Abstract

This study describes the release of electricity consumption data of some manufacturing factories located in South Korea that participate in the demand response (DR) market. The data (in kilowatt) comprise individual factories’ total power usage details that were acquired using advanced metering infrastructures. They further contain details on the manufacture types, DR participation dates, mandatory reduction capacities, and response capacities of the factories. For data acquisition, 10 manufacturing companies are representatively selected according to the process regularity and company size standard of this study. Entire datasets are newly collected and available at one-minute intervals for seven months from 1 March to 30 September 2019. These datasets can be used in a variety of ways to contribute to the functioning of power systems and markets, including the conduction of industrial load characteristic analysis for load flexibility, estimation of demand-side considerations for virtual power plant design, and determination of energy markets and incentives to achieve carbon neutrality targets at the national level.

Subject terms: Energy economics, Energy supply and demand


Measurement(s) electricity consumption
Technology Type(s) advanced metering infrastructure

Background & Summary

Today, global energy and environmental conditions necessitate the widespread use of renewable energy sources for countries to achieve their carbon neutrality targets and, thereby, address climate change problems1. However, installing renewable energy resources without accounting for the power system reliability limitation causes system stress resulting from a supply-demand imbalance, such as from oversupply or excessive security2. This forces more ancillary generators in the system to stand by or promotes inefficient investment in power grid reinforcement3. To solve this problem, power system operators must understand the concept of load flexibility (LF). LF refers to the resources used to ensure the stable operation of the power system by facilitating dynamic changes, including increments and decrements, in demand. This includes implementing demand-side management (DSM), which changes power use patterns according to the time-series energy production characteristics of wind turbines or solar power sources to increase the application rate of renewable energy4,5.

The demand resources for LF are classified into industrial, commercial, and residential loads6. To apply the LF resources in DSM, load data at one-minute or one-hour resolution are collected for analysis, as shown in Table 1718. Further, up-to-date public data on power usage are collected to perform non-intrusive load monitoring research. They mainly include information on active power, reactive power, voltage, current, aggregated energy consumption, and appliance-level power consumption1,510,13.

Table 1.

Summary of the details in public datasets.

Dataset Type Duration Number of buildings Sampling rate
Individual household electric power consumption dataset7 Residential 47 months 1 1 min
AMPds28 Residential 2 years 1 1 min
Multifamily Programmable Thermostat Data9 Residential 3 years 79 10 min
ECO dataset10 Residential 8 months 6 1 Hz
DRED11 Residential 6 months 1 1 Hz
REDD12 Residential 119 days 6 1 sec
UK-DALE13 Residential 2.5 years 5 1 min
ENERTALK14 Residential 29–122 days 22 15 Hz
100 EnerNOC Commercial Buildings15 Commercial 1 year 100 15 min
CU-BEMS16 Commercial 18 months 2 1 min
Industrial machines dataset for electrical load disaggregation17 Industrial 111 days 8 1 sec
Food and paper industries18 Industrial 3 years 3 1 h

However, although most of the DSM capacity for LF is met by industrial loads, there are quite a few obstacles to the acquisition of industrial demand data. In a competitive industrial environment, the data disclosure of industrial loads is prohibited since such data are considered a trade secret because a manufacturing plant’s electricity consumption data can be used to infer the company’s sales. To the best of the authors’ knowledge, investigations on manufacturing factories’ load data remain limited; only two studies require special mention in this respect: an investigation on the machine-level load data of a paper manufacturing factory in Brazil17 and an examination of the normalized electricity consumption data of food and paper industries18.

In this study, the authors acquire data from volunteered industrial factories and analyze their characteristics to evaluate demand response (DR) availability of Korean industrial demands for securing power system and market flexibility. Furthermore, a market system is being designed to encourage factories to participate as LF resources.

The authors collect electricity consumption data from manufacturing factories in South Korea by using communication systems, including the advanced metering infrastructure (AMI). These factories participate in the DR market through DSM. Accordingly, the resulting dataset is unique and potentially a valuable consideration in several analyses, including.

  • Expected locational DR capacity estimation by statistically estimating customer baseline load (CBL) and participation amount of each industrial sector.

  • Estimation of hourly LF by analyzing industrial demand consumption patterns.

  • Consideration of demand-side utilization in virtual power plants.

  • Design of the LF market and incentive price.

Methods

The load aggregators performing brokerage transactions in the DR market are authorized to collect electricity usage information from the system operator through the AMI for DSM. In this study, the authors first introduce international and Korean demand response programs in detail. Subsequently, they describe a novel communication system in which a load aggregator collects relevant data through the AMI and finally classify the industrial demand data collected from the factories participating in DR programs by manufacture type.

Demand response programs

DR is defined as a tariff or a program established to motivate changes in electric use by end-use customers in response to changes in the price of electricity over time or to give incentive payments designed to induce lower electricity use at times of high market prices or when grid reliability is jeopardized19. It is classified into price-based DR for economic operational purposes and intensive-based DR for system security purposes. Figure 1 illustrates DR programs included in the planning and operation of power system in detail. In DR programs, the participation performance of resources is evaluated based on CBL estimation19. In general, the average demand usage of past days without participating in DR is used in calculating CBL. Table 2 describes DR services of independent system operators (ISOs) in the US, which are internationally benchemarked2025.

Fig. 1.

Fig. 1

Role of DR in electricity system planning and operation.

Table 2.

Summary of the details of CBL evaluation methods for ISO in the US.

ISO Service CBL evaluation method Adjustment option Description
MISO20 Contingency reserve service Meter-before X Power consumption in the 10-second interval prior to the start of the DR participation time
Regulation reserve service Meter-before X Power consumption for the 5-minute interval preceding the start of the DR participation time
Energy Average O Average power consumption for 10 days out of the past 10 days excluding holidays and weekends
NYISO21,22 Emergency and day-ahead DR Average X Average power consumption for lowest 5 days out of the past 10 days excluding holidays and weekends
PJM23,24 Economic, pre-emergency and emergency DR Average O Average of 3 hours prior to the DR participation time and 2 hours after the DR participation time
Average O Average power consumption for 5 days out of the past 5 days excluding holidays and weekends
Matching day pair O Average power consumption for 3 days most similar with DR participation day
ERCOT25 Emergency response service Regression O Baseline estimation based on the correlation model of power consumption for weather condition on the day and preceding days, the type of day, and daylight
Average O Average power consumption for 8 days out of the past 10 days excluding highest, lowest consumption days
Average O Average power consumption for 20 days out of the past 20 days excluding holidays and weekends
Matching day pair O Average power consumption for 10 days most similar with DR participation day
Meter-before X Power consumption for the immediately preceding time

Korean DR market consists of six programs depending on the purpose as shown in Table 326. In recent years, along with traditional DR programs, they expanded to mitigate environmental issues, including fine dust problems and supply/demand balance due to rapid renewable energy penetration. Participants are restricted from entering the market depending on the type and capacity of resources they have. Table 4 describes Korean ISO’s DR services in detail26.

Table 3.

Summary of the details of the DR program in South Korea.

DR program Purpose
Voluntary DR Economic DR Power supply cost reduction by being participated in the power market in the same way as conventional generators
Peak demand DR Reserve capacity securement in accordance with excess of forecasted demand compared with baseline
Fine dust DR Reduction of power supply cost and fine dust
Reliability DR Substitution of new power generator construction depending on demand reduction during forecasted emergency periods
Frequency DR Frequency drop prevention below stability operating standard
Reverse DR Reduction of renewable energy curtailment

Table 4.

Summary of the details of CBL evaluation methods in South Korea.

CBL evaluation method DR program Description
Max 4 of 5 Standard DR Average power consumption for top 4 days out of the past 5 days excluding holidays and weekends
Mid 6 of 10 Standard DR Average power consumption for 6 days out of the past 10 days excluding highest and lowest consumption 2 days
Mid 4 of 6 Reverse DR (weekdays) and residential DR Average power consumption for 4 days out of the past 6 days excluding highest and lowest consumption days
Mid 8 of 10 Residential DR Average power consumption for 8 days out of the past 10 days excluding highest and lowest consumption days
Past 10 minute Frequency DR Sum of the 1-minute interval power consumption for 10 minutes prior to the start of the DR participation time multiplied by 6
H-mid 4 of 6 Reverse DR (weekends and holiday) Average power consumption for 4 days out of the past 6 days (holidays and weekends), excluding highest and lowest consumption days

Monitoring set-up

In the proposed communication system, watthour pulse (WP) and end-of-interval (EOI) signals are received in one-minute units through the AMI’s photocoupler, which is installed to charge electricity bills to the manufacturing company. The WP-based wattage data are synchronized with the EOI signal and delivered to the server in real-time. Further, the system involves storing the process of monitoring data for a short period to improve data acquisition quality. When data delivery fails, the communication system performs a resending the stored data to the server. After a certain number of retries fail, the data is extinguished by storage period expiration. The well-collected data are backed-up every 30 days. To upload the data to the server, one can select the interface from among Ethernet, RS-232, and RS-482 ports according to the communication environment. Figure 2 illustrates the overall hardware communication network design.

Fig. 2.

Fig. 2

Overall hardware communication network used in the study. EOI, end of interval; IP, Internet Protocol; TCP, Transmission Control Protocol; WP, watthour pulse.

Industrial demand data classification

In Korea, the manufacturing industry is classified into 40 industries. Among them, 10 industries, namely petrochemical, fine chemical, cement, steel, forging, food, paper, metal, electricity/electronics, and textile, mainly participate in the DR market and function as ancillary service resources. The number of their companies account for 44.92% of all industries. The authors selected five representative types which account for 48.36% of the aforementioned 10 manufacturing factories: cement, forge, metal, paper, and steel. Only 11.59% of the companies included in the types are actually participating in the DR program. Therefore, it is expected that they still have high potential that can be utilized as LF resources27.

Data from 20 volunteer factories with data disclosure agreements were obtained. Finally, 10 factories with regular manufacturing processes and their company sizes (e.g., number of employees, sales, and manufacturing scales) were selected in this study. Figures 37 illustrate the five representative manufacturing processes. To maintain information security, the company name and factory location are not disclosed in this paper, and net power consumptions without normalization are mentioned to preserve data originality. This study presents the data measured for seven months from 1 March 2019 to 30 September 2019. During the measurement period, a DR was issued twice; Table 5 depicts the date and time of DR participation, mandatory reduction capacity, and response capacity of each factory for the load aggregator’s transaction.

Fig. 4.

Fig. 4

Forging process.

Fig. 5.

Fig. 5

Metal casting process.

Fig. 6.

Fig. 6

Paper manufacturing process.

Fig. 3.

Fig. 3

Cement manufacturing process.

Fig. 7.

Fig. 7

Steel manufacturing process.

Table 5.

DR market participation records of manufacturing factories.

Manufacturing factory DR participation date(s) Mandatory reduction capacity (kW) Responded capacity (kW)
Metal 1

18:00–19:00,

13 June 2019

8000 8777
Metal 2

17:00–20:00,

15 May 2019

16:00–17:00,

13 June 2019

24000/24000/24000

24000

25737/25874/26822

24279

Metal 3

18:00–19:00,

13 June 2019

8000 10727
Forge 1

18:00–19:00,

13 June 2019

6000 4440
Forge 2

18:00–19:00,

13 June 2019

4000 9
Steel 1

18:00–19:00,

13 June 2019

4000 3925
Steel 2

18:00–19:00,

13 June 2019

60000 195415
Cement 1

18:00–19:00,

13 June 2019

45000 51198
Cement 2

18:00–19:00,

13 June 2019

13000 18999
Paper

18:00–19:00,

13 June 2019

25000 12510

DR, demand response.

Data Records

The entire dataset comprises 10 comma-separated value (CSV) files28, summarised in Table 6. As mentioned earlier, the total electricity consumption (kW) of each factory was measured in this study. The CSV files of each factory have 308160 rows, including N/A spaces and outliers, which indicate one-minute-interval data (1440 data points/day) for 214 days during the 7-month data collection period in 2019. Since the method of preprocessing data is selected and applied according to various research purposes, the authors provided raw data for reuse without preprocessing. Each file has two columns: one indicates time information (in the YYYY-MM-DD hh:mm format), while the other indicates the factory’s real-time electricity consumption. For better reuse, the Korean system load data file of the same period is provided together28. The dataset has been made publicly available under the creative commons license CC BY 4.0 hosted on the figshare repository.

Table 6.

Summary of manufacturing factories’ dataset file names.

Manufacturing factory Name The number of data Data periods
Cement 1 Cement_1.csv 306941 2019–03–01~2019–09–30
Cement 2 Cement_2.csv 307475 2019–03–01~2019–09–30
Forge 1 Forge_1.csv 306656 2019–03–01~2019–09–30
Forge 2 Forge_2.csv 308029 2019-03-01~2019-09-30
Metal 1 Metal_1.csv 208154 2019-03-01~2019-09-30
Metal 2 Metal_2.csv 276938 2019–03–01~2019–09–30
Metal 3 Metal_3.csv 307566 2019–03–01~2019–09–30
Paper Paper.csv 308158 2019–03–01~2019–09–30
Steel 1 Steel_1.csv 303501 2019–03–01~2019–09–30
Steel 2 Steel_2.csv 308160 2019–03–01~2019–09–30

Technical Validation

This section discusses the visualization of data to clarify the quality of the dataset, which includes missing data, outliers, and weekly pattern plots. The missing data plot and outlier information indicate the availability of minute details on the electricity consumption of each factory, whereas the weekly pattern plots provide the characteristic insights into power consumption according to the manufacturing type and working/non-working date conditions. The summary of manufacturing factories’ dataset statistics is described as shown in Table 7.

Table 7.

Summary of manufacturing factories’ dataset statistics.

Manufacturing factory Mean Standard deviation 0th percentile 25th percentile 50th percentile 75th percentile 100th percentile
Cement 1 1095 293 0 1008 1187 1277 2854
Cement 2 530 100 0 470 549 594 7482
Forge 1 57 48 0 2 81 102 188
Forge 2 54 35 0 6 67 82.6 119
Metal 1 124 73 6 29 154 190 259
Metal 2 369 224 0 73 451 543 786
Metal 3 111 80 0 26 115 179 294
Paper 480 88 0 420 521 554 857
Steel 1 47 36 0 13 35 78 131
Steel 2 7375 2705 0 5310 7872 9522 14966

Missing data

Figure 8 illustrates the missing electricity consumption data of 10 factories. The missing data plot for the entire data collection period (where the missing data are indicated using black lines) is shown on the left side of the figure. Further, the horizontal bars on the right visually represent the percentage of missing data over the study period. The manufacturing factories have an average data availability of 98.7%. An exception is the Metal 2 factory, whose missing data rate is more than 10% due to data collection errors in April 2019. Data with a 20% or less missing rate guarantees quality through missing data imputation29. The approach for time-series missing data imputation provided in this study is classified mainly into five categories: deletion, neighbor-based, regression-based, multi-layer-perceptron-based, and deep-learning-based approaches. The description and practical methods of each approach were reviewed in detail as shown in Table 83040.

Fig. 8.

Fig. 8

Missing electricity consumption data of 10 manufacturing factories; the missing data are indicated using black lines.

Table 8.

Summary of missing data imputation methods for time series data.

Approach Description Method
Deletion30,31 Elimination of observations with missing values in raw data Listwise deletion and pairwise deletion
Neighbour based32,33 Missing data imputation through neighbours identified by the clustering method KNN and DBSCAN
Regression based34,35 Missing data prediction by modelling correlations between a dependent variable and independent variables based on historical data AR, ARX, and ARIMA
Multi-layer perceptron based36,37 Missing data estimation by designing a model minimizing the loss function of fully connected network NLP and ANN
Deep learning based3840 Missing data prediction by designing network including information over time RNN and GRU

Outliers

Figure 9 illustrates the 10 factories’ daily electricity consumption profiles during data collection periods. As an index for outlier detection, the interquartile range (IQR) of the box plot was considered. As a result of extracting data located outside the range of 3 sigma of the normal distribution from each demand data, 4, 38, and 1 outlier were detected in Cement 1, Cement 2, and Paper, respectively. The approach for time-series outlier data detection provided in this study is classified into four categories: statistical, unsupervised discriminative, unsupervised parametric, and supervised approaches. The description and practical methods of each approach were reviewed in detail as shown in Table 94150. Accordingly, the authors propose to scale and utilize the raw data according to the research purpose.

Fig. 9.

Fig. 9

Electricity consumption daily profiles of 10 manufacturing factories during data collection periods.

Table 9.

Summary of outlier detection methods for time series data.

Approach Description Method
Statistical approach4143 Outlier detection through a function describing the relationships between a dependent variable and independent variables based on historical data ARMA, ARIMA, VARIMA, and EWMA
Unsupervised discriminative approach44,45 Outlier detection through similarity measurement based on clustering method K-means, SOM
Unsupervised parametric approach4648 Outlier detection through probabilistic model about state or value over time HMMs
Supervised approach49,50 Outlier detection through a model trained with labelled data SVM

Weekly patterns

Figure 10 shows the 10 factories’ weekly electricity consumption patterns, obtained by averaging the electricity consumption during the data collection period by day of the week. Each factory reveals approximate periodicity according to its own manufacturing process. The factories that implemented automated processes (Steel 2, Cement 1, and Cement 2) recorded a steady electricity use even on non-working days. The factories’ electricity consumption varied according to their size; for example, employees, sales, and production scale. In particular, factories with high electricity usage (Metal 2, Steel 2, and Cement 1) tended to avoid operating on time intervals with high electricity rates. Despite the limitation of the 7-month acquisition period, the characteristics of weekly demand usage were strongly confirmed.

Fig. 10.

Fig. 10

Weekly electricity consumption patterns of 10 manufacturing factories.

Figure 11 provides the factories’ electricity consumption profiles at the DR participation day (13 June 2019), which confirm the factories’ responded capacities. The capacity is calculated as the difference between the CBL (denoted using cyan lines in Fig. 11) and the actual load (denoted using red lines). The CBL is a general standard used for settlement in national DR markets. In this study, the factories’ average power consumption in the same time for four out of the past five days, excluding holidays, is considered the CBL. As additional information, Fig. 12 indicates the power system demand profile at the DR participation days (15 May and 13 June 2019) in South Korea.

Fig. 11.

Fig. 11

Manufacturing factories’ electricity consumption profiles at the demand response participation day (13 June 2019); cyan lines indicate customer baseline load (CBL), and red lines indicate the actual load.

Fig. 12.

Fig. 12

Power system demand profiles; cyan lines indicate average demand for the month, including the demand response participation days (15 May and 13 June 2019), and red lines indicate demand at the participation days.

Acknowledgements

The authors thank Dr. Keeyoung Nam from GridWiz, Inc., for supporting their work. Further, this research was funded by the Korea Institute of Energy Technology Evaluation and Planning and Ministry of Trade, Industry & Energy of the Republic of Korea (Grant Numbers: 20191210301930 and 20204010600340).

Author contributions

E. Lee and K. Baek contributed equally to this work. J. Kim managed and supervised this work.

Code availability

The code implementation was done in R 4.0.5 using R studio. The scripts to perform data visualization are available in28.

Competing interests

The authors declare no competing interests.

Footnotes

Publisher’s note Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

References

  • 1.International Renewable Energy Agency. Power system flexibility for the energy transition part 1: Overview for policy maker https://www.irena.org/publications/2018/Nov/Power-system-flexibility-for-the-energy-transition (2018).
  • 2.Olson A, Jones R, Hart E. Renewable curtailment as a power system flexibility resource. Electr. J. 2014;27:49–61. doi: 10.1016/j.tej.2014.10.005. [DOI] [Google Scholar]
  • 3.International Renewable Energy Agency. Renewable energy integration in power grids https://irena.org/publications/2015/Apr/Renewable-energy-integration-in-power-grids (2015).
  • 4.Alahäivälä A, Ekström J, Jokisalo J, Lehtonen M. A framework for the assessment of electric heating load flexibility contribution to mitigate severe wind power ramp effects. Electr. Power Syst. Res. 2017;142:268–278. doi: 10.1016/j.epsr.2016.09.026. [DOI] [Google Scholar]
  • 5.Kocaman AS, Ozyoruk E, Taneja S, Modi V. A stochastic framework to evaluate the impact of agricultural load flexibility on the sizing of renewable energy systems. Renew. Energy. 2020;152:1067–1078. doi: 10.1016/j.renene.2020.01.129. [DOI] [Google Scholar]
  • 6.Dranka GG, Ferreira P. Load flexibility potential across residential, commercial and industrial sectors in Brazil. Energy. 2020;201:117483. doi: 10.1016/j.energy.2020.117483. [DOI] [Google Scholar]
  • 7.UCI Machine Learning Repository, Individual household electric power consumption Data Set https://archive.ics.uci.edu/ml/datasets/individual+household+electric+power+consumption# (2012).
  • 8.Makonin S, Ellert B, Bajić IV, Popowich F. Electricity, water, and natural gas consumption of a residential house in Canada from 2012 to 2014. Sci. Data. 2016;3:1–12. doi: 10.1038/sdata.2016.37. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 9.National Renewable Energy Laboratory, Multifamily programmable thermostat data https://data.openei.org/submissions/500 (2015).
  • 10.Kleiminger, W., Beckel, C. & Santini, S. ECO data set (electricity consumption & occupancy) https://www.vs.inf.ethz.ch/res/show.html?what=eco-data (2016).
  • 11.Nambi, A. S. DRED: Dutch Residential Energy Dataset (DRED) http://www.st.ewi.tudelf.nl/akshay/dred (2015).
  • 12.Kolter, J. Z. & Johnson, M. J. REDD: A public data set for energy disaggregation research. Workshop on Data Mining Applications in Sustainability (SIGKDD), San Diego, CA, 25, 59-62 (2011).
  • 13.Kelly J, Knottenbelt W. The UK-DALE dataset, domestic appliance-level electricity demand and whole-house demand from five UK homes. Sci. Data. 2015;2:1–14. doi: 10.1038/sdata.2015.7. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 14.Shin C, et al. The ENERTALK dataset, 15 Hz electricity consumption data from 22 houses in Korea. Sci. Data. 2019;6:1–13. doi: 10.1038/s41597-018-0005-2. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 15.Miller, C. ENERNOC commercial building dataset http://cargocollective.com/buildingdata/100-EnerNOC-Commercial-Buildings (2012).
  • 16.Pipattanasomporn M, et al. CU-BEMS, smart building electricity consumption and indoor environmental sensor datasets. Sci. Data. 2020;7:1–14. doi: 10.1038/s41597-020-00582-3. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 17.Martins PDM, Nascimento VB, Freitas AR, Silva PB, Pinto RGD, 2018. Industrial machines dataset for electrical load disaggregation. IEEE Dataport. [DOI]
  • 18.Valdes, J. & Camargo, L. R. Synthetic hourly electricity load data for the paper and food industries. Data Brief. 35 (2021). [DOI] [PMC free article] [PubMed]
  • 19.Depart of Energy, Benefits of demand response in electricity markets and recommendations for achieving them https://www.energy.gov/oe/downloads/benefits-demand-response-electricity-markets-and-recommendations-achieving-them-report (2006).
  • 20.MISO, Business practices manuals https://www.misoenergy.org/legal/business-practice-manuals/ (2021).
  • 21.NYISO, Manual 05: NYISO day-ahead demand response program manual https://www.nyiso.com/manuals-tech-bulletins-user-guides (2020).
  • 22.NYISO, Manual 07: Emergency demand response program manual https://www.nyiso.com/manuals-tech-bulletins-user-guides (2022).
  • 23.PJM, PJM Manual 11: Energy and ancillary service market operations https://www.pjm.com/library/manuals.aspx (2021).
  • 24.KEMA, PJM empirical analysis of demand response baseline methods https://www.pjm.com/-/media/markets-ops/demand-response/pjm-analysis-of-dr-baseline-methods-full-report.ashx (2011).
  • 25.ERCOT, Demand response baseline methodologies https://www.ercot.com/services/programs/load (2019).
  • 26.Korea power exchange, Electricity market operation rules https://new.kpx.or.kr/board.es?mid=a10205010000&bid=0030&act=view&list_no=65906 (2022).
  • 27.Industrial statistics analysis system, the number of factories (manufacture type) https://istans.or.kr/su/newSuTab.do?scode=S53 (2019).
  • 28.Kim J, 2021. Datasets on South Korean manufacturing factories’ electricity consumption and demand response participation. Figshare. [DOI] [PMC free article] [PubMed]
  • 29.Ponoćko J, Milanović JV. Forecasting demand flexibility of aggregated residential load using smart meter data. IEEE Trans. Power Syst. 2018;33:5446–5455. doi: 10.1109/TPWRS.2018.2799903. [DOI] [Google Scholar]
  • 30.McKnight, P. E., McKnight, K. M., Figueredo, A. J. & Sidani, S. Missing data: a gentle introduction (Guilford Press, 2007).
  • 31.Wothke, W. Longitudinal and multigroup modeling with missing data (2000).
  • 32.Batista GE, Monard MC. A study of K-nearest neighbour as an imputation method. His. 2002;87:251–260. [Google Scholar]
  • 33.Amiri M, Jensen R. Missing data imputation using fuzzy-rough methods. Neurocomputing. 2016;205:152–164. doi: 10.1016/j.neucom.2016.04.015. [DOI] [Google Scholar]
  • 34.Box, G. E., Jenkins, G. M., Reinsel, G. C. & Ljung, G. M. Time series analysis: forecasting and control (John Wiley & Sons, 2015).
  • 35.Zhang GP. Time series forecasting using a hybrid ARIMA and neural network model. Neurocomputing. 2003;50:159–175. doi: 10.1016/S0925-2312(01)00702-0. [DOI] [Google Scholar]
  • 36.Nordbotten S. Neural network imputation applied to the Norwegian 1990 population census data. JOURNAL OF OFFICIAL STATISTICS-STOCKHOLM. 1996;12:385–402. [Google Scholar]
  • 37.Sharpe PK, Solly RJ. Dealing with missing values in neural network-based diagnostic systems. Neural Computing & Applications. 1995;3:73–77. doi: 10.1007/BF01421959. [DOI] [Google Scholar]
  • 38.Che Z, Purushotham S, Cho K, Sontag D, Liu Y. Recurrent neural networks for multivariate time series with missing values. Scientific reports. 2018;8:1–12. doi: 10.1038/s41598-018-24271-9. [DOI] [PMC free article] [PubMed] [Google Scholar]
  • 39.Luo Y, Cai X, Zhang Y, Xu J. Multivariate time series imputation with generative adversarial networks. Advances in neural information processing systems. 2018;31:1603–1614. [Google Scholar]
  • 40.Luo, Y., Zhang, Y., Cai, X. & Yuan, X. E2gan: End-to-end generative adversarial network for multivariate time series imputation Proceedings of the 28th international joint conference on artificial intelligence 3094-3100 (2019).
  • 41.Barnett, V. and Lewis, T. Outliers in Statistical Data (Wiley, 1978).
  • 42.Hawkins, D. M. Identification of outliers Vol. 11 (Springer, 1980).
  • 43.Rousseeuw, P. J. & Leroy, A. M. Robust regression and outlier detection (John wiley & sons, 2005).
  • 44.Rebbapragada U, Protopapas P, Brodley CE, Alcock C. Finding anomalous periodic time series. Machine learning. 2009;74:281–313. doi: 10.1007/s10994-008-5093-3. [DOI] [Google Scholar]
  • 45.Yan X. Multivariate outlier detection based on self-organizing map and adaptive nonlinear map and its application. Chemometrics and Intelligent Laboratory Systems. 2011;107:251–257. doi: 10.1016/j.chemolab.2011.04.007. [DOI] [Google Scholar]
  • 46.Florez-Larrahondo, G., Bridges, S. M. & Vaughn, R. Efficient modeling of discrete events for anomaly detection using hidden markov models International Conference on Information Security 506-514 (2005).
  • 47.Gao B, Ma HY, Yang YH. Hmms (hidden markov models) based on anomaly intrusion detection method. International Conference on Machine Learning and Cybernetics. 2002;1:381–385. doi: 10.1109/ICMLC.2002.1176779. [DOI] [Google Scholar]
  • 48.Qiao Y, Xin XW, Bin Y, Ge S. Anomaly intrusion detection method based on HMM. Electronics letters. 2002;38:663–664. doi: 10.1049/el:20020467. [DOI] [Google Scholar]
  • 49.Tian S, Mu S, Yin C. Sequence-similarity kernels for SVMs to detect anomalies in system calls. Neurocomputing. 2007;70:859–866. doi: 10.1016/j.neucom.2006.10.017. [DOI] [Google Scholar]
  • 50.Wang M, Zhang C, Yu J. Native API based windows anomaly intrusion detection method using SVM. International Conference on Sensor Networks, Ubiquitous, and Trustworthy Computing (SUTC'06) 2006;1:6. doi: 10.1109/SUTC.2006.1636153. [DOI] [Google Scholar]

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Data Citations

  1. Martins PDM, Nascimento VB, Freitas AR, Silva PB, Pinto RGD, 2018. Industrial machines dataset for electrical load disaggregation. IEEE Dataport. [DOI]
  2. Kim J, 2021. Datasets on South Korean manufacturing factories’ electricity consumption and demand response participation. Figshare. [DOI] [PMC free article] [PubMed]

Data Availability Statement

The code implementation was done in R 4.0.5 using R studio. The scripts to perform data visualization are available in28.


Articles from Scientific Data are provided here courtesy of Nature Publishing Group

RESOURCES