Abstract

Maintaining the cement sheath mechanical integrity is the key to ensuring the benefit and safety of oil and gas well drilling and production. The main function of the cement sheath is to isolate oil and gas from water layers, which prevents the formation fluid from channeling to other layers. At present, how to effectively evaluate the cement sheath sealing performance is the fundamental problem to be solved urgently. This paper first carried out the cement sheath annulus isolation experiment and analyzed the main forms of cement sheath seal failure. Then, the interaction of the cement sheath, casing, and surrounding rock in the initial state and subsequent wellbore operations was explained. An analysis model for the cement sheath mechanical integrity incorporating the nonlinear elastic constitutive equation was proposed. Based on the statistical damage variable in continuum mechanics theory, a damage variable was established. The results show that the main form of cement sheath integrity failure is tensile crack damage and micro-annulus caused by plastic yielding. The damage variable can quantitatively describe the cement sheath mechanical integrity. The field case analysis shows that the damage variable is highly correlated with wellbore pressure and also verifies the applicability of the variable. Reducing wellbore pressure will help maintain the mechanical integrity of the cement sheath, providing sealing performance. This research can provide a reference for designing the mechanical properties of the cement sheath and improving the sealing ability of the cement sheath.
1. Introduction
Portland cement stone is a brittle material with congenital defects. During the drilling and production of oil and gas wells, under the action of the surrounding rock stress and wellbore stress,1,2 the cement sheath is easily broken to form macroscopic cracks, which become gas channeling paths and cause sustained casing pressure.3−5 Maintaining the sealing integrity of the cement sheath is the key to ensuring the long-term safe production of oil and gas wells, and how effectively evaluating the sealing performance of the cement sheath is a basic problem that needs to be solved urgently.6 At present, the direct way is to evaluate the damage and failure mode of the cement sheath through annulus isolation simulation experiments.
The general practice7−10 of the annulus isolation simulation experiment is to use full-size casing to form an inner and outer cylinder and inject cement slurry between the inner and outer cylinders to become a cement sheath. The sealing performance of cement sheath is investigated by simulating the pressure change by pressurizing or depressurizing inside the inner barrel, or simulating the downhole temperature change by heating and cooling inside the inner barrel. The application of the cement sheath seal integrity evaluation device intuitively shows the failure form of the cement sheath, and the established devices can be divided into full-scale devices and non-full-scale devices. The design of the full-scale device is mainly based on the size of the casing and the cement sheath in the cementing interval of the oil layer, while the non-full-scale device adopts the equivalent stress theory to restore the stress environment of the cement sheath in the downhole.
In 1992, Goodwin and Crook7 established a simulated wellbore with two layers of casing inside and outside, and a cement sheath was formed between the two layers of casing by grouting and curing. The effect of the stress–strain process of the casing and the cement sheath on the sealing ability of the assembly was tested by gradually increasing the casing pressure. The experiment results prove that tensile crack damage is one of the main forms of cement sheath integrity failure. In 1993, Jackson and Murphey8 also produced a similar simulation device by gradually increasing the casing pressure and then depressurizing it to a stable value to test the sealing ability of the cement sheath under cyclic loading and unloading conditions. The experiment results prove that plastic yielding is one of the main ways of cement sheath sealing failure. Physical experiments by Boulkhelifa et al.,9 Li et al.,11 and numerical simulations by Zhou et al.12 also demonstrated tensile crack damage and plastic yielding of cement sheath.
From previous research, it can be concluded that the main form of cement sheath integrity failure is tensile crack damage and micro-annulus caused by plastic yielding. The long cycle and high cost of the annulus isolation experiment lead to limitations in field applications. Therefore, in this research, aiming at the failure mechanism of cement sheath integrity, laboratory experiments are carried out to test the failure modes of cement sheath. Then, based on the continuum mechanics theory, the damage variable is established. Finally, the field application is used as the inspection standard to achieve the purpose of effectively evaluating the cement sheath integrity.
2. Experiment Materials and Methods
2.1. Cement Slurry System
Two kinds of cement slurry systems with the same density are mainly tested, one of which is an elastic cement slurry system. The detailed ingredient is as follows:
-
(1)
1.90 g/cm3 elastic cement (type B): Grade G cement + flexible anti-channeling agent + fiber + dispersant + fluid loss reducer + retarder + defoamer + water (W/S = 0.503), referred to as B190;
-
(2)
1.90 g/cm3 pure cement: Grade G cement + dispersant + stabilizer + fluid loss agent + defoamer + water (W/S = 0.38), referred to as Y190.
The curing conditions of the cement slurry are room temperature (20 °C) and pressure (0.1 MPa), and time of 7 days. The basic physical properties of the two types of cement stone are shown in Table 1.
Table 1. Basic Physical Properties of Cement Stone.
| cement stone | compressive strength (MPa) | Young’s modulus (GPa) | Poisson ratio |
|---|---|---|---|
| B190 | 24.70 | 6.50 | 0.27 |
| Y190 (pure cement) | 31.01 | 6.25 | 0.35 |
2.2. Annular Isolation Simulation Device
The device used in this research is the cement sheath annulus isolation simulation device designed by China Chuanqing Downhole Operation Company, as shown in Figure 1. The simulated wellbore is composed of 5″ inner casing, 7″ outer casing, upper and lower sealing caps, and pressurizing components. Injecting cement slurry between the two layers of casing can form a cement sheath. The inside of the 5″ inner casing can be pressurized and depressurized for simulating the pressure change in the downhole casing. Air pressure is applied between the 5″ inner casing and the 7″ outer casing to test the sealing ability of the cement sheath. The loading and unloading process of the cement sheath in the well is simulated by adjusting the pressure rise and fall inside the casing. During the experiment, if the gas flow rate was monitored by a gas flowmeter, it indicated that the cement sheath failed to seal, and the gas channeling path had appeared at the casing-cement sheath interface, cement sheath-formation interface, or the cement sheath body. The working pressure of the inner casing of the device can reach 70 MPa, the maximum working temperature is 90 °C, and the simulated wellbore height is 1 m.
Figure 1.
Cement sheath annular isolation simulation device designed by China Chuanqing Downhole Operation Company: (a) simulated wellbore, (b) main control box, and (c) structure diagram.
2.3. Experiment Process and Results
The annular isolation simulation experiment was carried out on the typical cement Y190 and B190 mentioned above with this device. The confining pressure during the experiment was 0 MPa and did not change with the casing’s internal pressure. The process and results are explained below.
2.3.1. Y190 Annular Isolation Simulation Test
The Y190 cement slurry was injected between the 5″ and 7″ casings and cured at room temperature and pressure for 7 days. Then, the following steps were carried out: (1) the casing internal pressure was raised to 40 MPa; (2) 2 MPa air pressure was applied in the cement sheath annular space to test gas channeling.
The test phenomenon is as follows: (1) When the casing internal pressure rises to 35 MPa, a clear sound of cement ring rupture is heard; (2) After the pressure test is completed, the pressure is released, and gas channeling is found immediately after 2 MPa air pressure is applied to the annular space; there is still gas channeling when the pressure drops to 1 MPa. Then, the simulated wellbore was cut into transverse and longitudinal sections to observe the failure form of the cement sheath, as shown in Figure 2.
Figure 2.

Cutting results of the Y190 cement sheath simulated wellbore: (a) transverse section view and (b) longitudinal section view.
Figure 2a transverse section view shows that under the action of casing internal pressure, radial cracks extending from the outer wall of the 5″ casing to the inner wall of 7″ casing were generated on the circumference of the cement sheath. From the stress–strain principle of thick-walled cylinders, this is an obvious tensile crack damage (or tensile failure). What casing pressure destroys is the tensile strength, which is one of the weakest strengths of cement sheath.
Figure 2b longitudinal section view shows that this transverse radial crack extends along the axial direction and runs through the entire simulated wellbore, proving that the cement sheath body crack is the direct cause of gas channeling.
2.3.2. B190 Annular Isolation Simulation Test
The curing method and test steps of the B190 cement sheath are the same as those of Y190. The test phenomenon is as follows: (1) When the casing internal pressure rises to 40 MPa, no obvious cracking sound is heard; (2) After the pressure was released, 2 MPa air pressure was applied in the annular space, and gas channeling occurred after waiting for 10 min. Then, the simulated wellbore was cut into transverse and longitudinal sections, as shown in Figure 3.
Figure 3.

Cutting results of B190 cement sheath simulated wellbore: (a) transverse section view, and (b) longitudinal section view.
From the transverse and longitudinal section view, no directly observable macroscopic cracks were found. However, when 1.8 MPa air pressure was applied in the annular space, gas channeling was still found after 10 min, indicating that there was a channeling path. It is speculated that the channeling path is the micro-annulus existing in the annulus. Because B190 is a modified cement, the tensile strength is improved, and B190 undergoes plastic yield with the increase of casing internal pressure. After the pressure is released, the inner casing shrinks, and the first cemented surface cannot be recovered, forming a micro-annulus.
The B190 annulus isolation simulation test shows that the plastic yield of cement sheath is also the integrity failure form of the cement sheath.
The results obtained from the above tests are consistent with the existing knowledge about the failure form of cement sheaths. The tensile crack damage of cement sheath and the generation of micro-annulus by plastic yielding are the main behaviors of cement sheath integrity failure. However, this experiment also uses gas permeability as an evaluation variable, and there are similar problems, namely, long test periods and high cost.
Therefore, according to the experimental phenomena, we propose a cement sheath integrity failure model based on the continuum mechanics theory and establish damage variables to analyze the two main forms of cement sheath integrity failure.
3. Cement Sheath Mechanical Integrity Analysis Model
It is assumed that the casing is centered, the wellbore is a regular circle, and the in-situ stress is uniform. According to Saint-Marc’s13 initial stress state model of cement sheath and the consensus on initial stress of cement sheath by Bois,14,15 Bosma,16 etc., the initial stress state of cement sheath is set as the hydrostatic pressure state in this research. That is, when the cement sheath is formed, the outward interaction force with the formation rocks around the wellbore is the hydrostatic column pressure, and the inward interaction force with the casing’s outer wall is also the hydrostatic column pressure.
3.1. Interaction of Cement Sheath, Casing, and Surrounding Rock in the Initial State
In the initial state (at the end of the setting stage), the force schematic diagram of the casing-cement sheath-surrounding rock is shown in Figure 4.
Figure 4.
Schematic of the casing force in the initial state.
3.1.1. Casing
The initial pressure of the casing’s inner wall is p1i, that is, the pressure of the drilling fluid column. The initial force between the casing’s outer wall and the cement sheath’s inner wall is p2i, that is, the hydrostatic column pressure. r1 is the casing’s inner radius and r2 is the casing’s outer radius.
According to the mechanics principle of the axisymmetric plane strain problem,17 the casing stress distribution is as follows:
![]() |
1 |
3.1.2. Cement Sheath
The initial force between the cement sheath’s inner wall and the casing’s outer wall is p2i, that is, the hydrostatic column pressure. The initial force between the cement sheath’s outer wall and the surrounding rock’s inner wall is p3i, which is also the hydrostatic column pressure. r2 is the cement sheath’s inner radius and r3 is the cement sheath’s outer radius.
Cement sheath stress distribution:
![]() |
2 |
3.1.3. Surrounding Rock
The initial force between the surrounding rock’s inner wall and the cement sheath’s outer wall is p3i, that is, the hydrostatic column pressure. The force on the surrounding rock’s outer wall is p4, that is, the in-situ stress of the far formation. Therefore, the value of r4 must be large enough, and it should be far away from the stress concentration area around the wellbore, so that p4 can be treated as far-ground stress. Generally, it is more than 10 times larger than the wellbore radius. In this research, r4 is taken as 100 times the wellbore radius. r3 is the wellbore radius.
Surrounding rock stress distribution:
![]() |
3 |
3.2. Interaction of Cement Sheath, Casing, and Surrounding Rock in Subsequent Wellbore Operations
Subsequent wellbore operations, such as pressure testing, replacement of working fluid in the well, acid fracturing, and hollowing out for production, are all carried out on the initial state of the wellbore after the end of the setting stage. The casing pressure in subsequent operations can be regarded as an increment Δp1 above the drilling fluid column pressure at the end of the settling stage. Correspondingly, the forces acting on the casing-cement sheath and cement sheath-formation bonding surfaces will generate increments Δp2 and Δp3.The in-situ stress will not change, its increment Δp4 = 0, as shown in Figure 5.
Figure 5.
Schematic of the interfacial force superposition relationship of the casing, cement sheath, and surrounding rock during subsequent wellbore operations.
The forces on the two interfaces can be decomposed as follows:
![]() |
4 |
To get the interaction forces p2 and p3 of the cement sheath, casing and surrounding rock under subsequent wellbore operations from eq 4, the increments Δp2 and Δp3 must be obtained first. The casing-cement sheath-surrounding rock composite model is established for the interfacial force increment (see the right side of the equation in Figure 5). The interfacial force increment is small relative to the initial state. The deformation of casing, cement sheath, and surrounding rock is also very small, which satisfies the small deformation condition. The linear elastic constitutive model is applicable to the casing, cement sheath, and surrounding rock.
According to the mechanics principle of the axisymmetric plane strain problem under the linear elastic constitutive relation, the radial displacement formula under the interface force increment is as follows:
3.2.1. Casing Radial Displacement Formula
| 5 |
The radial displacement at the casing’s outer wall (r = r2) is
| 6 |
where
![]() |
3.2.2. Cement Sheath Radial Displacement Formula
| 7 |
The radial displacement at the cement sheath’s inner wall (r = r2) is
| 8 |
where
![]() |
The radial displacement at the cement sheath’s outer wall (r = r3) is
| 9 |
where
![]() |
3.2.3. Surrounding Rock Radial Displacement Formula
| 10 |
The radial displacement at the borehole wall (r = r3) is
| 11 |
where
![]() |
According to the radial displacement continuous condition of casing-cement sheath-surrounding rock combination, at r = r2 position, uc2 = us2; at r = r3 position, us3 = uf3. Therefore,
| 12 |
![]() |
13 |
3.3. Damage Variable of Cement Sheath
The linear elastic constitutive equation has a limited effective range in describing the mechanical behavior of the cement sheath. As shown in Figure 6a, the linear elastic constitutive equation is accurate in the linear deformation stage before yield strength. However, in the nonlinear deformation stage between the yield strength and the ultimate strength, the results described by the linear elastic constitutive equation have large errors. Therefore, the linear elastic constitutive equation can be used to judge whether the cement sheath has yielded,18 but only for the cement sheath’s inner wall, as shown in Figure 6b. The reasons are as follows: (1) the inner wall of the cement sheath yields first, and the material properties of the inner wall deviate from the linear elastic segment after yielding. If the linear elastic constitutive equation is still used to describe the yielding inner wall of the cement sheath, it is inaccurate to calculate whether the outer cement sheath has yielded or not. (2) Similarly, when yielding further extends to the outer wall of the cement sheath, if the yielded part is still described by the linear elastic constitutive equation, it is also inaccurate to calculate whether the unyielded part yields or not. Therefore, the position where the linear elastic constitutive equation can accurately judge whether to yield or not is only the inner wall of the cement sheath.
Figure 6.
Schematic of the linear elastic constitutive equation describing cement sheath mechanical properties: (a) effective range of linear elastic constitutive equations and (b) plastic yield of the cement sheath inner wall.
Only the plastic yielding of the cement sheath inner wall is not enough to indicate that the mechanical integrity of the cement sheath has been destroyed. This should be demonstrated based on whether most of the cement sheath’s material functions are intact. In this research, the damage variables in the continuum mechanics theory are used to describe the failure of the cement sheath material function and to measure the mechanical integrity of the cement sheath.
In terms of the microstructure, there are defects inside the material, such as microvoids and microcracks. The mechanical properties and stress–strain response of most engineering materials are largely attributed to microdefects within the material. There are also microdefects in concrete and cement stone. From a microscopic analysis, the nonlinear stress–strain characteristics of concrete and cement stone are mainly due to the generation and aggregation of microcracks. The generation and accumulation of microcracks will gradually reduce the strength and reduce the bearing capacity. Ultimately, the microcracks aggregate into large cracks, which penetrate through the concrete or cement stone to break and shatter, and the strength is completely lost. This is a process of gradual deterioration of material properties, and the degree of deterioration can be described by the damage variable of the continuum damage theory.19 The continuum damage theory20 holds that the response of the material depends only on the current state of the microstructural arrangement, which can be described by a set of internal variables, which are called damage variables.
As shown in Figure 7, taking the cement sheath as an example, Eis is defined as the Young’s modulus of the initial linear stage, Es is Young’s modulus after the cement sheath stress exceeds the yield strength, and Ers is the residual Young’s modulus at which the cement sheath stress reaches the ultimate strength (fractured or crushed). When the stress is lower than the yield strength, the deformation of the cement sheath is in the linear elastic stage. The cement sheath is not damaged, the material function is intact, and the mechanical integrity is maintained, so the damage variable d is 0.
Figure 7.

Schematic of the damage process of cement sheath stiffness.
On the contrary, when the stress reaches or exceeds the ultimate strength, the cement sheath begins to crack or even crush. The material function of the cement sheath is damaged to a certain stage, and it can still bear the residual load, but the mechanical integrity of the cement sheath has been completely lost, so the damage variable d is 1.
Most importantly, when 0 < d < 1, the cement sheath is in the nonlinear deformation stage and the stiffness (Young’s modulus) of the cement sheath begins to decrease. The graph shows that the slope of the red line begins to decrease. This indicates that the material function of the cement sheath is damaged and the mechanical integrity is gradually lost. The microscopic manifestation is that microcracks begin to generate and aggregate. Therefore, the damage process can be described in terms of the reduction rate of Young’s modulus.
Therefore, the damage variable of the cement sheath mechanical integrity is defined as follows:
![]() |
14 |
where d is the damage variable of the cement sheath mechanical integrity, Es is the Young’s modulus in the damage stage, Eis is the undamaged Young’s modulus, and Ers is the residual Young’s modulus. The three Young’s moduli are all secant moduli, as shown in Figure 7. It can be seen that the mechanical integrity of the cement sheath can be quantitatively described by the damage variable d.
The initial Young’s modulus Eis and residual Young’s modulus Ers used in solving the equation of d can be determined by mechanical tests of cement sheath. Young’s modulus Es in the damage stage is the variable Young’s modulus of the cement sheath in the nonlinear deformation stage, which can be determined by the nonlinear elastic description equation. See Appendix for the solution model and calculation formula.
3.4. Forms of Cement Sheath Integrity Failure
According to the simulation experiment of cement sheath annulus isolation, the main failure forms of cement sheath are tensile crack damage and micro-annulus caused by plastic yielding, and the criteria for judging these two failure forms are the maximum tensile stress criterion and the Mohr–Coulomb criterion.21−23 Therefore, the mechanical integrity analysis model of the cement sheath uses the linear elastic constitutive equation to calculate the stress distribution of the cement sheath and qualitatively judges the mechanical integrity of the cement sheath according to the maximum tensile stress criterion and the Mohr–Coulomb criterion. Finally, the damage variable d is used to quantitatively judge the mechanical integrity of the cement sheath.
According to the qualitative and quantitative judgment methods of the cement sheath mechanical integrity analysis model, the interpretations13,24 of the calculation results are determined as follows:
-
(1)
When the stress calculated by the model meets the maximum tensile stress criterion, that is, one of the three principal stresses in the cement sheath, the radial principal stress, the circumferential principal stress, or the axial principal stress, is greater than the tensile strength of the cement sheath. The cement sheath will be damaged by tensile cracks. Interpret this situation as tensile crack, as shown in Figure 8.
-
(2)
When the radial stress in the model calculation results is tensile stress on the first cementation surface, the casing and cement sheath will be debonding due to the low transverse bonding strength of the cement sheath (usually 2–3 MPa). Interpret this situation as casing debonding micro-annulus, as shown in Figure 9.
-
(3)
When the calculated stress results of the model satisfy the Mohr–Coulomb criterion, the cement sheath will yield plastically. If the casing’s internal pressure decreases, the casing will shrink and a micro-annulus will be created on the first cementation surface. Because of the premise of casing shrinkage, this situation is interpreted as casing shrinking micro-annulus, as shown in Figure 9.
-
(4)
The mechanical integrity of the cement sheath is quantitatively described by the damage variable d, as shown in Figure 10. When 0 < d < 1, the cement sheath has different degrees of damage, the greater the value of d, the higher the degree of damage. When d = 1, the cement sheath has been cracked or even crushed, the mechanical integrity is completely lost.
Figure 8.

Schematic of cement sheath tensile crack damage: (a) cross section and (b) longitudinal section.
Figure 9.

Schematic of casing debonding or shrinking micro-annulus: (a) cross section and (b) longitudinal section.
Figure 10.

Schematic of cement sheath damage when 0 < d ≤ 1: (a) cross section and (b) longitudinal section.
4. Results and Discussion
4.1. Parameters of the Cement Sheath Mechanical Integrity Analysis Model
Take the Longgang X well in the Longgang gas field in Sichuan as an example. The cement sheath of 127 mm oil layer casing at the depth of 6000 m well was selected to analyze its mechanical integrity under different downhole conditions.
The cement slurry system for 127 mm oil layer casing cementing in Longgang X well is Grade G cement + high temperature stabilizer + micro silica fume + 3% SDP-1 + 1.5% SD66 + 2.7% FS-31L + 5% SD10 + 0.44 W/C. The cement slurry was prepared in the laboratory for mechanical testing, and the cement and water used were those taken on-site during the cementing of Well X.
According to the standard GB19139 “Test Method for Oil Well Cement”, the maximum pressure for cement stone curing is 20.7 MPa. At present, the optimal pressure set by the curing kettle is also 20.7 MPa, which cannot simulate the hydrostatic pressure of 60 MPa. The curing pressure of the cement stone has not reached 60 MPa, and it is not suitable to add 60 MPa confining pressure for the triaxial stress test of the cement stone. Therefore, the maximum pressure of 20.7 MPa specified by the standard is adopted as the curing pressure of the cement sheath and the confining pressure of the triaxial stress test.
According to the determined pressure and downhole measured temperature, set the curing conditions of cement stone: 130 °C × 21 MPa × 7 days.
The conditions of the triaxial stress test are 130 °C × 20 MPa and 130 °C × 10 MPa, and the confining pressure is changed to measure the cohesion and internal friction angle of the cement stone.
Curing conditions for the tensile strength test: 130 °C × 21 MPa × 7 days.
The main input parameters of the cement sheath mechanical integrity analysis model are tensile strength, cohesion, internal friction angle, Young’s modulus, Poisson’s ratio, fitted bulk modulus, and shear modulus of the cement sheath; yield strength, Young’s modulus, and Poisson’s ratio of the casing; Young’s modulus and Poisson’s ratio of the formation. The geometric parameters are the inner and outer diameter of the casing and the radius of the wellbore. These parameters are divided into experimental measurement data and fitting parameters, as described below.
4.1.1. Experimental Measurement Data
The triaxial stress–strain curves of cement stone samples under 10 and 20 MPa confining pressure are shown in Figure 11. The strength parameters under different confining pressures are read from the curves, and the calculation method19 given in the literature17 is used to obtain the cohesive force and internal friction angle of the cement stone, as shown in Table 2.
Figure 11.

Triaxial stress–strain curves of cement stone under different confining pressures.
Table 2. Strength Parameters, Cohesion, and Internal Friction Angle of Cement Stone.
| yield
strength (MPa) |
calculation
results |
|||
|---|---|---|---|---|
| confining pressure (MPa) | differential stress | axial stress | cohesion (MPa) | internal friction angle (deg) |
| 10 | 21 | 31 | 0.415 | 35.74 |
| 20 | 34 | 54 | ||
Based on the stress–strain curve of the cement stone under 20 MPa confining pressure (as shown in Figure 11), the initial Young’s modulus, Poisson’s ratio, and residual Young’s modulus under the ultimate load of the linear segment were calculated. The tensile strength is determined according to GB19139 “Test Method for Oil Well Cement”. Young’s modulus, Poisson’s ratio, and tensile strength are shown in Table 3.
Table 3. Mechanical Parameters of Cement Stone.
| initial Young’s modulus (MPa) | initial Poisson’s ratio | residual Young’s modulus (MPa) | tensile strength (MPa) |
|---|---|---|---|
| 7653.30 | 0.092 | 2238.94 | 2.3 |
4.1.2. Fitting Parameters
The stress–strain
curves of the triaxial stress test at a confining pressure of 20 MPa
and a temperature of 130 °C were fitted with the bulk modulus
and shear modulus functions. The bulk modulus fitting function form
is
, and the shear modulus fitting function
form is Gs = b(γoct – c)n. The fitting graph is shown in Figure 12, and the coefficient fitting results and
fitting effect quantification parameters (reduced Chi-square and adjusted
R-square) are shown in Table 4. It can be seen from the two quantification parameters that
the fitting effect is quite good.
Figure 12.

Function fitting of cement stone (a) bulk modulus and (b) shear modulus.
Table 4. Fitting Results of Cement Stone Bulk Modulus and Shear Modulus.
| Bulk Modulus: Ks = aεoctm | |||
|---|---|---|---|
| fit
coefficients |
|||
| a | m | reduced χ2 | adjusted R2 |
| 0.88398 | –0.95891 | 0.96701 | 0.99853 |
| Shear Modulus: Gs = b(γoct – c)n | ||||
|---|---|---|---|---|
| fit
coefficients |
||||
| b | c | n | reduced χ2 | adjusted R2 |
| 2.49435 | 2.155 × 10–4 | –0.27723 | 0.36249 | 0.96404 |
According to the cementing design of 127 mm oil layer casing in the Longgang X well, the parameters of casing and formation (the rock is limestone) can be obtained; see Table 5 for details.
Table 5. Physical Parameters of Casing and Formation.
| parameter | value | parameter | value |
|---|---|---|---|
| casing inner diameter | 54.31 mm | casing steel grade | TP110TS |
| casing outer diameter | 63.5 mm | casing Young’s modulus | 206.85 × 103 MPa |
| wellbore radius | 82.0 mm | casing Poisson’s ratio | 0.3 |
| casing yield strength | 758.3 MPa | formation Young’s modulus | 54.12 × 103 MPa |
| formation Poisson’s ratio | 0.218 |
4.2. Cement Sheath Mechanical Integrity Analysis under Different Conditions
From the end of the setting stage to the production stage, the wellbore operating conditions mainly include the initial state, pressure test, acid fracturing, clear water kill, and casing hollowing out. Taking the initial state as the starting point, all the working conditions are regarded as independent, and the cement sheath mechanical integrity under these working conditions is analyzed separately. In this way, it is determined under which operating conditions the cement sheath mechanical integrity faces the greatest risk, and the damage degree is quantified.
4.2.1. In the Initial State
In the setting stage, the drilling fluid density is 1.3 g/cm3, and the pressure at the 6000 m downhole is about 76.5 MPa. In the initial state at the end of the setting stage, the inner pressure of the casing at 6000 m is 76.5 MPa, and the hydrostatic column pressure is about 60 MPa on the inner and outer cementation surfaces of the cement sheath (the subsequent operating conditions are the same).
4.2.1.1. Cement Sheath Tensile Crack
The above Figure 13a shows that the check value of the maximum tensile stress criterion of the cement sheath in the initial state calculated by the cement sheath mechanical integrity analysis model is all less than 0, and it is judged that there will be no tensile cracks in the initial state.
Figure 13.
Calculation results in the initial state: (a) cement sheath tensile cracks, (b) casing debonding micro-annulus, (c) casing shrinking micro-annulus, and (d) cement sheath damage variable.
4.2.1.2. Casing Debonding Micro-Annulus
The above Figure 13b shows that the radial stress of the cement sheath in the initial state is all less than 0, which is all compressive stress. It is judged that there will be no casing debonding micro-annulus in the initial state.
4.2.1.3. Casing Shrinking Micro-Annulus
The above Figure 13c shows that the Mohr–Coulomb criterion check value of the cement sheath in the initial state is all greater than 0, indicating that the cement sheath has undergone plastic yielding, and if the casing shrinks, a micro-annulus will appear on the casing-cement sheath interface. It is judged that the casing shrinkage micro-annulus will appear in the initial state.
4.2.1.4. Damage Variable of Cement Sheath Mechanical Integrity
The above Figure 13d shows that the damage variable of the cement sheath mechanical integrity in the initial state calculated by the cement sheath mechanical integrity analysis model has reached more than 0.9. The cement sheath is on the verge of breaking, and the mechanical integrity has lost 90%. The calculated results are in good agreement with the phenomena observed in Jackson and Murphey’s8 cement sheath annulus isolation simulation experiments. (The inner casing was pressurized at 10,000 psi, and the outer annulus was pressurized at 1000 psi. After curing, gas channeling occurred just after the application of air pressure in the annular space. No matter whether the pressure of the inner casing rises or falls, there was always gas channeling in the whole test process.)
The mechanical integrity damage variable of the cement sheath quantitatively reveals that the mechanical properties of the cement sheath at the end of the setting stage can no longer meet the requirements of the downhole pressure environment. The calculation results also show that the damage degrees of the inner and outer walls of the cement sheath are almost the same, indicating that the imagined situation of large differences in the damage between the inner and outer walls of the cement sheath does not exist. After the inner wall of the cement sheath is damaged, it cannot be expected to rely on the outer wall to maintain the sealing performance. The cement sheath is too thin to show damage differences in the mechanical integrity of the inner and outer walls.
4.2.2. In Pressure Test Stage
In the pressure test stage, the wellhead pressure is 50 and 60 MPa, the working fluid is clear water with a density of 1.0 g/cm3, and the pressure at 6000 m downhole is about 110 and 120 MPa, respectively. Taking the wellhead pressure test of 50 MPa as an example, the mechanical integrity of the cement sheath is analyzed.
4.2.2.1. Cement Sheath Tensile Crack
The above Figure 14a shows that the check value of the maximum tensile stress criterion of the cement sheath in the pressure test stage (50 MPa) is all less than 0, and it is judged that there will be no tensile cracks in this stage.
Figure 14.
Calculation results in the pressure test stage (50 MPa): (a) cement sheath tensile cracks, (b) casing debonding micro-annulus, (c) casing shrinking micro-annulus, and (d) cement sheath damage variable.
4.2.2.2. Casing Debonding Micro-Annulus
The above Figure 14b shows that the radial stress of the cement sheath in the pressure test stage (50 MPa) is all less than 0, which is all compressive stress. It is judged that there will be no casing debonding micro-annulus.
4.2.2.3. Casing Shrinking Micro-Annulus
The above Figure 14c shows that the Mohr–Coulomb criterion check value of the cement sheath in the pressure test stage (50 MPa) is all greater than 0, indicating that the cement sheath has undergone plastic yielding, and if the casing shrinks, a micro-annulus will appear on the casing-cement sheath interface. It is judged that the casing shrinking micro-annulus will appear in the pressure test stage (50 MPa).
4.2.2.4. Damage Variable of Cement Sheath Mechanical Integrity
The above Figure 14d shows that the damage variable of the cement sheath mechanical integrity in the pressure test stage (50 MPa) has reached about 0.95. The mechanical integrity of the cement sheath has lost 95%.
4.2.3. Summary of Different Operating Conditions
According to the cement sheath mechanical integrity analysis model, the sealing failure at 6000 m underground in Longgang X well was analyzed. The results are summarized in Table 6.
Table 6. Summary of Cement Sheath Mechanical Integrity Analysis under Different Operating Conditionsa.
green circles mean it will not happen; red circles mean it will happen.
It can be seen from the results in Table 6 that (1) according to the qualitative understanding of the linear elastic constitutive equation, from the initial state to the hollowing out 5000 m, 9 operating conditions, the calculation analysis shows that the cement sheath will not have tensile cracks and casing debonding micro-annulus. However, casing shrinking micro-annulus occurs in every operating condition. (2) According to the quantitative description of the nonlinear elastic constitutive equation, the mechanical integrity damage variable of cement sheath under 9 working conditions is calculated. The lowest damage variable was found to be 0.83 and the highest was 0.98. This means that at least 83% of the mechanical integrity of the cement sheath in downhole operations is lost, and the annular isolation effect cannot be guaranteed.
It can be seen from Figure 15 that the cement sheath mechanical integrity damage variable is closely related to downhole pressure. As the downhole pressure increases, so does the risk of mechanical integrity damage. This conclusion is consistent with the results of the cement sheath annulus isolation simulation experiments done by Goodwin and Crook,7 Jackson, and Murphe.8 Their experiments found that with the increase of casing pressure, the damage to the cement sheath increases, and the pressure in the casing below 2000 psi does not cause gas channeling; while the pressure in the casing is higher than 4000 psi, the gas channeling is very obvious.
Figure 15.

Evolution trend of the cement sheath mechanical integrity damage variable with downhole pressure.
Therefore, the cement sheath mechanical integrity analysis model found that the mechanical properties of the Longgang X well cement slurry system could not meet the operating requirements at 6000 m underground. Reducing wellbore pressure will help maintain the mechanical integrity of the cement sheath, providing sealing performance.
5. Conclusions
Based on the analysis of the interaction relationship between the cement sheath interfaces, the cement sheath mechanical integrity analysis model is established, and the application of the model is tested with field examples. The main findings are as follows:
-
(1)
Through the simulation experiment of cement sheath annulus isolation, the main form of cement sheath integrity failure was obtained, that is, tensile crack damage and micro-annulus caused by plastic yielding.
-
(2)
A damage variable of cement sheath mechanical integrity based on the theory of continuum mechanics is proposed, which can quantitatively judge the cement sheath mechanical integrity.
-
(3)
Considering operating conditions faced by the cement sheath at oil layer casing in a well, the main failure form of cement sheath mechanical integrity is casing shrinking micro-annulus. The damage variable is closely related to downhole pressure.
Acknowledgments
This work has been supported by the National Natural Science Foundation of China (Grant 52274010) and the Science and Technology Cooperation Project of the CNPC-SWPU Innovation Alliance (Grant 2020CX040000).
Appendix: Solving Transcendental Equations By The Dichotomy
Andenaes, Cedolin, Kupfer, and Gerstle19 proposed that under the action of confining pressure, there is a unified functional relationship between the octahedral normal stress and the octahedral normal strain before the ultimate load or peak stress of different concrete. In addition, there is also a unified functional relationship between the octahedral shear stress and the octahedral shear strain. According to previous studies, cement stone is the same as concrete, and there is a unified functional relationship between the secant bulk modulus and octahedral normal strain and between the secant shear modulus and octahedral shear strain of different cement stones.
The functional form of the bulk modulus is
| 15 |
where Ks is the bulk modulus, GPa; εoct is the octahedral normal strain, %; and a and m are the fitted material parameters.
The functional form of the shear modulus is
| 16 |
where Gs is the shear modulus, GPa; γoct is the octahedral shear strain, %; and b, c, and n are the fitted material parameters.
The bulk modulus and shear modulus can be converted to Young’s modulus and Poisson’s ratio using eq 17:
![]() |
17 |
For an axisymmetric cement sheath, the radial stress σr, circumferential stress σθ, and axial stress σz are the three principal stresses, and the radial strain εr, circumferential strain εθ, and axial strain εz are the three principal strains. The description equations that express the nonlinear deformation of cement stone by the principal stresses and principal strains are as follows:
![]() |
18 |
Let
and
. Then:
![]() |
19 |
From σz = vs(σr + σθ) and
, with C defined as
, the following expression can be obtained:
| 20 |
![]() |
21 |
According to the units of the fitted data, the units of A, B, and C are GPa, the units of εr, εθ, and εθ are %, and the sign is negative (the tensile stress is positive), and the units of σr, σθ, and σz are MPa. Equation 21 also has unit conversion coefficients, such as
| 22 |
The same can be obtained:
| 23 |
| 24 |
| 25 |
Subtracting eq 23 from eq 22 gives:
| 26 |
Subtracting eq 23 from eq 24 gives:
| 27 |
Subtracting eq 22 from eq 24 gives:
| 28 |
From
and
, it follows that:
| 29 |
![]() |
30 |
From Ks = aεoctm and Gs = b(γoct – c)n, it follows that:
| 31 |
| 32 |
Substituting eqs 31 and 32 into eqs 29 and 30, we can get
![]() |
33 |
where
,
.
Equation 33 is a transcendental equation with two variables, which can be solved by the dichotomy method.
Let the first formula of eq 33 be a function:
| 34 |
Let the second formula of eq 33 be a function:
![]() |
35 |
The steps to solve the transcendental equations with two variables are as follows (see Figure 16 for the detailed process):
-
(1)
Let Ks1 = x1. Then eqs 24 and 35 become g1(Gs, Ks1) = 0 and g2(Gs, Ks1) = 0.
-
(2)
Find Gs that satisfies g1(Gs, Ks1) = 0 by dichotomy. Let Gs1 = x2 and y1 = g1(Gs1, Ks1); let Gs2 = Gs1 + h1 and y2 = g1(Gs2, Ks1). Determine whether y1·y2 is less than zero. If it is less than zero, it means that in the value interval [Gs1, Gs2] of Gs, there is a solution for g1(Gs, Ks1) = 0. The dichotomy can be used to solve in this interval. If it is greater than zero, it means that the equation system has no solution in the value interval [Gs1, Gs2] of Gs1; then, upon pushing the value interval of Gs one step forward (Gs1 = Gs2 and Gs2 = Gs2 + h1). A range of intervals that has a solution should be found. Gs should be obtained, g2(Gs, Ks1) should be brought in, and z1 = g2(Gs, Ks1) can be obtained.
-
(3)
Let Ks2 = Ks1 + h2. Then eqs 24 and 35 become g1(Gs, Ks2) = 0 and g2(Gs, Ks2) = 0. Similarly, the dichotomy method can be used to find Gs that satisfies g1(Gs, Ks2) = 0, and then g2(Gs, Ks2) should be brought in to get z2 = g2(Gs, Ks2).
-
(4)
Whether z1·z2 is less than zero should be determined. If it is less than zero, it means that in the value interval [Ks1, Ks2] of Ks there is a solution for the transcendental equations. The dichotomy can be used to solve in this interval. If it is greater than zero, it means that the equation system has no solution in the value interval [Ks1, Ks2] of Ks, so the value interval of Ks is pushed one step forward (Ks1 = Ks2 and Ks2 = Ks2 + h2). A range of intervals that has a solution should be found.
Figure 16.
Program diagram of solving transcendental equations by dichotomy: (a) Dichotomy module that given Ks to find the Gs satisfies g1(Gs, Ks) = 0, and (b) program diagram of the bulk modulus and shear modulus transcendental equation solution process.
By solving the transcendental eq 33 by the dichotomy method (Figure 16), the bulk modulus Ks and shear modulus Gs corresponding to the given radial stress σr and circumferential stress σθ of the cement sheath can be obtained. The bulk modulus and shear modulus can be converted to Young’s modulus and Poisson’s ratio. The radial stress σr and circumferential stress σθ of the plane strain problem have no relationship with the material parameters of the cement sheath but are only related to the internal and external pressure and geometric parameters. The radial stress σr and the circumferential stress σθ are directly determined by the cement sheath stress distribution formula. Therefore, after determining the force acting on the cement sheath, Young’s modulus and Poisson’s ratio distribution in the cement sheath under the internal and external loads can be determined.
The authors declare no competing financial interest.
References
- Zheng S.; Wu C.; Wang C.; Huang Y.; Chen H.; Zheng H. Influence of casing eccentricity on the mechanical integrity of cement sheaths in fractured wells. ACS Omega 2021, 6, 32763–32772. 10.1021/acsomega.1c04567. [DOI] [PMC free article] [PubMed] [Google Scholar]
- Li Z.; Li G.; Li H.; He L.; Wang X. Mechanisms of casing deformation during hydraulic fracturing in the horizontal wells of the weirong shale field. ACS Omega 2022, 7, 9796–9807. 10.1021/acsomega.2c00044. [DOI] [PMC free article] [PubMed] [Google Scholar]
- Su D.; Li Z.; Huang S.; Wu X.; Li J.; Xue Y. Experiment and failure mechanism of cement sheath integrity under development and production conditions based on a mechanical equivalent theory. Energy Sci. Eng. 2021, 9, 2400–2422. 10.1002/ese3.994. [DOI] [Google Scholar]
- Su D.; Wu X.; Li Z.; Huang S.; Li J.; Sun J.; Zheng G. Theoretical Analysis of the Micro Annulus of an Oil-Well Cement Sheath Formed via Cooling under Acid-Fracturing Conditions. Processes 2022, 10, 966. 10.3390/pr10050966. [DOI] [Google Scholar]
- Lian W.; Li J.; Tao Q.; Liu G.; Wang W.; Ren K. Sealing failure mechanism and control method for cement sheath during hydraulic fracturing. ACS Omega 2020, 5, 19978–19994. 10.1021/acsomega.0c01326. [DOI] [PMC free article] [PubMed] [Google Scholar]
- Patel H.; Salehi S. Structural integrity of liner cement in oil & gas wells: Parametric study, sensitivity analysis, and risk assessment. Eng. Fail. Anal. 2021, 122, 105203 10.1016/j.engfailanal.2020.105203. [DOI] [Google Scholar]
- Goodwin K. J.; Crook R. J. Cement sheath stress failure. SPE Drill. Eng. 1992, 7, 291–296. 10.2118/20453-PA. [DOI] [Google Scholar]
- Jackson P. B.; Murphey C. E.. Effect of casing pressure on gas flow through a sheath of set cement. In SPEJIADC Drilling Conference: Amsterdam, Netherlands, 1993. [Google Scholar]
- Boukhelifa L.; Moroni N.; James S. G.; Le Roy Delage S.. Evaluation of cement systems for oil and gas well zonal isolation in a Full-Scale annular geometry. In IADC/SPE Drilling Conference: Dallas, Texas, 2004. [Google Scholar]
- Xi Y.; Jin J.; Fan L.; Guo X.; Shen J.; Li J. Research on the establishment of gas channeling barrier for preventing SCP caused by cyclic loading-unloading in shale gas horizontal well. J. Petrol. Sci. Eng. 2022, 208, 109640 10.1016/j.petrol.2021.109640. [DOI] [Google Scholar]
- Li Z.; Zhang K.; Guo X.; Liu J.; Cheng X.; Du J. Study of the failure mechanisms of a cement sheath based on an equivalent physical experiment. J. Nat. Gas Sci. Eng. 2016, 31, 331–339. 10.1016/j.jngse.2016.03.037. [DOI] [Google Scholar]
- Zhou S.; Liu R.; Zeng H.; Zeng Y.; Zhang L.; Zhang J.; Li X. Mechanical characteristics of well cement under cyclic loading and its influence on the integrity of shale gas wellbores. Fuel 2019, 250, 132–143. 10.1016/j.fuel.2019.03.131. [DOI] [Google Scholar]
- Saint-Marc J.; Garnier A.; Bois A.. Initial state of stress: The key to achieving Long-Term Cement-Sheath integrity. In SPE Annual Technical Conference and Exhibition: Denver, Colorado, USA, 2008. [Google Scholar]
- Bois A. P.; Garnier A.; Rodot F.; Saint-Marc J.; Aimard N. How to prevent loss of zonal isolation through a comprehensive analysis of microannulus formation. SPE Drill. Completion 2011, 26, 13–31. 10.2118/124719-PA. [DOI] [Google Scholar]
- Bois A.; Garnier A.; Galdiolo G.; Laudet J. Use of a mechanistic model to forecast Cement-Sheath integrity. SPE Drill. Completion 2012, 27, 303–314. 10.2118/139668-PA. [DOI] [Google Scholar]
- Bosma M.; Ravi K.; van Driel W.; Schreppers G. J.. Design approach to sealant selection for the life of the well. In SPE Annual Technical Conference and Exhibition: Houston, Texas, 1999. [Google Scholar]
- Chen M.; Jin Y.; Zhang G.. Petroleum engineering rock mechanics; Science Press, 2008. [Google Scholar]
- Chen Z.; Zhu W.; Di Q. Elasticity solution for the casing under linear crustal stress. Eng. Fail. Anal. 2018, 84, 185–195. 10.1016/j.engfailanal.2017.11.007. [DOI] [Google Scholar]
- Huifa C.; Lipu A. F. S.. Constitutive equations for concrete and soil; China Architecture & Building Press, 2004. [Google Scholar]
- Huifa C.; Lipu A. F. S.. Elasticity and plasticity mechanics; China Architecture & Building Press, 2004. [Google Scholar]
- Bu Y.; Tian L.; Guo B.; Wang C.; Sun B. Experiment and simulation on the integrity of cement ring interface in deep water shallow formation. J. Petrol. Sci. Eng. 2020, 190, 107127 10.1016/j.petrol.2020.107127. [DOI] [Google Scholar]
- Xi Y.; Li J.; Tao Q.; Guo B.; Liu G. Experimental and numerical investigations of accumulated plastic deformation in cement sheath during multistage fracturing in shale gas wells. J. Petrol. Sci. Eng. 2020, 187, 106790 10.1016/j.petrol.2019.106790. [DOI] [Google Scholar]
- Wu Y.; Patel H.; Salehi S. Parametric study of mechanical stresses within cement sheath in geothermal wells. Geothermics 2021, 90, 102000 10.1016/j.geothermics.2020.102000. [DOI] [Google Scholar]
- Laidler A.; Taoutaou S.; Johnson C. R.; Quisel N.; Desroches J.; Agarwal S.. A risk analysis approach using stress analysis models to design for cement sheath integrity in a multilateral well. In International Petroleum Technology Conference: Dubai, U.A.E, 2007. [Google Scholar]