation cost of 41,856 $/hr. for SC-1, 43,297 $/hr. for SC-2, and the highest value of 47,868 $/hr. for SC-3 conditions. The VCPI(max) values are 1.466, 0.860, and 1.745, respectively. Table 10 shows the results for loss performance and comparisons to individual best values. Table 11 compares the results obtained in this study to those obtained in prior studies. The VCPI index continues to indicate an imminent collapse quicker than all other indices, including the LVSI and L-index.

Table 11.

Comparison of IEEE 57-bus BCS for Case 2 SC-1.

Algorithm Stability Index Fuel Cost ($/h) Power Loss (MW) Max of Index Sum of Index
MOPSO VCPI 41,856 17.613 1.4658 13.7839
MOPSO [25] L-index 41,607 13.3730 0.2018 -
Jaya [47] L-index 43,684 12.912 0.2302 -
DA [44] L-index 42,584 13.6065 0.2638 -
DA-PSO [1] LVSI 41,828 16.63 0.8731 13.82

4.1.3. Case 3

Case 3 examines the system's performance while considering all of the generating cost, power loss, and VCPI(max) objectives. Figures 5(c) and 6(c) show the Pareto fronts for the three operational scenarios for IEEE 30- and 57-buses, respectively.

IEEE 30-bus performance under normal operating conditions shows a generating cost of 903.93 $/hr, a power loss of 4.42 $/hr, and a VCPI(max) of 0.3502. Case 3 findings indicate an increase in generation cost while loss and VCPI(max) decrease in all operating conditions SC-1, SC-2, and SC-3 (see Table 12).

Table 12.

IEEE 30-bus summary results for individual best and BCS for Case 3.

Case 3
Parameter SC-1 SC-2 SC-3
Individual optimization
Best Cost ($/hr.) 802.96 840.09 1,285.50
Best Loss (MW) 3.51 4.31 13.10
Best VCPI(max) 0.31 0.42 0.90
Best Compromise Solution
Best Cost ($/hr.) 903.93 923.73 1,309.30
Best Loss (MW) 4.42 5.50 14.90
Best VCPI(max) 0.3502 0.5153 0.9840
VCPI (sum) 4.4019 4.5358 8.0510
Pgen (MW) 287.85 288.90 418.47
Qgen (MVAR) 86.24 96.16 181.02

Compared to cases 1 and 2, the tri-objective function for IEEE 57-bus shows a modest rise in cost in ​SC-1 and SC-2. Opposed to Case 2, the voltage stability improves significantly in Case 3, with the VCPI(max) falling to 0.9965 for SC-1, 0.792 for SC-2, and 1.1285 for SC-3. Case 3 also has the least amount of power loss when contrasted to Cases 1 and 2 (see Table 13).

Table 13.

IEEE 57-bus summary results for individual best and BCS for Case 3.

Case 3
Parameter SC-1 SC-2 SC-3
Individual optimization
Best Cost ($/hr.) 41,883.00 42,934.00 47,379
Best Loss (MW) 13.00 18.00 18.00
Best VCPI(max) 0.924 0.644 1.000
Best Compromise Solution
Best Cost ($/hr.) 42,830.00 46,374.13 49,510.29
Best Loss (MW) 13.20 18.58 18.74
Best VCPI(max) 0.9970 0.7920 1.1285
VCPI (sum) 12.1290 13.2320 14.0734
Pgen (MW) 1265.01 1269.38 1394.62
Qgen (MVAR) 166.31 181.23 197.94

4.2. System performance under different operating conditions

This section includes comparison studies between the case studies for each scenario considered. The purpose is to provide a general contrast in the system's performance when different objectives of generation cost, stability, and loss are considered. The obtained Best Compromise Solutions (BCS) obtained under the multiobjective studies are used to perform further system analyses in this section. For all scenarios, the best case obtained using the PSI has been made bold in Tables 14, 15, 16, 17, 18 and 19.

Table 14.

IEEE 30-bus summary results for different case studies under normal conditions (SC-1).

SC-1
Cases Total Cost ($/hr.) Total Pgen (MW) Total Qgen (MVAR) Ploss (MW) Power Loss (%) VCPI (max) VCPI (sum) PSI Rank
Base 875.283 300.96 133.93 17.56 6.20% 1.3525 7.5736 0.5997 5
Case 0 802.204 292.86 103.98 9.46 3.34% 0.9001 6.0016 0.7316 4
Case 1 841.951 287.18 84.25 5.54 1.96% 0.3113 4.1512 0.9450 2
Case 2 860.156 288.93 90.20 5.53 1.95% 0.4450 4.7968 0.8800 3
Case 3 903.926 287.85 86.24 4.42 1.56% 0.3502 4.4019 0.9562 1

Table 15.

IEEE 57-bus summary results for different case studies under normal conditions (SC-1).

SC-1
Cases Total Cost ($/hr.) Total Pgen (MW) Total Qgen (MVAR) Ploss (MW) Ploss (%) VCPI (max) VCPI (sum) PSI Rank
Base 61667.15 1288.962 253.833 27.864 2.23% 1.4990 16.8340 0.6747 5
Case 0 41737.79 1267.312 227.301 16.512 1.32% 1.5180 13.6890 0.8449 4
Case 1 42795.00 1265.170 166.630 13.365 1.07% 1.0000 12.7860 0.9850 2
Case 2 41856.00 1269.610 174.970 17.613 1.41% 1.4660 13.7840 0.8645 3
Case 3 42830.00 1265.010 166.310 13.199 1.06% 0.9970 12.1290 0.9963 1

Table 16.

IEEE 30-bus summary results for different case studies under Contingency Conditions (SC-2).

SC-2
Cases Total Cost ($/hr.) Total Pgen (MW) Total Qgen (MVAR) Ploss (MW) Ploss (%) VCPI (max) VCPI (sum) PSI Rank
Base 1052.68 344.03 292.11 60.63 21.39% 2.5781 10.4734 0.4602 5
Case 0 843.22 296.15 122.18 12.75 4.50% 1.0317 5.9958 0.7449 4
Case 1 868.45 292.26 107.88 8.86 3.13% 0.7545 5.1728 0.8380 2
Case 2 868.91 292.37 107.98 8.97 3.17% 0.7774 5.2159 0.8325 3
Case 3 923.73 288.90 96.16 5.50 1.94% 0.5153 4.5358 0.9839 1

Table 17.

IEEE 57-bus summary results for different case studies under Contingency Conditions (SC-2).

SC-2
Cases Total Cost ($/hr.) Total Pgen (MW) Total Qgen (MVAR) Ploss (MW) Ploss (%) VCPI (max) VCPI (sum) PSI Rank
Base 42964.86 1264.15 173.55 61.11 4.89% 1.7150 25.1667 0.6993 5
Case 0 42674.33 1281.16 239.11 30.36 2.43% 1.3651 17.0553 0.7738 4
Case 1 43912.00 1265.02 176.11 21.00 1.68% 1.0339 12.7281 0.9356 3
Case 2 43297.01 1271.81 190.78 20.01 1.60% 0.8596 14.0564 0.9423 2
Case 3 46374.13 1269.38 181.23 18.58 1.49% 0.7925 13.2322 0.9737 1

Table 18.

IEEE 30-bus summary results for different case studies under stressed conditions (SC-3).

SC-3
Cases Total Cost ($/hr.) Total Pgen (MW) Total Qgen (MVAR) Ploss (MW) Ploss (%) VCPI (max) VCPI (sum) PSI Rank
Base 1516.19 443.63 273.39 39.83 9.86% 2.3267 12.1116 0.62129 5
Case 0 1305.85 416.58 176.66 12.78 3.16% 0.9822 7.8038 0.99927 1
Case 1 1300.00 419.15 183.48 15.6 3.86% 1.1100 8.1998 0.92757 3
Case 2 1309.10 421.68 192.91 17.88 4.43% 1.0228 8.6677 0.89459 4
Case 3 1309.30 418.47 181.02 14.9 3.69% 0.9840 8.0510 0.95492 2

Table 19.

IEEE 57-bus summary results for different case studies under stressed conditions (SC-3).

SC-3
Cases Total Cost ($/hr.) Total Pgen (MW) Total Qgen (MVAR) Ploss (MW) Ploss (%) VCPI (max) VCPI (sum) PSI Rank
Base 65,906.23 1,417.28 250.49 41.401 3.01% 1.6587 20.5108 0.6747 5
Case 0 49,873.62 1,389.51 249.15 17.471 1.27% 1.0000 13.8159 0.9628 1
Case 1 48,024.11 1,395.50 202.26 19.618 1.43% 1.3687 14.4946 0.9229 3
Case 2 47,868.16 1,396.06 202.77 20.181 1.47% 1.4229 14.6862 0.9109 4
Case 3 49,510.29 1,394.62 197.94 18.742 1.36% 1.1285 14.0734 0.9585 2

Contingency conditions alter the system configuration, making it more unstable and insecure. As stated earlier, the contingency ranking was obtained from the maximum value of the line VSI. On the other hand, sudden increased load conditions create stressed system conditions. In such scenarios, the reactive power demand is highest. Consequently, the system is forced to operate close to or beyond stability limits.

4.2.1. Scenario SC-1 (normal operating conditions)

4.2.1.1. IEEE 30-bus

Under this scenario, the system is operated in normal conditions as presented in Table 14 and Figure 7. As expected, the lowest costs (802.20$/hr.) are encountered in the single-objective optimization since only one objective function is minimized. The addition of voltage stability increases costs in Case 2 and 3 since active power outputs from the generators are being increased to ensure system stability. Case 3 costs (903.926 $/hr.) are highest because the highest active power increase of 118.95% (from 11.36MW for Case 0–24.86MW in Case 3) is encountered at bus 13, which is the most expensive generator. Regarding voltage stability, Case 1 encounters the lowest VCPI index of 0.3113, although this comes at a slightly higher power loss. Multiobjective optimization of the three objectives simultaneously offers the most optimal variable outputs in cost, loss, and voltage stability, hence the highest PSI index of 0.9562.

Figure 7.

Figure 7

IEEE 30-bus SC-1 summary of system performance.

Using the VSI as a single objective function in [1] yielded a much higher cost of 971.55 $/h compared to the 903.926 $/hr. obtained for the best case in Table 14. Additionally, the power loss obtained in Table 14 (4.42 MW) is still lower than the reported value of 4.7236 MW in [1]. Therefore, multiobjective VSC-OPF has proven more efficient for the system operation of the IEEE 30-bus in normal operating conditions.

4.2.1.2. IEEE 57-bus

A considerable cost reduction of 32.32% is realized when only the generation cost function is minimized as in Case 0, as shown in Table 15 and Figure 8. Voltage stability is compromised in this case, as stability is not a priority in the goals. Thus, in Case 0, the system is doomed to collapse due to the VCPI(max) value of 1.5180, which is more than the collapse point of 1. Case 2, which emphasizes cost and VCPI minimization, is also at risk of collapsing because the system loss, which is not prioritized in the objectives, eventually compromises generator outputs, causing the system to become unstable. Hence its VCPI(max) of 1.4660. However, a stable voltage condition in this system is still realized when the three functions of cost, loss, and voltage stability are all optimized at once. This is illustrated with Case 3, with a voltage stability index of 0.9970. The lowest losses of 13.199MW (1.06%) are still realized with this case study since the loss is also prioritized. Hence, the system outputs are increased to ensure loss minimization and a stable voltage system. Case 3 is the preferred case with the highest PSI of 0.9963.

Figure 8.

Figure 8

IEEE 57-bus SC-1 summary of system performance.

These results are similar to those obtained in [1], where 44,054.27 $/hr cost. was obtained using the LVSI index. Similarly, the single objective optimization of the LVSI index summation yielded a voltage stability improvement of 7.55% compared to the 34.32% obtained in the multiobjective Case 3 (using Case 0 for comparison). Using the multiobjective optimization also has the advantage of a lower cost of 42,830.00 $/hr. and power loss of 13.199MW compared to the 13.55MW in [1].

4.2.2. Scenario SC-2 (contingency conditions)

4.2.2.1. IEEE 30-bus

With Line 1–2 out of service on IEEE 30-bus, the generated active power at Generator 1 increases by 16.50% (from 260.96 MW to 304.03MW). The reactive power also generated significantly increases (118.11%) to maintain bus voltages within allowable limits. The losses also significantly increase on Line 1–3 to 37.999 MW from 3.108MW due to overloading caused by loss of Line 1–2. All these factors culminate into an unstable system with the highest costs represented by the Base costs of 1052.68 $/hr., shown in Table 16 and Figure 9. Optimization of these parameters shows that the generator active powers can be minimized to a total generation of 288.9 MW with the lowest loss of 1.94%, as in Case 3. The system is also most stable in this case study, with a VCPI(max) of 0.5153. This implies that multiobjective optimization is significant in preventing possible system collapse under contingency conditions, as can be seen in the low values of VCPI(max) for Cases 1–3. Therefore, multiobjective optimization provides the most balanced system operation for the IEEE 30-bus under line outage contingency conditions optimally. This is validated under Case 3, with the highest PSI index of 0.9839.

Figure 9.

Figure 9

IEEE 30-bus SC-2 summary of system performance.

The optimized values for Case 3 are largely comparable to those obtained by [1]. The cost of 923.73 $/hr. is lower compared to the 972.72 $.hr. obtained in [1]. More so, the loss results in Case 3 (5.50 MW) are still lower than those obtained in the literature stated (5.21 MW). Whereas [1] used the minimization of LVSI sum as the objective function, the tri-objective optimization has proven superior in enhancing system operating conditions while assuring system security.

4.2.2.2. IEEE 57-bus

When Line 8–9 is put out of service for this scenario, the system active power generation increases to 1311.91 MW from 1278.66 MW. The increase mainly occurs at the generator on Bus 1. The reactive power also increases by 35.80% to maintain system bus voltage magnitudes. However, the system losses increase by 119.29% due to the strain imposed on lines 6–8 and 7–8. In these conditions, the system is prone to collapse, as evidenced by the VCPI(max) value of 1.7150, as shown in Table 17. However, optimizing the system parameters in this scenario shows that multiobjective case studies 2 and 3 can maintain system stability, as seen by the lower VCPI(max) values in Figure 10. The system loss can also be significantly reduced to about 1.49%, as realized in Case 3. Even though the highest generation costs are incurred in Case 3, the system can achieve the optimum operating condition in terms of costs, loss, and voltage stability. As such, Case 3 emerges as the best case to operate IEEE 57-bus in contingency conditions, hence the highest PSI of 0.9737. This is similar to the results presented in [1], where a slightly lower cost of 46,415.52 $/hr. was obtained from the minimization of the LVSI sum as the objective function. The losses obtained of 17.63 MW are also slightly lower than those obtained in Table 17. This confirms the robustness of the VCPI index in OPF problems.

Figure 10.

Figure 10

IEEE 57-bus SC-2 summary of system performance.

4.2.3. Scenario SC-3 (stressed conditions)

4.2.3.1. IEEE 30-bus

The active power rises to 443.63 MW in this scenario to handle the increased load. The generated reactive power also increases to 273.39 MVAR to provide voltage support to the reactive loads. In these conditions, the power loss is significantly high to about 9.86% due to the high need for reactive power and increased stress on the lines. The optimization of system parameters presented in Table 18 and Figure 11 indicates a significant reduction in generation costs due to optimizing generator active power outputs. The least active and reactive power requirements occur in Case 0. This also translates to the least losses and the most voltage stable condition. Hence, the single optimization case (case 0) is optimal to operate the IEEE 30-bus in stressed conditions. This can be attributed to the fact that the system needs to meet the required demand in such disturbance conditions. Hence utilities ought to focus on increasing the generation and reactive power needs. The voltage stability and loss objectives would be directly enhanced upon matching the supply to the demand.

Figure 11.

Figure 11

IEEE 30-bus SC-3 summary of system performance.

Consequently, multiobjective optimization may not be a priority when undergoing significant stress. It is important to note that the multiobjective results obtained in this scenario are similar to those obtained by Adewuyi et al. in [4]. The IEEE 30-bus assessed in stressed conditions using the Critical Boundary Index (CBI) revealed a total cost of 1310.90 $/hr. for Case 2 comparable to 1309.10$/hr. obtained in Table 18 using VCPI.

4.2.3.2. IEEE 57-bus

The system performance of the IEEE 57-bus in stressed conditions is indicated in Table 19. Figure 12 presents the variable comparisons. Using a factor of 1.1 p.u., the system significantly increased the system load, causing the power generation to increase to 1417.28 MW to meet the increased demand. These conditions also escalate the stress on the lines, increasing the losses by 48.58%. The active power generation is decreased from the base case by 1.96% for Case 0, 1.54% for Case 1, 1.50% for Case 2, and 1.60% for Case 3. All the optimization case studies also minimize transmission losses by 57.80%, 52.61%, 51.25%, and 54.73% lower than the base case for Case 0, Case 1, Case 2, and Case 3, respectively. Moreover, Cases 0, 1, 2, and 3 cost 24.33%, 27.13%, 27.37% and 24.88% lower than the base case, respectively. The VCPI(max) and VCPI(sum) values are also improved with the most voltage stable case in Case 0. According to the PSI ranking (0.9628), the single optimization case (Case 0) gives the best cost, active and reactive power generation, loss, and voltage stability. This is because in stressed conditions, such as fault scenarios, the system's active and reactive power demands are enormous. Therefore, the goal is to try as much as possible to meet the demand. Hence, the priority is the optimization of generator outputs. As in Cases 1–3, the addition of other objective functions does not necessarily improve the system condition.

Figure 12.

Figure 12

IEEE 57-bus SC-3 summary of system performance.

4.3. Impact on voltage stability

4.3.1. Bus voltage magnitude

It is good to mention that all bus voltage magnitudes are respected in all the scenarios and case studies, as shown in Figures 13, 14. MATPOWER lower and upper limits of 0.94 p.u. and 1.06 p.u. were maintained in all analyses. In normal operating conditions, IEEE 30-bus had the lowest voltage at Bus 30 (weakest bus) at 0.992 p.u. and highest at Bus 11 (1.082 p.u.). All optimization results provided bus voltages within acceptable ranges, as shown in Figure 13, with an average improvement of 0.11%, 0.99%, 0.17% in normal, contingency, and stressed conditions, respectively.

Figure 13.

Figure 13

IEEE 30-bus voltage magnitudes for: (a) SC-1 (b) SC-2 (c) SC-3.

Figure 14.

Figure 14

IEEE 57-bus voltage magnitudes for: (a) SC-1 (b) SC-2 (c) SC-3.

Similarly, for IEEE 57-bus, the lowest bus voltages were obtained at the weakest Bus 31 (0.936 p.u.) and highest at Bus 48 (1.06 p.u.) in normal operating conditions. Bus 31 voltage drops to 0.919 p.u. after the loss of Line 8–9, and to 0.892 p.u. in stressed conditions. Figure 14 shows that an average improvement of 0.330%, 0.992%, and 1.337% is realized in normal, contingency, and stressed conditions, respectively.

4.3.2. Maximum system loadability (PV curves)

The PV curves for the weakest buses all case studies and scenarios are shown in Figures 15 and 16 for IEEE 30-bus and IEEE 57-bus, respectively. In the normal conditions for IEEE 30-bus, Case 1 offers the largest loadability margin improvement of 10.41%, improving the stability margin by 3.56%, hence increasing the system security. During contingency conditions, the system loadability is lowest in the base case (0.172 p.u.). However, an improvement of over 610% is realized on average in all the cases, with the highest occurring in Case 3. The margin of the voltage stability is also improved by an average of 31.58% across Case 0–3. In stressed conditions, significant loadability margin enhancement of 10.67%, 11.67%,10.26%,11.81% for Case 0, Case 1, Case 2 and Case 3 respectively, is also achieved.

Figure 15.

Figure 15

IEEE 30-bus PV Curves for Bus 30 for scenarios: (a) SC-1 (b) SC-2 (c)SC-3.

Figure 16.

Figure 16

IEEE 57-bus PV Curves for Bus 31 for scenarios: (a) SC-1 (b) SC-2 (c)SC-3.

For the IEEE 57-bus system, the simulation results indicate a significant improvement in the voltage stability margin. During system disturbances, the system load margin increases up to a maximum of 7.31% (Case 3) and 40.46% (Case 0) for contingency and stressed conditions, respectively. The critical voltage also reduces by 1.42 % (Case 3) during the loss of Line 1–2, making the system more secure and stable for operation.

4.3.3. Minimization of the VCPI index

As discussed in sections 4.1 and 4.2, Figures 17 and 18 summarize the achieved voltage stability margin improvement by minimizing the Voltage Collapse Proximity Index. The figures show that the multiobjective optimization (Case 3) achieves the biggest VCPI improvement of 74.1% and 80.01% during normal and contingency conditions for the IEEE 30-bus. However, the single objective optimization (Case 0) alone can achieve the desired system voltage stability level during stressed conditions, improving it by 57.79%, in comparison to the base case. Similar improvement is achieved in the IEEE 57-bus, with Case 3 indicating VCPI reduction of up to 33.52% and 53.72% during normal and line outage conditions. Case 0 still achieves the most voltage stability improvement of 39.71% in stressed conditions.

Figure 17.

Figure 17

IEEE 30-bus voltage stability performance for different scenarios by: (a) VCPI(max) (b)VCPI(sum).

5. Conclusion

In this paper, a multiobjective voltage stability-constrained optimal power flow is presented. The approach proposed incorporated the Voltage Collapse Proximity Index (VCPI) in the conventional OPF problem to enhance the static voltage stability margin while simultaneously reducing system losses and generation cost. Minimization of generation cost, transmission power loss, and line VCPI are used to develop the multiobjective functions. Lower index values indicate greater improvements in voltage stability.

The standard IEEE 30-bus and 57-bus systems were employed to investigate the impact of different operating scenarios on the control variables. The Preference Selection Index indicated that the multiobjective function of minimizing generation cost, power loss, and VCPI(max) achieved the best-optimized generation cost, power loss, and voltage stability during normal and contingency conditions. The single optimization technique proved to be the most optimal and secure way of operating the system for stressed conditions. There is a significant demand for reactive power in these conditions as the generator reactive power outputs are all maxed out. Hence, a singular focus on one objective function would be more appropriate. Therefore, it is observed that the presented multiobjective optimization control approach can be considered an effective preventive measure for normal and line outage contingency conditions, thus preventing an imminent voltage collapse. Hence, the approach can be applied in Energy Control Centres to enhance system stability and security.

However, with stressed conditions such as faults in the system, the proposed multiobjective technique faces difficulty since the system still lacks enough reactive power support. It is recommended that for future studies, incorporating Flexible AC Transmission Systems (FACTS) in the VSC-OPF can be investigated to evaluate the operational efficiency of the system.

Declarations

Author contribution statement

Rebeccah Kyomugisha: Conceived and designed the experiments; Performed the experiments; Analyzed and interpreted the data; Contributed reagents, materials, analysis tools or data; Wrote the paper.

Christopher Maina Muriithi: Conceived and designed the experiments; Analyzed and interpreted the data; Contributed reagents, materials, analysis tools or data.

Milton Edimu: Analyzed and interpreted the data; Contributed reagents, materials, analysis tools or data.

Funding statement

This work was supported by the African Union Commission.

Data availability statement

Data included in article/supp. material/referenced in article.

Declaration of interests statement

The authors declare no conflict of interest.

Additional information

No additional information is available for this paper.

Footnotes

1

Please note the VCPI(max) figures were rounded off in the graph due to the 1e4 factor on the x-axis. For actual values, see Tables 6, 10, 13.

References

  • 1.Thasnas N., Siritaratiwat A. Implementation of static line voltage stability indices for improved static voltage stability margin. J. Electr. Comput. Eng. 2019;2019:2609235. [Google Scholar]
  • 2.Islam M.Z., et al. A harris hawks optimization based single- and multi-objective optimal power flow considering environmental emission. Sustainability. 2020;12(13) [Google Scholar]
  • 3.Khunkitti S., et al. A comparison of the effectiveness of voltage stability indices in an optimal power flow. IEEJ Trans. Electr. Electron. Eng. Dec. 2018;14 [Google Scholar]
  • 4.Adewuyi O.B., Howlader H.O.R., Olaniyi I.O., Konneh D.A., Senjyu T. Comparative analysis of a new VSC-optimal power flow formulation for power system security planning. Int. Trans. Electr. Energy Syst. Mar. 2020;30(3) [Google Scholar]
  • 5.Warid W. Optimal power flow using the AMTPG-Jaya algorithm. Appl. Soft Comput. 2020;91:106252. [Google Scholar]
  • 6.El-Fergany A.A., Hasanien H.M. Salp swarm optimizer to solve optimal power flow comprising voltage stability analysis. Neural Comput. Appl. 2020;32(9):5267–5283. [Google Scholar]
  • 7.Nasr M.-A., Nikkhah S., Gharehpetian G.B., Nasr-Azadani E., Hosseinian S.H. A multi-objective voltage stability constrained energy management system for isolated microgrids. Int. J. Electr. Power Energy Syst. 2020;117:105646. [Google Scholar]
  • 8.Manoz Kumar Reddy K., Kailasa Rao A., Srinivas Rao R. Optimal deployment of UPFC based on critical bus ranking using an effective PSO algorithm. Mater. Today Proc. Apr. 2021 [Google Scholar]
  • 9.Nascimento S., Gouvêa M.M. Multi-objective adaptive evolutionary algorithm to enhance voltage stability in power systems. Int. J. Control. Autom. Syst. Jul. 2021;19(7):2596–2610. [Google Scholar]
  • 10.Karimulla S., Ravi K. Solving multi objective power flow problem using enhanced sine cosine algorithm. Ain Shams Eng. J. 2021;12(4):3803–3817. [Google Scholar]
  • 11.Islam M.Z., et al. Marine predators algorithm for solving single-objective optimal power flow. PLoS One. Aug. 2021;16(8) doi: 10.1371/journal.pone.0256050. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 12.Daghan I.H., Gencoglu M.T., Özdemır M.T. 2021 18th International Multi-Conference on Systems, Signals & Devices. SSD); 2021. Chaos embedded particle swarm optimization technique for solving optimal power flow problem; pp. 725–731. [Google Scholar]
  • 13.Nou P., Zhang Y., Yang Y. The impact of voltage stability constraint L-index on power system optimization base on interior point Algorithm by considering the integration of renewable energy. J. Phys. Conf. Ser. Jun. 2021;1887(1):12031. [Google Scholar]
  • 14.Duman S., Li J., Wu L. AC optimal power flow with thermal–wind–solar–tidal systems using the symbiotic organisms search algorithm. IET Renew. Power Gener. Feb. 2021;15(2):278–296. [Google Scholar]
  • 15.Li S., Gong W., Hu C., Yan X., Wang L., Gu Q. Adaptive constraint differential evolution for optimal power flow. Energy. 2021;235:121362. [Google Scholar]
  • 16.Gupta S., Kumar N., Srivastava L. 2019. Bat Search Algorithm for Solving Multi-Objective Optimal Power Flow Problem BT - Applications of Computing, Automation and Wireless Systems in Electrical Engineering; pp. 347–362. [Google Scholar]
  • 17.Abdulrasool A.Q., Al-Bahrani L.T. 2021 12th International Symposium on Advanced Topics in Electrical Engineering. ATEE); 2021. Multi-objective constrained optimal power flow based on enhanced ant colony system Algorithm; pp. 1–5. [Google Scholar]
  • 18.Bouchekara H. Solution of the optimal power flow problem considering security constraints using an improved chaotic electromagnetic field optimization algorithm. Neural Comput. Appl. 2020;32(7):2683–2703. [Google Scholar]
  • 19.Gupta S., Kumar N., Srivastava L., Malik H., Anvari-Moghaddam A., García Márquez F.P. A robust optimization approach for optimal power flow solutions using rao algorithms. Energies. 2021;14(17) [Google Scholar]
  • 20.Khunkitti S., Siritaratiwat A., Premrudeepreechacharn S. Multi-objective optimal power flow problems based on slime mould algorithm. Sustainability. Jul. 2021;13(13):7448. [Google Scholar]
  • 21.Büyük E. Swarm Intelligence [Working Title] IntechOpen; 2021. Pareto-based multiobjective particle swarm optimization: examples in geophysical modeling. [Google Scholar]
  • 22.Khunkitti S., Premrudeepreechacharn S. 2020 International Conference on Power. Energy and Innovations (ICPEI); 2020. Voltage stability improvement using voltage stability index optimization; pp. 193–196. [Google Scholar]
  • 23.Salkuti S.R. Optimal power flow using multi-objective glowworm swarm optimization algorithm in a wind energy integrated power system. Int. J. Green Energy. Dec. 2019;16(15):1547–1561. [Google Scholar]
  • 24.Mohamed A.-A.A., Mohamed Y.S., El-Gaafary A.A.M., Hemeida A.M. Optimal power flow using moth swarm algorithm. Electr. Power Syst. Res. 2017;142:190–206. [Google Scholar]
  • 25.Khan A., Hizam H., Abdul Wahab N.I., Othman M.L. Solution of optimal power flow using non-dominated sorting multi objective based hybrid firefly and particle swarm optimization algorithm. Energies. Aug. 2020;13:4265. [Google Scholar]
  • 26.Chandrasekaran S. Multiobjective optimal power flow using interior search algorithm: a case study on a real-time electrical network. Comput. Intell. Mar. 2020;36 [Google Scholar]
  • 27.Coello C.A.C., Pulido G.T., Lechuga M.S. Handling multiple objectives with particle swarm optimization. IEEE Trans. Evol. Comput. 2004;8(3):256–279. [Google Scholar]
  • 28.Abido M.A. In: Multiobjective Particle Swarm Optimization for Optimal Power Flow Problem BT - Handbook of Swarm Intelligence: Concepts, Principles and Applications. Panigrahi B.K., Shi Y., Lim M.-H., editors. Springer Berlin Heidelberg; Berlin, Heidelberg: 2011. pp. 241–268. [Google Scholar]
  • 29.Hemamalini S., Simon S.P. 2010. Economic/Emission Load Dispatch Using Artificial Bee Colony Algorithm. [Google Scholar]
  • 30.The University of Washington Electrical Engineering Power system test case archive, the IEEE 30-bus test system data. https://labs.ece.uw.edu/pstca/pf30/pg_tca30bus.htm ".
  • 31.The University of Washington Electrical Engineering Power systems test case archive, 57 bus power flow test case. http://labs.ece.uw.edu/pstca/pf57/pg_tca57bus.htm
  • 32.Maniya K., Bhatt M.G. A selection of material using a novel type decision-making method: Preference selection index method. Mater. Des. 2010;31(4):1785–1789. [Google Scholar]
  • 33.Zhang J., Tang Q., Li P., Deng D., Chen Y. A modified MOEA/D approach to the solution of multi-objective optimal power flow problem. Appl. Soft Comput. 2016;47:494–514. [Google Scholar]
  • 34.Kahourzade S., Mahmoudi A., Bin Mokhlis H. A comparative study of multi-objective optimal power flow based on particle swarm, evolutionary programming, and genetic algorithm. Electr. Eng. 2015;97(1):1–12. [Google Scholar]
  • 35.Herbadji O., Slimani L., Bouktir T. 2017. Multi-objective Optimal Power Flow Considering the Fuel Cost, Emission, Voltage Deviation and Power Losses Using Multi-Objective Dragonfly Algorithm. [Google Scholar]
  • 36.Chen G., Qian J., Zhang Z., Li S. Application of modified pigeon-inspired optimization algorithm and constraint-objective sorting rule on multi-objective optimal power flow problem. Appl. Soft Comput. 2020;92:106321. [Google Scholar]
  • 37.Ghasemi M., Ghavidel S., Ghanbarian M.M., Gharibzadeh M., Azizi Vahed A. Multi-objective optimal power flow considering the cost, emission, voltage deviation and power losses using multi-objective modified imperialist competitive algorithm. Energy. 2014;78:276–289. [Google Scholar]
  • 38.Chen G., Yi X., Zhang Z., Lei H. Solving the multi-objective optimal power flow problem using the multi-objective firefly algorithm with a constraints-prior pareto-domination approach. Energies. 2018;11(12) [Google Scholar]
  • 39.Gupta S., Srivastava L. Dec. 2020. Application of Multi-Objective Genetic Algorithm for Solving Optimal Power Flow Problem. [Google Scholar]
  • 40.Medina M.A., Das S., Coello Coello C.A., Ramírez J.M. Decomposition-based modern metaheuristic algorithms for multi-objective optimal power flow – a comparative study. Eng. Appl. Artif. Intell. 2014;32:10–20. [Google Scholar]
  • 41.Mahdad B., Srairi K. Security constrained optimal power flow solution using new adaptive partitioning flower pollination algorithm. Appl. Soft Comput. 2016;46:501–522. [Google Scholar]
  • 42.Chen G., Qiu S., Zhang Z., Sun Z. Quasi-oppositional cuckoo search algorithm for multi-objective optimal power flow. IAENG Int. J. Comput. Sci. May 2018;45:255–266. [Google Scholar]
  • 43.Chen G., Qian J., Zhang Z., Sun Z. Multi-objective optimal power flow based on hybrid firefly-bat algorithm and constraints- prior object-fuzzy sorting strategy. IEEE Access. 2019;7:139726–139745. [Google Scholar]
  • 44.Gupta S., Kumar N., Srivastava L., Malik H., Pliego Marugán A., García Márquez F.P. A hybrid jaya–powell's pattern search algorithm for multi-objective optimal power flow incorporating distributed generation. Energies. 2021;14(10) [Google Scholar]
  • 45.Saha A., Das P., Chakraborty A.K. Water evaporation algorithm: a new metaheuristic algorithm towards the solution of optimal power flow. Eng. Sci. Technol. an Int. J. 2017;20(6):1540–1552. [Google Scholar]
  • 46.Warid W., Hizam H., Mariun N., Abdul Wahab N.I. A novel quasi-oppositional modified Jaya algorithm for multi-objective optimal power flow solution. Appl. Soft Comput. 2018;65:360–373. [Google Scholar]
  • 47.El-Sattar S.A., Kamel S., El Sehiemy R.A., Jurado F., Yu J. Single- and multi-objective optimal power flow frameworks using Jaya optimization technique. Neural Comput. Appl. 2019;31(12):8787–8806. [Google Scholar]

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Data Availability Statement

Data included in article/supp. material/referenced in article.


Articles from Heliyon are provided here courtesy of Elsevier