Abstract
In this work, we develop and study upper and lower one-sided EWMA control charts for monitoring correlated counts with finite range. Often in practice, data of that kind can be adequately described by a first-order binomial or beta-binomial autoregressive model. Especially, when there is evidence that data demonstrate extra-binomial variation, the latter model is preferable than the former. The proposed charts can be used for detecting upward or downward shifts in process mean level. Practical guidelines concerning the statistical design of the proposed charts are given, while the effect of the extra-binomial variation is investigated as well. Comparisons with existing control charting procedures are also provided. Finally, an illustrative real-data example is also given.
Keywords: Average run length, BAR(1) model, beta-BAR(1) model, extra binomial variation, rounding operation, s-EWMA chart, statistical process control
1. Introduction
The statistical process monitoring (SPM) methods consist of the basic tools of statistical process control (SPC). Among them, the control chart is the most widely used SPM tool. It can be used for the quick and accurate detection of abnormal (usually unwanted) situations. Traditionally, control charts are used in industry to monitor production processes. The basic aim is to detect a possible increase in the percentage of defective items, which is related to process deterioration. In this case, the Shewhart p and np charts (Montgomery [11]) are widely used to monitor the proportion and the number of nonconforming units, respectively, within a sample of finite size. These monitoring schemes are developed under the assumption that the number of nonconforming units follows a binomial distribution , where n is the sample size and π is the success probability (i.e. the probability for a unit to be nonconforming). Moreover, a common assumption when the p and np charts are applied in practice is that the successive counts are independent and identically distributed (iid) binomial random variables (rv).
It is well known that Shewhart control charts are not sensitive in the detection of small and medium shifts in the mean of the process (e.g. average number of defective items). The cumulative sum (CUSUM) and exponentially weighted moving average (EWMA) control charts, as control charts with memory, detect such changes more quickly than Shewhart charts (Montgomery [11]). In addition to the p and np charts, Gan [5], Gan [6], Chang and Gan [4], Wu et al. [28] and Yeh et al. [29] studied CUSUM and EWMA control charts for monitoring binomial counts. All the above-mentioned control charts are based on the assumption of iid binomial rv. Even though the iid assumption is a common assumption, observations on a process will be autocorrelated when the sampling rate is very high, which, in turn, commonly happens because of the technological progress in automated sampling [13]. Clearly, in a variety of real-life problems, the iid assumption is violated.
In that case, the previously mentioned control charts cannot be used because they demonstrate an increased false alarm rate (FAR). One solution to this problem is to select first an appropriate model of integer-valued time series, and then to develop control charts based on this model. In particular, if it is of interest to monitor the number X of defects in a sample of n objects, then there is a finite number of possible values for X. Therefore, the appropriate integer-valued time series model must be such that X takes a finite number of possible values. Consequently, an appropriate model for correlated binomial counts needs to be selected first.
The monitoring of correlated binomial counts has been considered by Weiß [20] who developed and studied Shewhart and Moving Average (MA) control charts for monitoring a process that is properly described by the first-order binomial autoregressive model (binomial AR(1) or BAR(1)) of McKenzie [10] and Al-Osh and Alzaid [1].
However, in various real-life problems, the counts in the sample are from a population that contains inhomogeneous units. This is, for example, the case of the monthly number of districts in an area that are infected by a specific virus (Weiß and Pollett [26], Ristić et al. [16]). Clearly, it is more realistic to assume that the probability of the occurrence of the virus is not the same across the districts due to differences attributed to structure, quality of life and economic status. Another case (see Weiß and Kim [25]) is the monthly number of country members of the Eurozone which demonstrate price stability (in terms of inflation rates). Again, it is more realistic to assume that all the country members do not have the same probability to achieve a monthly inflation rate below a specific limit, due to the structural differences of their economies.
In those cases, the fixed relation between the mean and variance of the binomial distribution is violated. This relation is expressed in terms of the binomial index of dispersion (see, e.g. [25]) which is defined for an rv with mean μ and variance as
and for the case of binomial distribution it is , for every . For finite-range count data rv satisfying , there is an indication that this rv shows extra-binomial variation (overdispersion with regard to the binomial distribution). Therefore, when extra-binomial variation is present, alternative models to the BAR(1) model must be considered and the necessary control charts should be designed under the assumption of these models.
A popular choice to that direction is the first-order beta-binomial autoregressive model (beta-binomial AR(1) or BBAR(1)), proposed by Weiß and Kim [25]. The BBAR(1) model is an adequate choice for practical applications in which heterogeneity is observed between the units. Upper and lower one-sided Shewhart and CUSUM control charts for monitoring a process that is properly described by a BBAR(1) process were proposed and studied by Rakitzis et al. [15].
Motivated by the work of Weiß [21], in this work, we propose and study upper and lower one-sided EWMA control charts for monitoring correlated counts that are described by a BAR(1) and a BBAR(1) model. The proposed chart can be considered as an alternative monitoring scheme to the CUSUM chart. The aim of this study is to investigate its statistical design as well as its performance in the detection of increasing and decreasing shifts in process mean level. Note also that Weiß [21] considered only the case of increases (upper one-sided charts). To the best of our knownledge, EWMA-type charts for monitoring BAR(1) and BBAR(1) processes have not been considered so far in the literature.
This paper is organized as follows. In Section 2, we present the essential properties of the BAR(1) ( Section 2.1) and BBAR(1) ( Section 2.1) models. Next, in Section 3 we present the upper and the lower one-sided EWMA charts for BAR(1) and BBAR(1) processes. Section 4 consists of the results of an extensive numerical study on the performance of the upper and lower one-sided EWMA control charts for monitoring BAR(1) and BBAR(1) processes. In Section 5, the practical application of the proposed schemes is illustrated via a real-data example. Finally, conclusion is summarized in Section 6.
2. Models of counts with finite range
2.1. The BAR(1) model
The BAR(1) model, proposed by McKenzie [10], is a simple model for autocorrelated processes of counts with a finite range. This model is based on the binomial thinning operator ‘○’, see [18]. More specifically, if X is a non-negative discrete rv and then, by using the binomial thinning operator, it is possible to define the rv , as an alternative to the usual multiplication . However, the result of will always be integer. The rv , , are iid Bernoulli rv with success probability α, independent also of the count data rv X. Therefore, the conditional distribution of , given X = x, is the binomial distribution . We will refer to a process , where , as a BAR(1) process if it is of the form
| (1) |
where , , and is fixed. The condition on ρ guarantees that . Moreover, all thinnings are performed independently of each other and the thinnings at time t are independent of , s<t, as well.
It is known (see, e.g. [20]) that the process , where , is a stationary Markov chain with marginal distribution . Clearly, the marginal mean and variance are, respectively, equal to
| (2) |
Moreover, the transition probabilities are
| (3) |
for .
The conditional mean and variance, respectively, are equal to (see Weiß [24])
| (4) |
while the autocorrelation function is given by for .
Parameters π and ρ of the BAR(1) model can be estimated via the method of Conditional Maximum Likelihood (CML), when time series data are available. Let us assume that , , is a segment from a stationary BAR(1) process. Then the conditional likelihood function equals
| (5) |
where the probabilities are given in Equation (3). There is no closed-form formula for the maximum likelihood (ML) estimators , of π, ρ and therefore, they are obtained by maximizing numerically the log-likelihood . The corresponding standard errors can be computed from the observed Fisher's Information matrix. Further details on the estimation of the parameters of a BAR(1) process are given in Weiß and Kim [24].
2.2. The BBAR(1) model
The Beta-binomial AR(1) model (BBAR(1)) is a simple and discrete model which can be used for correlated counts with a finite range. This model is appropriate for capturing the extra-binomial variation in the data as well as the heterogeneity among the n items. The BBAR(1) model is based on the concept of beta-binomial thinning, a generalization of the binomial thinning operation discussed previously.
Specifically, let be an rv which follows the beta distribution , where . The is independent of X. We will say that is obtained from X by beta-binomial thinning if the operator “○” is the binomial thinning operator, performed independently of X and . Hence, the distribution of the (conditional) rv , given X = x, is the beta-binomial distribution with probability mass function (pmf) given by
where is the beta function. Next, we present the BBAR(1) model, which has one additional model parameter , compared to the BAR(1) model. Further details and properties of the BBAR(1) model can be found in Weiß and Kim [25].
Similar to the case of the BAR(1) process, let , , fixed, and . We will refer to a process as the BBAR(1) process when it is defined by the recursion
| (6) |
where all , and all thinnings are performed independently of each other. Also , and the thinnings at time t are independent of , s<t.
The process is a homogeneous and ergodic Markov chain, with the one-step transition probability given by (for )
| (7) |
The corresponding conditional mean and variance are
| (8) |
| (9) |
while the stationary mean and variance are equal to
| (10) |
It is not difficult to realize that BAR(1) and BBAR(1) models have the same marginal mean μ while the marginal variance of BBAR(1) model is the usual binomial variance, multiplied by a factor , which determines the deviation of the true stationary variance from the binomial one. As , the .
It should be noted that there is not a closed-form expression for the stationary marginal distribution of for the BBAR(1) model. However, we can determine it numerically as follows: First, if the initial count follows the stationary marginal distribution, then the whole process becomes stationary. Therefore, the vector of the marginal probabilities , , is the solution of the equation , where is the transition probability matrix with conditional probability (given in Equation (7)) at the entry.
Similar to the case of BAR(1) process, when a segment , is available from a BBAR(1) process, the parameters π, ρ and φ can be estimated via the method of CML. The log-likelihood function, conditioned on , equals
where the transition probabilities are now given in (7). Again, the ML estimators , and of π, ρ and φ are obtained by maximizing numerically the . Further details on estimation methods for the parameters of a BBAR(1) model can be found in Weiß and Kim [25].
3. Methodology
In this section, we develop one-sided EWMA control charts for monitoring BAR(1) and BBAR(1) processes. The aim is to detect quickly and accurately a change in the mean level of the process. When the process is in-control (IC), we will denote it as while in the out-of-control state (OoC) it is denoted as . In a similar manner, the IC (OoC) parameter values of the BAR(1) model are denoted as and ( and ) while for the BBAR(1) model, the IC (OoC) parameter values are denoted as , and ( , and ).
In several applications, practitioners are interested in detecting increases in the process mean level, from an IC value to an OoC value . This is important because with this displacement, if X is the number of non-conforming items produced by a process, there is an increase on the average number of them. On the contrary, when there is a decrease in the mean level of the process, i.e. when , then less non-conforming items are produced, which is an indication of process improvement. In this work we consider both cases.
The exponentially weighted moving average (EWMA) control chart was introduced by Roberts [17]. For , the values of the following statistic are plotted on the chart
| (11) |
where λ is a smoothing parameter such that . For small values of λ less weight is given to the most recent observation and more weight is given to all the available observations since the beginning of process monitoring. This is a control chart with memory and it is more capable of than a Shewhart control chart in detecting shifts of small or medium magnitude in the mean level of the process. For , the EWMA chart coincides with the usual Shewhart chart.
Before proceeding with the presentation of EWMA charts for BAR(1) and BBAR(1) processes, it should be noted that a special characteristic of these processes is that the values of , are integers. Clearly, by applying (11) directly to the data from a BAR(1) or a BBAR(1) process, the values do not remain integers. In this case, the performance of the chart can only be calculated approximately, since (see, e.g. [19]) the range of the possible values for changes at each time t. Weiß [21] proposed and studied the upper one-sided s-EWMA control charts, for monitoring a first-order integer-valued Poisson autoregressive (PINAR(1)) process. Specifically, for s = 1, the EWMA chart statistic is given by
| (12) |
where the values remain integers and . Clearly, this is achieved by applying on the result of (11) the function of rounding the number x to the nearest integer, i.e. the , if-f . We will refer to this chart as the 1-EWMA, which gives an OoC signal when for the first time . The is an appropriate upper control limit. In a similar manner, for the lower one-sided 1-EWMA, with a lower control limit , an OoC signal is given when . It is also noteworthy that in the case of serial independence of binomial rv, the 1-EWMA chart coincides with the modified EWMA chart in Gan [6].
In order to evaluate the performance of 1-EWMA chart, it is necessary to determine its run length distribution, which is defined as the distribution of the rv . The rv L is defined as the number of points plotted on the chart until it gives for the first time an OoC signal. Since the possible values of the plotted statistic of the 1-EWMA chart are integers, by using the Markov chain method, it is possible to compute exactly the entire distribution of rv L. Note also that Gan [5] used the modified EWMA statistic in (12) in order to preserve the integer character of values (they are integers and the values remain integers, as well) and therefore, compute exactly the run length properties of the proposed chart. In addition, in an attempt to extend Gan's work, we investigate the performance of the modified EWMA statistic in the case of serially dependent binomial observations. The Markov chain method is very well documented in the related literature (see, e.g. Brook and Evans [2], Yontay et al. [30], Knoth [7], Weiß [21], Weiß [22] and references therein) and we do not provide further details about it. Here, we used the method as described in Weiß [21].
The expected value , also known as average run length (ARL), is the most common performance measure of a control chart. The ARL expresses the average number of points to be plotted on the chart until it gives for the first time an OoC signal. Following Rakitzis et al. [15] (see also Weiß [23]), in this work, the IC performance of the proposed schemes is evaluated in terms of the zero-state ARL (zsARL) which is the expected number of points plotted on the chart until the first (false) alarm is given. For an OoC process, the performance of the proposed schemes is evaluated in terms of the steady-state ARL (ssARL) which gives an approximation of the true mean delay for detection after a change in the process, from the IC state to the OoC state. We assume that a change in process happens at an (unknown) change-point . Specifically, for , the process is in the IC state while for , the process has shifted to the OoC state. Therefore, the ssARL expresses the expected number of points to be plotted on the chart until it gives for the first time an indication of an OoC process, given that the process has been operated for “sufficient time” in control. According to Weiß and Testik [27], the zsARL and the ssARL are substantially different in the case of monitoring processes with correlated counts.
The statistical design of the 1-EWMA (either for BAR(1) or BBAR(1) processes) requires the determination of the values for the design parameters, λ and . These values are generally different for different processes. We follow the steps below to design an upper one-sided 1-EWMA chart with the desired (see also [21]); the case of the lower one-sided 1-EWMA chart is treated in a similar manner (after some necessary but straightforward modifications) and, due to space economy, the details are omitted.
-
Step 1
We choose the IC values of the design parameters n, , (for BAR(1) process) or n, , , (for BBAR(1) process) and the desired in-control value for the zsARL.
-
Step 2
We choose an initial value for the such that the IC zsARL of the corresponding upper one-sided Shewhart chart is lower than the desired value .
-
Step 3
We decrease the value of to adjust the IC zsARL until we get a value as close as possible to the desired value . So it turns out the pair of the values ( .
The design procedure continues, by reducing further the initial value of and then searching again for the value of λ until the IC zsARL value attains a value as close as possible to the desired value . The decreases so that it is always . Clearly, there is at least one pair of values that satisfies the desired IC performance. Finally, among all the possible designs , it turns out the optimal pair of the values ( ) for the 1-EWMA chart, which satisfies the following two conditions: (i) its ARL performance is as close as possible to the desired value and (ii) it attains the minimum possible OoC ssARL value for a pre-defined OoC value . It should be mentioned that since it is not possible, because of the discrete nature of BAR(1) and BBAR(1) processes, to achieve exactly the desired IC performance, we applied the following criterion (see Castagliola et al. [3]) to consider a design as such that gives IC zsARL as close as possible to the desired value:
In a similar manner, the statistical design of the lower one-sided 1-EWMA chart requires the determination of the optimal pair such that the achieved IC zsARL is as close as possible to the desired value and the OoC ssARL value is the minimum possible for an OoC value .
It is worth mentioning that we may achieve a better approximation of the desired value by varying appropriately the starting value . However, in this work, we assume that so as not to give the Fast Initial Response feature [8] in the EWMA charts.
Apart from the 1-EWMA chart, Weiß [21] proposed also the s-EWMA chart, , where the values of the statistic
| (13) |
are plotted on the chart, for and . Likewise the case of 1-EWMA chart, we assume . The s−round function is defined as if-f and can be viewed as an extension of the usual rounding function, since it maps x to the nearest fraction with denominator s. In this way, the exact calculation of the run length distribution of s-EWMA chart remains feasible via the Markov chain method. Furthermore, the is a fractional operation rounding; by using larger s values, it is possible to correct the problem of oversmoothing that arises on the 1-EWMA chart, due to the rounding of the values, especially for low process mean level and small λ values. This adds more flexibility on the statistical design of the chart, especially when we are interested in determining the values for its design parameters, in order to achieve the desired IC performance.
Successive values of the statistic , are plotted on a chart with an upper control limit , that is, the process is considered as being IC unless an OoC signal is triggered, i.e. when . Note also that in the case of 1-EWMA chart, the . The statistical design of the s-EWMA chart requires the determination of three design parameters . We follow the steps below in order to design an upper one-sided s-EWMA chart with the desired IC performance (for more details, see also Weiß [21]).
-
Step 1
We choose the IC values of the process parameters n, , (for BAR(1) process) or n, , , for BBAR(1) process) and the desired IC value. Furthermore, we choose the value of .
-
Step 2
For the given s value, we start from the optimal pair of values , for the 1-EWMA chart, say , and modify such that the pair results in an upper one-sided s-EWMA chart with IC zsARL value lower than the desired value. The upper control limit is now .
-
Step 3
For the value obtained in Step 2, we search for a new λ value, say with , such that the s-EWMA chart with has an IC zsARL value as close as possible to the desired value. Hence, it turns out the triple ( ).
The design procedure continues, by applying the above steps for the remaining pairs of values ( ) that emerged during the study of the 1-EWMA control chart. Therefore, for the statistical design of the s-EWMA chart, the optimal triple ( ) that emerged, for different values of the s, are such that the IC zsARL is as close as possible to the desired value and it attains the minimum possible OoC ssARL value for a pre-defined OoC value . Again, we applied the same criterion as in the case of the statistical design of the 1-EWMA in order to pick up the designs ( ) that have an IC performance as close as possible to the desired value. The statistical design for the lower one-sided s-EWMA chart is similar to the upper one-sided case, after some direct but necessary modifications. The details are left to the readers.
Remark 3.1
Generally speaking, parameter s is actually another chart parameter, except for the λ and the control limit. According to Weiß [21], in order to avoid the oversmoothing of the EWMA values, which affects severely the ability of the chart in the detection of an OoC situation, s values that are larger than 1 are recommended. Weiß [21] considered as a good trade-off between oversmoothing and time-consuming computations (for large s and small λ values). Therefore, in this work, we determine the optimal design (values and or ) for s = 2 and for s = 4 and then, between them, we picked up the one that optimizes the detection ability of the chart, at the given shift in .
4. Numerical study
In this section, we present the results of an extensive numerical study on the performance of s-EWMA charts in the monitoring of BAR(1) and BBAR(1) processes. For the IC design parameters, we assume that , and . With , we denote the case of BAR(1) process. We also consider two different sample sizes . In addition, when the process is OoC, we assume that and and the presence of assignable causes of variation affects only the parameter , which changes from to , with (upward shifts) and (downward shifts), i.e. we want to detect 20 and 40 changes in the IC mean level of the process. These are the shifts of interest and we want to obtain the optimal charts for their detection. The desired value is 370.4.
Tables 1 and 2 consist of the optimal statistical design of the upper one-sided (Table 1) and the lower one-sided (Table 2) s-EWMA chart. The optimal values of the design parameters ( ) for the s-EWMA chart are given in the respective columns. Note also that is given in the form while .
Table 1. Design table for the upper one-sided s-EWMA charts.
| n | δ | s | zsARL | ssARL | n | δ | s | zsARL | ssARL | n | δ | s | zsARL | ssARL | ||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 0 | 5 | 15 | 0.25 | 1.2 | 4 | 0.15 | 27 | 27/4 | 348.08 | 30.06 | 0.025 | 5 | 15 | 0.25 | 1.2 | 4 | 0.61 | 37 | 37/4 | 361.06 | 65.50 | 0.05 | 5 | 15 | 0.25 | 1.2 | 4 | 0.53 | 37 | 37/4 | 398.44 | 71.91 |
| 1.4 | 4 | 0.15 | 27 | 27/4 | 348.08 | 10.44 | 1.4 | 4 | 0.61 | 37 | 37/4 | 361.06 | 19.40 | 1.4 | 4 | 0.53 | 37 | 37/4 | 398.44 | 21.34 | ||||||||||||
| 0.50 | 1.2 | 4 | 0.11 | 27 | 27/4 | 345.24 | 41.55 | 0.50 | 1.2 | 1 | 0.60 | 10 | 10 | 359.41 | 79.24 | 0.50 | 1.2 | 2 | 0.70 | 21 | 21/2 | 366.92 | 95.37 | |||||||||
| 1.4 | 4 | 0.11 | 27 | 27/4 | 345.24 | 15.62 | 1.4 | 1 | 0.60 | 10 | 10 | 359.41 | 26.65 | 1.4 | 2 | 0.70 | 21 | 21/2 | 366.92 | 34.03 | ||||||||||||
| 0.75 | 1.2 | 1 | 0.25 | 9 | 9 | 371.31 | 88.76 | 0.75 | 1.2 | 4 | 0.41 | 37 | 37/4 | 385.18 | 103.64 | 0.75 | 1.2 | 4 | 0.62 | 41 | 41/4 | 371.70 | 119.21 | |||||||||
| 1.4 | 1 | 0.25 | 9 | 9 | 371.31 | 34.03 | 1.4 | 4 | 0.41 | 37 | 37/4 | 385.18 | 41.16 | 1.4 | 4 | 0.62 | 41 | 41/4 | 371.70 | 50.74 | ||||||||||||
| 30 | 0.25 | 1.2 | 4 | 0.33 | 33 | 33/4 | 352.94 | 48.55 | 30 | 0.25 | 1.2 | 4 | 0.25 | 33 | 33/4 | 365.14 | 60.07 | 30 | 0.25 | 1.2 | 4 | 0.54 | 45 | 45/4 | 372.73 | 108.10 | ||||||
| 1.4 | 4 | 0.33 | 33 | 33/4 | 352.94 | 15.09 | 1.4 | 4 | 0.25 | 33 | 33/4 | 365.14 | 19.73 | 1.4 | 4 | 0.54 | 45 | 45/4 | 372.73 | 41.04 | ||||||||||||
| 0.50 | 1.2 | 1 | 0.12 | 7 | 7 | 379.56 | 67.34 | 0.50 | 1.2 | 2 | 0.31 | 19 | 19/2 | 372.13 | 88.46 | 0.50 | 1.2 | 4 | 0.62 | 49 | 49/4 | 379.84 | 132.89 | |||||||||
| 1.4 | 1 | 0.12 | 7 | 7 | 379.56 | 25.93 | 1.4 | 2 | 0.31 | 19 | 19/2 | 372.13 | 32.94 | 1.4 | 4 | 0.62 | 49 | 49/4 | 379.84 | 57.28 | ||||||||||||
| 0.75 | 1.2 | 2 | 0.08 | 14 | 14/2 | 374.46 | 81.85 | 0.75 | 1.2 | 4 | 0.59 | 45 | 45/4 | 371.75 | 130.84 | 0.75 | 1.2 | 4 | 0.58 | 49 | 49/4 | 369.66 | 150.91 | |||||||||
| 1.4 | 2 | 0.08 | 14 | 14/2 | 374.46 | 35.04 | 1.4 | 4 | 0.59 | 45 | 45/4 | 371.75 | 59.26 | 1.4 | 4 | 0.58 | 49 | 49/4 | 369.66 | 73.96 | ||||||||||||
| 10 | 15 | 0.25 | 1.2 | 4 | 0.56 | 53 | 53/4 | 375.92 | 13.70 | 10 | 15 | 0.25 | 1.2 | 4 | 0.80 | 57 | 57/4 | 366.07 | 25.12 | 10 | 15 | 0.25 | 1.2 | 4 | 0.13 | 47 | 47/4 | 373.92 | 11.97 | |||
| 1.4 | 4 | 0.56 | 53 | 53/4 | 375.92 | 3.03 | 1.4 | 4 | 0.80 | 57 | 57/4 | 366.07 | 4.13 | 1.4 | 2 | 0.15 | 24 | 24/2 | 377.53 | 4.62 | ||||||||||||
| 0.50 | 1.2 | 4 | 0.51 | 54 | 54/4 | 352.91 | 19.05 | 0.50 | 1.2 | 4 | 0.65 | 56 | 56/4 | 365.26 | 25.26 | 0.50 | 1.2 | 4 | 0.67 | 57 | 57/4 | 349.83 | 30.64 | |||||||||
| 1.4 | 4 | 0.51 | 54 | 54/4 | 352.91 | 4.63 | 1.4 | 4 | 0.65 | 56 | 56/4 | 365.26 | 5.43 | 1.4 | 4 | 0.67 | 57 | 57/4 | 349.83 | 6.47 | ||||||||||||
| 0.75 | 1.2 | 2 | 0.37 | 27 | 27/2 | 390.62 | 32.77 | 0.75 | 1.2 | 4 | 0.41 | 55 | 55/4 | 372.72 | 37.02 | 0.75 | 1.2 | 4 | 0.59 | 57 | 57/4 | 373.97 | 47.69 | |||||||||
| 1.4 | 2 | 0.37 | 27 | 27/2 | 390.62 | 9.16 | 1.4 | 4 | 0.41 | 55 | 55/4 | 372.72 | 10.00 | 1.4 | 4 | 0.59 | 57 | 57/4 | 373.97 | 12.85 | ||||||||||||
| 30 | 0.25 | 1.2 | 2 | 0.26 | 27 | 27/2 | 353.54 | 20.01 | 30 | 0.25 | 1.2 | 4 | 0.58 | 65 | 65/4 | 370.73 | 41.85 | 30 | 0.25 | 1.2 | 4 | 0.74 | 73 | 73/4 | 360.95 | 61.52 | ||||||
| 1.4 | 2 | 0.26 | 27 | 27/2 | 353.54 | 6.34 | 1.4 | 4 | 0.58 | 65 | 65/4 | 370.73 | 10.72 | 1.4 | 4 | 0.74 | 73 | 73/4 | 360.95 | 16.94 | ||||||||||||
| 0.50 | 1.2 | 4 | 0.48 | 61 | 61/4 | 364.46 | 38.90 | 0.50 | 1.2 | 4 | 0.53 | 66 | 66/4 | 365.93 | 53.27 | 0.50 | 1.2 | 4 | 0.16 | 56 | 56/4 | 364.22 | 42.69 | |||||||||
| 1.4 | 4 | 0.48 | 61 | 61/4 | 364.46 | 10.99 | 1.4 | 4 | 0.53 | 66 | 66/4 | 365.93 | 15.56 | 1.4 | 4 | 0.16 | 56 | 56/4 | 364.22 | 14.70 | ||||||||||||
| 0.75 | 1.2 | 4 | 0.05 | 47 | 47/4 | 349.36 | 39.03 | 0.75 | 1.2 | 4 | 0.60 | 69 | 69/4 | 373.90 | 78.41 | 0.75 | 1.2 | 4 | 0.60 | 73 | 73/4 | 374.48 | 93.23 | |||||||||
| 1.4 | 4 | 0.05 | 47 | 47/4 | 349.36 | 17.14 | 1.4 | 4 | 0.60 | 69 | 69/4 | 373.90 | 27.44 | 1.4 | 4 | 0.60 | 73 | 73/4 | 374.48 | 34.50 |
Table 2. Design table for the lower one-sided s-EWMA charts.
| ssARL | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|
| n | s | zsARL | ||||||||
| 0 | 5 | 15 | 0.25 | 4 | 0.52 | 7 | 7/4 | 366.63 | 60.64 | 14.24 |
| 0.50 | 2 | 0.43 | 3 | 3/2 | 388.09 | 99.30 | 24.79 | |||
| 0.75 | 4 | 0.25 | 6 | 6/4 | 361.05 | 256.22 | 60.87 | |||
| 30 | 0.25 | 4 | 0.53 | 6 | 6/4 | 384.16 | 74.98 | 17.65 | ||
| 0.50 | 4 | 0.74 | 3 | 3/4 | 379.04 | 106.21 | 34.61 | |||
| 0.75 | 2 | 0.78 | 1 | 1/2 | 372.40 | 131.39 | 25.84 | |||
| 10 | 15 | 0.25 | 4 | 0.53 | 23 | 23/4 | 367.67 | 32.08 | 5.62 | |
| 0.50 | 4 | 0.65 | 22 | 22/4 | 352.29 | 26.22 | 6.64 | |||
| 0.75 | 4 | 0.67 | 21 | 21/4 | 372.61 | 41.99 | 12.39 | |||
| 30 | 0.25 | 1 | 0.93 | 3 | 3 | 359.11 | 46.42 | 8.84 | ||
| 0.50 | 4 | 0.61 | 18 | 18/4 | 370.63 | 47.72 | 11.24 | |||
| 0.75 | 4 | 0.38 | 17 | 17/4 | 359.87 | 129.67 | 28.53 | |||
| 0.025 | 5 | 15 | 0.25 | 4 | 0.86 | 2 | 2/4 | 358.43 | 83.96 | 24.73 |
| 0.50 | 1 | 0.85 | 0 | 0 | 352.30 | 94.62 | 31.30 | |||
| 0.75 | 4 | 0.36 | 5 | 5/4 | 386.76 | 122.62 | 41.93 | |||
| 30 | 0.25 | 4 | 0.74 | 2 | 2/4 | 373.14 | 90.76 | 26.53 | ||
| 0.50 | 4 | 0.37 | 5 | 5/4 | 384.39 | 111.56 | 31.94 | |||
| 0.75 | 4 | 0.52 | 2 | 2/4 | 359.15 | 130.90 | 52.60 | |||
| 10 | 15 | 0.25 | 4 | 0.63 | 22 | 22/4 | 369.72 | 23.15 | 5.16 | |
| 0.50 | 1 | 0.90 | 4 | 4 | 353.08 | 32.00 | 8.16 | |||
| 0.75 | 1 | 0.50 | 5 | 5 | 372.04 | 70.80 | 17.88 | |||
| 30 | 0.25 | 2 | 0.74 | 7 | 7/2 | 363.02 | 47.85 | 10.64 | ||
| 0.50 | 4 | 0.69 | 14 | 14/4 | 357.92 | 57.50 | 14.83 | |||
| 0.75 | 2 | 0.54 | 7 | 7/2 | 363.54 | 80.21 | 24.99 | |||
| 0.050 | 5 | 15 | 0.25 | 2 | 0.76 | 1 | 1/2 | 355.15 | 79.91 | 23.25 |
| 0.50 | 4 | 0.74 | 2 | 2/4 | 370.84 | 96.32 | 31.25 | |||
| 0.75 | 4 | 0.61 | 3 | 3/4 | 355.01 | 121.13 | 48.20 | |||
| 30 | 0.25 | 4 | 0.48 | 4 | 4/4 | 363.11 | 96.54 | 27.21 | ||
| 0.50 | 4 | 0.51 | 2 | 2/4 | 364.58 | 109.52 | 36.61 | |||
| 0.75 | 4 | 0.38 | 2 | 2/4 | 362.52 | 138.33 | 56.57 | |||
| 10 | 15 | 0.25 | 4 | 0.80 | 18 | 18/4 | 370.33 | 28.94 | 6.31 | |
| 0.50 | 4 | 0.75 | 18 | 18/4 | 368.05 | 36.39 | 9.17 | |||
| 0.75 | 4 | 0.66 | 18 | 18/4 | 368.82 | 53.45 | 16.16 | |||
| 30 | 0.25 | 1 | 0.64 | 3 | 3 | 378.90 | 40.22 | 12.35 | ||
| 0.50 | 4 | 0.53 | 14 | 14/4 | 365.52 | 66.35 | 17.40 | |||
| 0.75 | 2 | 0.75 | 5 | 5/2 | 366.02 | 91.16 | 30.87 | |||
The IC parameter values of the process are given in the columns entitled ‘ ’, ‘ ’, ‘n’ and ‘ ’ while the IC performance for each chart is given in the column ‘zsARL’ and the OoC performance (ssARL values) for ( or ) is given in the column ‘ssARL’.
Tables 1 and 2 reveal that for s>1 (i.e. for s = 2 or s = 4) the s-EWMA chart has (in the most of the considered IC scenarios) an IC zsARL value close to the desired value. As already said, because of the discrete nature of the considered models, it was impossible to achieve exactly the desired value. However, the difference in the obtained IC zsARL values, in almost all cases in Tables 1 and 2 is at most 5%. We observe that in the most of the cases, optimal values for the set of chart's parameters are for larger than 1 values of the rounding parameter s (e.g. s = 2 or s = 4). Also, these values give an IC zsARL closer to the desired value. This is an indication of an increased flexibility as well as of an optimized detection ability for the s-EWMA chart. From a practical point of view and regarding the determination of the chart's parameters and , for a given s, as the value of decreases, the value of decreases, which is usually desirable, so that the EWMA charts to be more efficient than Shewhart charts. In a similar manner, for the lower one-sided charts, as increases, decreases, in order to achieve the desired IC performance.
Furthermore, when extra-binomial variation is present on the process, larger values for s and smaller values for are needed, in order to achieve the desired IC performance. Otherwise, if the extra-binomial variation is not taken into account and proceed with the values (or ) obtained under the BAR(1) model (i.e. as if no extra-binomial is present), the resulting chart will demonstrate an increased FAR. This is, for example, the case of upper one-sided s-EWMA charts for and , where the has to be increased from 54/4 (under the BAR(1) model) to 57/4 (under the BBAR(1) model) in order to preserve the IC performance (as close as possible) at the desired levels. Note also that a proper adjustment of the is necessary while the detection ability of the chart is clearly affected by the presence of extra-binomial variation; under the BBAR(1) model, the ssARL at equals 30.64 while under the BAR(1) equals 19.05. Both models have the same marginal mean but BBAR(1) is overdispersed. For the lower one-sided charts, this can be noticed for and , where the has to be decreased from 18/4 (under the BAR(1) model) to 14/4 (under the BBAR(1) model) in order to preserve the IC performance (as close as possible) at the desired levels.
Tables 3 and 4 give the results of a comparative study between the one-sided s-EWMA, CUSUM and Shewhart charts, for both the BAR(1) and BBAR(1) processes. For each shift (upward shifts) and (downward shifts), the ARL profiles are given for the respective charts. Also, the IC parameter values of the process are given in the columns ‘ ’, ‘ ’, ‘n’ and ‘ ’. It is worth mentioning that the shifts occur only in and it is , i.e. only π is affected by the presence of assignable causes. Once again, because of the discrete nature of the BAR(1) and BBAR(1) models, it was impossible to have exactly the same zsARL value for all the schemes under comparison. However, since the IC zsARL value between the different schemes varies, the interpretation should be made with caution.
Table 3. ARL comparison, upper one-sided Shewhart, s-EWMA and CUSUM charts.
| n | δ | Shewhart | 1-EWMA | 2-EWMA | 4-EWMA | CUSUM | |||
|---|---|---|---|---|---|---|---|---|---|
| 0 | 5 | 30 | 0.25 | 1.0 | 502.72 | 503.62 | 492.27 | 489.95 | 490.07 |
| 1.1 | 223.27 | 204.62 | 135.39 | 134.48 | 159.42 | ||||
| 1.2 | 110.34 | 95.09 | 55.90 | 51.95 | 63.85 | ||||
| 1.3 | 59.68 | 49.60 | 30.95 | 25.86 | 30.89 | ||||
| 1.4 | 34.85 | 28.57 | 20.66 | 15.51 | 17.61 | ||||
| 1.5 | 21.74 | 17.91 | 15.46 | 10.59 | 11.45 | ||||
| 1.7 | 9.92 | 8.61 | 10.42 | 6.29 | 6.34 | ||||
| 2.0 | 4.13 | 4.09 | 7.20 | 3.93 | 3.78 | ||||
| UCL | 12 | 11 | 15/2 | 31/4 | |||||
| λ | 1 | 0.78 | 0.18 | 0.24 | |||||
| h | 8 | ||||||||
| k | 7 | ||||||||
| n | δ | Shewhart | 1-EWMA | 2-EWMA | 4-EWMA | CUSUM | |||
| 0.025 | 5 | 15 | 0.75 | 1.0 | 393.26 | 320.84 | 379.95 | 385.18 | 390.13 |
| 1.1 | 208.46 | 164.18 | 190.31 | 185.98 | 154.32 | ||||
| 1.2 | 119.57 | 95.28 | 107.32 | 103.64 | 77.85 | ||||
| 1.3 | 73.69 | 58.44 | 65.46 | 61.43 | 46.76 | ||||
| 1.4 | 48.39 | 37.75 | 41.30 | 41.16 | 31.99 | ||||
| 1.5 | 33.60 | 26.68 | 28.96 | 28.20 | 23.99 | ||||
| 1.7 | 18.60 | 15.41 | 16.46 | 16.36 | 16.01 | ||||
| 2.0 | 9.88 | 8.69 | 9.02 | 9.15 | 10.98 | ||||
| UCL | 11 | 10 | 19/2 | 37/4 | |||||
| λ | 1 | 0.5 | 0.46 | 0.41 | |||||
| h | 30 | ||||||||
| k | 6 | ||||||||
| n | δ | Shewhart | 1-EWMA | 2-EWMA | 4-EWMA | CUSUM | |||
| 0.05 | 5 | 30 | 0.50 | 1.0 | 385.96 | 369.19 | 348.06 | 378.34 | 385.29 |
| 1.1 | 247.82 | 217.53 | 202.43 | 181.05 | 150.51 | ||||
| 1.2 | 163.98 | 135.21 | 124.80 | 99.72 | 74.55 | ||||
| 1.3 | 111.71 | 87.98 | 80.83 | 60.34 | 44.10 | ||||
| 1.4 | 78.25 | 59.71 | 54.75 | 39.53 | 29.82 | ||||
| 1.5 | 56.30 | 42.11 | 38.64 | 27.71 | 22.13 | ||||
| 1.7 | 31.42 | 23.22 | 21.44 | 15.75 | 14.48 | ||||
| 2.0 | 15.49 | 11.75 | 11.01 | 9.02 | 9.63 | ||||
| UCL | 15 | 13 | 25/2 | 37/4 | |||||
| λ | 1 | 0.69 | 0.65 | 0.25 | |||||
| h | 34 | ||||||||
| k | 6 | ||||||||
| n | δ | Shewhart | 1-EWMA | 2-EWMA | 4-EWMA | CUSUM | |||
| 0.05 | 10 | 30 | 0.75 | 1.0 | 345.27 | 367.46 | 351.50 | 360.94 | 362.10 |
| 1.1 | 175.59 | 181.17 | 167.58 | 157.92 | 134.61 | ||||
| 1.2 | 96.96 | 96.88 | 89.34 | 79.83 | 65.11 | ||||
| 1.3 | 57.95 | 55.53 | 52.45 | 46.79 | 38.27 | ||||
| 1.4 | 37.23 | 33.71 | 33.51 | 30.08 | 25.96 | ||||
| 1.5 | 25.51 | 21.41 | 23.02 | 20.78 | 19.44 | ||||
| 1.7 | 14.04 | 9.49 | 12.90 | 12.20 | 13.05 | ||||
| 2.0 | 7.60 | 3.26 | 7.24 | 7.39 | 9.07 | ||||
| UCL | 20 | 20 | 37/2 | 66/4 | |||||
| λ | 1 | 0.93 | 0.63 | 0.30 | |||||
| h | 44 | ||||||||
| k | 12 |
Table 4. ARL comparison, lower one-sided Shewhart, s-EWMA and CUSUM charts.
| n | δ | Shewhart | 1-EWMA | 2-EWMA | 4-EWMA | CUSUM | |||
|---|---|---|---|---|---|---|---|---|---|
| 0 | 10 | 30 | 0.5 | 1 | 332.96 | 352.21 | 353.77 | 370.63 | 339.04 |
| 0.9 | 124.73 | 120.79 | 127.00 | 131.67 | 78.11 | ||||
| 0.8 | 53.59 | 45.59 | 46.46 | 47.72 | 27.16 | ||||
| 0.7 | 24.86 | 20.65 | 20.72 | 21.13 | 13.45 | ||||
| 0.6 | 14.27 | 11.09 | 11.06 | 11.24 | 8.50 | ||||
| 0.5 | 8.00 | 6.88 | 6.90 | 6.97 | 6.22 | ||||
| 0.4 | 5.32 | 4.80 | 4.83 | 4.88 | 4.97 | ||||
| 0.2 | 2.97 | 2.97 | 3.04 | 3.06 | 3.67 | ||||
| LCL | 3 | 4 | 9/2 | 18/4 | |||||
| λ | 1 | 0.65 | 0.6 | 0.61 | |||||
| h | 14 | ||||||||
| k | 8 | ||||||||
| n | δ | Shewhart | 1-EWMA | 2-EWMA | 4-EWMA | CUSUM | |||
| 0.025 | 10 | 30 | 0.25 | 1 | 378.38 | 392.10 | 363.02 | 373.38 | 388.22 |
| 0.9 | 150.30 | 132.53 | 126.76 | 127.26 | 56.47 | ||||
| 0.8 | 64.34 | 50.04 | 47.85 | 48.41 | 20.13 | ||||
| 0.7 | 29.85 | 21.84 | 20.95 | 21.26 | 11.41 | ||||
| 0.6 | 15.09 | 11.02 | 10.64 | 10.79 | 7.93 | ||||
| 0.5 | 8.36 | 6.37 | 6.21 | 6.27 | 6.12 | ||||
| 0.4 | 5.07 | 4.15 | 4.08 | 4.10 | 5.02 | ||||
| 0.2 | 2.40 | 2.32 | 2.30 | 2.30 | 3.76 | ||||
| LCL | 2 | 3 | 7/2 | 14/4 | |||||
| λ | 1 | 0.78 | 0.74 | 0.76 | |||||
| h | 24 | ||||||||
| k | 9 | ||||||||
| n | δ | Shewhart | 1-EWMA | 2-EWMA | 4-EWMA | CUSUM | |||
| 0.05 | 10 | 15 | 0.25 | 1 | 507.28 | 456.25 | 500.75 | 502.23 | 460.43 |
| 0.9 | 143.14 | 107.49 | 113.72 | 115.49 | 43.23 | ||||
| 0.8 | 48.68 | 33.32 | 30.83 | 33.43 | 13.98 | ||||
| 0.7 | 19.79 | 13.48 | 12.17 | 13.25 | 7.88 | ||||
| 0.6 | 9.51 | 6.48 | 6.38 | 6.77 | 5.53 | ||||
| 0.5 | 5.32 | 4.16 | 4.08 | 4.18 | 4.31 | ||||
| 0.4 | 3.38 | 2.89 | 2.98 | 2.95 | 3.58 | ||||
| 0.2 | 1.82 | 1.80 | 2.01 | 1.90 | 2.74 | ||||
| LCL | 3 | 4 | 10/2 | 19/4 | |||||
| λ | 1 | 0.79 | 0.59 | 0.69 | |||||
| h | 15 | ||||||||
| k | 9 |
For the one-sided CUSUM chart (see Rakitzis et al. [15]), the plotted statistic for the upper one-sided chart is given by
The chart gives an OoC signal when for the first time . Parameter is known as reference value and control limit is the decision interval. Rakitzis et al. [15] suggested for or in order to assure that values are integers and the performance of the CUSUM chart can be evaluated exactly by means of the Markov chain method. Also, these values for guarantee an optimized detection ability for the chart. In a similar manner, the plotted statistic for the lower one-sided CUSUM chart is
and the chart gives an OoC signal when for the first time . The design parameters are defined analogously; the suggested values are or .
From the ARL profiles of the charts in Tables 3 and 4, it is clear that EWMA-type charts are superior to the Shewhart-type charts. The superiority is obvious in cases where the IC zsARL of the Shewhart-type chart is lower than the respective value for the s-EWMA chart but the ssARL of the latter, at a given shift, is lower than the one corresponds to the Shewhart chart. This means that the Shewhart chart signals, on average, more false alarms (which is not desirable) than the s-EWMA chart whereas the s-EWMA chart detects more quickly the given shift. Also, this can be verified by comparing directly the respective entries in Tables 1–2 with Tables 1 and 3 in Rakitzis et al. [15]. Also, either in the upper or the lower one-sided case, the performance of the respective EWMA control charts becomes better as the rounding parameter s increases. The comparison of the ARL profiles between the s-EWMA charts and the CUSUM charts for BAR(1) and BBAR(1) reveals that CUSUM charts are very powerful charts in the detection of small and moderate shifts in the mean level of the process. Only for specific IC scenarios, the performance of the proposed s-EWMA charts is better or at least comparable with the performance of the corresponding one-sided CUSUM charts; this is mostly happens for moderate to large shifts in , i.e. for (upward shifts) or for (downward shifts).
5. Application
In this section, we present an application of the proposed s-EWMA charts to real data for monitoring BAR(1) and BBAR(1) processes. These data refer to the regional spread of an infection in Germany within a year. Specifically, we have the weekly number of regions in Germany, with a new case of hantavirus infection in 2011, for T = 52 weeks. The number of regions is n = 38. More details on this dataset can be found in Weiß and Pollett [26] and Ristić et al. [16].
The time series plot in Figure 1 shows that the values in the sample are between 0 and 11. The sample mean is 4.173 and the sample variance is 7.793. Furthermore, the binomial index of dispersion is , which indicates extra-binomial variation. In addition, it is reasonable to assume that the probability of the occurrence of a new infection may not be the same in all regions as they usually differ (e.g. according to various socio-economic criteria). The empirical first-order autocorrelation function equals . Here, for the sake of illustration, we follow the work of Weiß and Pollett [26] who considered as an appropriate model for this dataset a first-order autoregressive model. However, it should be mentioned that Ristić et al. [16] found that a model of order 3 (i.e. a BAR(3)) has a better fit on these data, than the BAR(1). Also, Ristić et al. [16] did not consider a higher order BBAR model. It goes without saying that it is of interest to analyse further this dataset by fitting also a higher-order Binomial or Beta-binomial models and then propose suitable methods for process monitoring. However, since the intention is to show how the proposed control charts can be applied in practice, we will not consider more complex models and they are left for future research.
Figure 1.
Weekly number of districts with new cases of Hantavirus.
Next, we fit both the BAR(1) and BBAR(1) models to the data and we estimate (via the maximum likelihood method) the unknown parameters for both models. Also, in order to choose between the two models the one that fits better to the data, the Akaike Information Criterion and the Bayesian Information Criterion are used, which are given by
The is the maximum value for the log-likelihood function, κ is the number of model parameters ( for the BAR(1) model and for the BBAR(1) model) and T = 52. The standard errors of the estimates are given in the parentheses. The results are given in Table 5. The estimates for the parameters of the BAR(1) model coincide with the ones listed in the first row of Table 3 in Ristić et al. [16]; the differences are due to rounding.
Table 5. Fitting the BAR(1) and BBAR(1) models in the Hantavirus data.
| Model | AIC | BIC | |||
|---|---|---|---|---|---|
| BAR(1) | 0.111 (0.013) | 0.529 (0.070) | 227.029 | 230.931 | |
| BBAR(1) | 0.112 (0.179) | 0.564 (0.074) | 0.029 (0.016) | 217.929 | 223.782 |
Clearly, the BBAR(1) model has a better fit than the BAR(1) model since it attains the minimum value for both AIC and BIC. Therefore, we assume that the process is a BBAR(1) process where its true parameter values are equal to the respective estimates in Table 5. By following the steps that are described in Section 3, we develop upper and lower one-sided Shewhart, CUSUM and s-EWMA charts, s = 1, 2, 4, for the statistical monitoring of the process. We choose, for illustrative purposes, and the values of the design parameters for each chart are such that they have their IC zsARL value as close as possible to the desired value. Next, we present our findings, by starting from the upper-sided case. We consider the upper one-sided BBAR(1) Shewhart chart with UCL = 13 and zsARL = 324.52, the upper-sided CUSUM chart with , and zsARL = 378.75, the 1-EWMA chart with and zsARL = 352.85, the 2-EWMA chart with and zsARL = 354.62 and the 4-EWMA chart with and zsARL = 370.60. The upper one-sided charts for the Hantavirus data are given in Figures 2 and 3.
Figure 2.
Upper one-sided Shewhart and s-EWMA charts, s = 1, 2, 4 for the Hantavirus data.
Figure 3.
Upper one-sided CUSUM chart for the Hantavirus data.
We observe that in the last weeks of the year, there is a strong upward movement which begins shortly after the 30th week, which is followed by a clear indication of an upward shift from the 41st week onwards. This shift is perceived by all schemes; the CUSUM gives an OoC signal at the 52nd week.
We continue now with the lower one-sided case, where we consider the lower one-sided BBAR(1) Shewhart chart with LCL = 0 and zsARL = 44.28, the lower one-sided CUSUM chart with , and zsARL = 366.34, the 1-EWMA chart with and zsARL = 173.58, the 2-EWMA chart with and zsARL = 375.62, and the 4-EWMA chart with and zsARL = 366.28. It should be mentioned that both the lower one-sided Shewhart and 1-EWMA charts have IC performance that it is not very close to the desired one. The lower one-sided charts for the Hantavirus data are given in Figures 4 and 5.
Figure 4.
Lower one-sided Shewhart and s-EWMA charts, s = 1, 2, 4 for the Hantavirus data.
Figure 5.
Lower one-sided CUSUM chart for the Hantavirus data.
We notice that the lower one-sided Shewhart chart gives an OoC signal ( ), but it should be interpreted with caution because of its low IC zsARL value. In cases like this, i.e. when a chart has a low IC zsARL value, we suggest to use a more efficient scheme in order to detect decreases in the mean level of the process. On the contrary the lower one-sided CUSUM, 2-EWMA and 4-EWMA control charts give IC close to the desired value. Also we observe that in the first 29 weeks of the year there is not a clear indication of regional spread of hantavirus infection; the range of values is between 0 and 5 during this period. The low counts during this period cause a disorder that it is captured by all schemes.
6. Conclusion and discussion
In this work, we developed and studied one-sided s-EWMA control charts that are suitable for the detection of upward and downward shifts in the mean level of Binomial AR(1) and Beta-Binomial AR(1) processes. Both models are used frequently in practice in order to describe correlated data with a finite range. The BAR(1) model is a good choice to model count data processes with a first-order AR dependence structure and a binomial marginal distribution. However, when there are indications of extra-binomial variation and/or inhomogeneity among the n items of the sample, the BBAR(1) is a more appropriate choice. The results of an extensive numerical study regarding the statistical design and the performance of the proposed s-EWMA charts revealed that between the Shewhart and the s-EWMA charts, the latter perform better than the former; under certain circumstances, their performance can be comparable to the performance of CUSUM-type charts.
Moreover, the numerical study revealed that the extra-binomial variation affects the detection ability of the s-EWMA chart, as well as its IC performance. For , the control limit obtained under the BAR(1) model needs a proper adjustment, in order to keep the FAR at the desired level. Also, at a given shift δ, the ssARL is larger under the BBAR(1) model than the corresponding value under the BAR(1) model, for control charts with comparable IC performance.
Finally, the practical application of the proposed schemes was illustrated via a real-data example. For all calculations, the R statistical software R Core Team [14] was used and the programs are available from the authors upon request.
Topics for future research consist of the development and study of other types of control charts, such as the mixture cumulative count [9], in order to compare them with the existing ones. Also, an extension to this study is the development of simultaneous control charting procedures that can provide, except for a quick and accurate detection ability, additional information about which of the process parameters has changed; one of the main assumptions is that the presence of assignable causes affects only the mean level of the process. Finally, as already said, the discrete nature of the considered processes does not allow to develop an s-EWMA chart with the desired IC performance. In order to overcome this limitation, the methodology developed by Paulino et al. [12], based on the theory of uniformly most powerful unbiased tests (UMPU) and the use of randomization probabilities, is expected to provide designs for all the charts under comparison, with an in-control ARL value equal to a pre-specified one. However, even though the case of one-sided Shewhart chart is feasible, some technical difficulties need to be tackled properly for the one-sided CUSUM and EWMA charts. Certainly, this is a topic worthy of future research.
Acknowledgments
The authors would like to express their gratitude to the Associate Editor and the two anonymous reviewers for their constructive comments which improved the content and the presentation of this paper.
Disclosure statement
No potential conflict of interest was reported by the author(s).
References
- 1.Al-Osh M.A. and Alzaid A.A., First-order integer-valued autoregressive (INAR(1)) process, J. Time Ser. Anal. 8 (1987), pp. 261–275. [Google Scholar]
- 2.Brook D. and Evans D.A., An approach to the probability distribution of CUSUM run length, Biometrika 59 (1972), pp. 539–549. [Google Scholar]
- 3.Castagliola P., Tran K.P., Celano G., Rakitzis A.C., and Maravelakis P.E., An EWMA-type sign chart with exact run length properties, J. Quality Technol. 51 (2019), pp. 51–63. [Google Scholar]
- 4.Chang T.C. and Gan F.F., Cumulative sum charts for high yield processes, Stat. Sin. 11 (2001), pp. 791–805. [Google Scholar]
- 5.Gan F.F., Monitoring observations generated from a binomial distribution using modified exponential weighted moving average control chart, J. Stat. Comput. Simul. 37 (1990), pp. 45–60. [Google Scholar]
- 6.Gan F.F., An optimal design of CUSUM control charts for binomial counts, J. Appl. Stat. 20 (1993), pp. 445–460. [Google Scholar]
- 7.Knoth S., The art of evaluating monitoring schemes – How to measure the performance of control charts? In H.-J. Lenz and P.-T. Wilrich, editors, Frontiers in Statistical Quality Control 8, pages 74–99. Heidelberg: Physica-Verlag, 2006
- 8.Lucas J.M. and Crosier R.B., Fast initial response for CUSUM quality control schemes, Technometrics 24 (1982), pp. 199–205. [Google Scholar]
- 9.Majeed M.Y., Aslam M., and Riaz M., Mixture cumulative count control chart for mixture geometric process characteristics, Qual. Quant. 47 (2013), pp. 2289–2307. [Google Scholar]
- 10.McKenzie E., Some simple models for discrete variate time series, Water Resour. Bull. 21 (1985), pp. 645–650. [Google Scholar]
- 11.Montgomery D.C., Introduction to Statistical Quality Control, 6th ed. John Wiley & Sons, Inc., New York, 2009. [Google Scholar]
- 12.Paulino S., Morais M.C., and Knoth S., On ARL-unbiased c-charts for INAR(1) Poisson counts, Statistical Papers 60 (2019), pp. 1021–1038. [Google Scholar]
- 13.Psarakis S. and Papaleonida G.E.A., SPC procedures for monitoring autocorrelated processes, Qual. Technol. Quant. Manag. 4 (2007), pp. 501–540. [Google Scholar]
- 14.R Core Team . R: A Language and Environment for Statistical Computing. R Foundation for Statistical Computing, Vienna, Austria, 2020. Available at http://www.R-project.org
- 15.Rakitzis A.C., Weiß C.H., and Castagliola P., Control charts for monitoring correlated counts with a finite range, Appl. Stoch. Models. Bus. Ind. 33 (2017), pp. 733–749. [Google Scholar]
- 16.Ristić M.M., Weiß C.H., and Janjić A.D., A binomial integer-valued ARCH model, Int. J. Biostat. 12 (2016 [DOI] [PubMed] [Google Scholar]
- 17.Roberts S.W., Control chart tests based on geometric moving averages, Technometrics 1 (1959), pp. 239–250. [Google Scholar]
- 18.Steutel F.W. and van Harn K., Discrete analogues of self-decomposability and stability, Ann. Probab. 7 (1979), pp. 893–899. [Google Scholar]
- 19.Weiß C.H., EWMA monitoring of correlated processes of Poisson counts, Qual. Technol. Quant. Manag. 6 (2009a), pp. 137–153. [Google Scholar]
- 20.Weiß C.H., Monitoring correlated processes with binomial marginals, J. Appl. Stat. 36 (2009b), pp. 399–414. [Google Scholar]
- 21.Weiß C.H., Detecting mean increases in Poisson INAR(1) processes with EWMA control charts, J. of Appl. Stat. 38 (2011b), pp. 383–398. [Google Scholar]
- 22.Weiß C.H., The Markov chain approach for performance evaluation of control charts – a tutorial. In Samuel P. Werther, editor, Process Control: Problems, Techniques and Applications, pages 205–228. Nova Science Publishers, Inc., 2011a
- 23.Weiß C.H., SPC methods for time-dependent processes of counts–a literature review, Cogent Mathematics 2 (2015), pp. 1111116. [Google Scholar]
- 24.Weiß C.H. and Kim H.Y., Parameter estimation for binomial AR(1) models with applications in finance and industry, Stat. Papers 54 (2013), pp. 563–590. [Google Scholar]
- 25.Weiß C.H. and Kim H.-Y., Diagnosing and modeling extra-binomial variation for time-dependent counts, Appl. Stoch. Models. Bus. Ind. 30 (2014), pp. 588–608. [Google Scholar]
- 26.Weiß C.H. and Pollett P.K., Binomial autoregressive processes with density dependent thinning, J. Time Ser. Anal. 35 (2014), pp. 115–132. [Google Scholar]
- 27.Weiß C.H. and Testik M.C., Detection of abrupt changes in count data time series: Cumulative sum derivations for INARCH(1) models, J. Quality Technol. 44 (2012), pp. 249–264. [Google Scholar]
- 28.Wu Z., Jiao J., and Liu Y., A binomial CUSUM chart for detecting large shifts in fraction nonconforming, J. Appl. Stat. 35 (2008), pp. 1267–1276. [Google Scholar]
- 29.Yeh A.B., Mcgrath R.N., Sembower M.A., and Shen Q., EWMA control charts for monitoring high-yield processes based on non-transformed observations, Int. J. Product Res. 46 (2008), pp. 5679–5699. [Google Scholar]
- 30.Yontay P., Weiß C.H., Testik M.C., and Bayindir Z.P., A two-sided cumulative sum chart for first-order integer-valued autoregressive processes of Poisson counts, Qual. Reliab. Eng. Int. 29 (2013), pp. 33–42. [Google Scholar]