Correction to: Marine Biotechnology https://doi.org/10.1007/s10126-022-10162-8
The original online version of this article was revised: In the Results section, the sentence 'Production of FU –1 also requires 8.360 m3 of freshwater and 137.9 kWh of electricity.', the unit '137.9 kWh' should instead be '54.48 kWh'.
The original article has been corrected.
Footnotes
Publisher's Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Contributor Information
Asaf Tzachor, Email: at875@cam.ac.uk.
Asger Smidt-Jensen, Email: asje@teknologisk.dk.
Alfons Ramel, Email: alfons@matis.is.
Margrét Geirsdóttir, Email: mg@matis.is.
