Optimizing the operation strategy of a combined cooling, heating and power system based on energy storage technology

Yu Zhang 1, Yan Deng 1, Zimin Zheng 1, Yao Yao 1, Yicai Liu 1,
PMCID: PMC9941197  PMID: 36804994

Abstract

Energy storage technology is the key to achieving a carbon emission policy. The purpose of the paper is to improve the overall performance of the combined cooling, heating and power-ground source heat pump (CCHP-GSHP) system by the battery. A new operation strategy (the two-point operation) is proposed by controlling the power generation unit work. The power generation unit has two operation modes of non-operation and rated efficiency operation by the storage electricity battery. The new operation strategy is compared with the traditional CCHP-GSHP that without a battery. The optimization goals include the primary energy saving ratio, the reduction ratio of carbon dioxide emissions, and the annual total cost saving ratio. The independent GSHP system is used as a reference system. Multipopulation genetic algorithms are selected to achieve the problem of optimization. A hotel building is selected for a case study. The optimal configuration of the coupling system is computed following the electric load strategy. Finally, the results show that the CCHP-GSHP system has a better performance under the new operation strategy compared with the traditional CCHP-GSHP (the primary energy saving ratio increases by 5.5%; the annual carbon dioxide emission reduction ratio increases by 1%; the annual total cost reduction ratio increases by 5.1%). This paper provides reference and suggestions for the integration and operation strategy of CCHP-GSHP in the future.

Subject terms: Energy science and technology, Engineering

Introduction

With the situation of energy and the environment becoming more and more serious, energy saving and emissions reduction have received increasing attention1. The CCHP system can achieve multi-stage utilization of energy and effectively decrease the carbon emissions2. Its advantages have led to its rapid development in energy savings and environmental protection3. Nojavan et al.4 implemented renewable energy in a microenergy grid to model this system. Zeng et al.57 used a hybrid particle swarm optimization algorithm and genetic algorithm to dynamically optimize the CCHP system considering the nonlinearity of the equipment. Considering the equipment capacity and energy allocation of the system, the optimization results were verified by comparison with the traditional system in three aspects: energy saving rate, carbon dioxide reduction ratio, and annual total cost. Soheyli8 considered a novel CCHP system that included photovoltaic modules, wind turbines, and solid oxide fuel cells as prime moors. Lu et al.9 proposed a seasonal operation strategy of the distributed energy system, which used an analytic hierarchy process to determine the weight and differential evolution particle swarm optimization hybrid algorithm to solve the model. Feng et al.10 studied the performance of the system from the perspective of different cooling methods and optimized the CCHP system based on a hybrid chiller. Su et al.11 optimized and analysed the key operating parameters of the CCHP-GSHP system based on the comprehensive benefits of economy, energy conservation, and environmental protection. Chu et al.12 considered carbon tax as the objective function and compared the advantages and disadvantages of the CCHP-GSHP joint supply system of different types of buildings. Yan et al.13 designed a new CCHP microgrid structure with compressed air energy storage, mainly considering energy utilization and energy cascade utilization. Li et al.14 compared the CCHP-GSHP coupled system with a heat exchanger with the CCHP-GSHP system without a heat exchanger. Zhang et al.15 compared the advantages and disadvantages of four refrigeration methods, namely waste heat driven absorption refrigerator, electric refrigerator, gas absorption refrigerator, and ground source heat pump, in the CCHP system. Arabkoohsar and Sadi improved the hybrid configuration of a power generation system. The system has good comprehensive performance for reducing carbon dioxide emissions16; Sadi et al.17,18 analyzed the benefits of using solar energy and biomass energy in India; Shoeibi et al.19 analyzed and summarized the application of solar energy in energy systems.

Recent studies have made progress in the integration schemes and optimization algorithms of CCHP systems. However, there are still many problems including to modifying the system configuration and operation strategy. The point was not more considered that the existence of the storage battery can improve the efficiency of the power generation unit (PGU) in the CCHP-GSHP system. In this paper, the battery is used to store PGU electricity and the PGU adopts the two-point operation strategy for the CCHP-GSHP system. To meet the load fluctuation of the building and enhance the combined performance of the coupled system, the system is equipped with a battery to enhance the regulation ability of the system. It has a positive impact on the improvement of the efficiency of the whole system. The case of a hotel building in Changsha is researched to achieve the optimal configuration. The multipopulation genetic algorithm (MGA) was used for calculation.

System composition

Independent ground source heat pump system

The GSHP system is considered as a reference system for the design system, and its design results are shown in Fig. 1.

Figure 1.

Figure 1

Independent GSHP system.

The GSHP system provides the cooling and heating load required by the building. The power required by the building. The power required by the building and the system is provided by the electricity grid. The power supply balance of the system is described as follows:

Egrid=E+EGSHP+EGSHP,er. 1

where E represents the electrical demand of the building, EGSHP,er is the amount of electrical demand to work the whole system, and EGSHP is the electrical load of the driving GSHP system, which can be expressed as:

EGSHP=Qc,h/COPGSHP. 2

where Qc and Qh denote the cooling capacity and heat capacity of the building, respectively. COPGSHP represents the cooling and heating efficiency of the GSHP system and could be defined as follows2:

COPGSHP=COPgshpmax[a2ηgshp2+a1ηgshp]. 3

where COPgshpmax represents the rated efficiency of GSHP, and ηgshp is the partial load coefficient of GSHP in the reference system, which can be written as:

ηgshp=Qxy/Qgshpmax. 4

where Qgshpmax is the rated capacity of the GSHP, the equation represents cooling or heating. Considering energy conversion and transmission, the main energy consumption of the system per hour is

FGSHP=EGSHP/(ηEηT). 5

where ηE and ηT are the generation efficiency and transmission efficiency, respectively.

Traditional CCHP-GSHP system

The traditional GSHP coupled with cooling, heating, and power system is considered as the comparison system of the design system, and its design results are shown in Fig. 2.

Figure 2.

Figure 2

Traditional CCHP-GSHP system.

The power balance formula of the traditional CCHP-GSHP system is as follows:

Egrid+Epgu=E+Eer+Egshp 6

where, Egrid is the electricity consumption of the grid, Epgu denotes the power supplied by the PGU, E is the electricity load requirements of the building, Eer is the power requirements of the system during operation, and Egshp is the power requirements of the GSHP, which can be defined as belows:

Egshp=Qgshpc/h/COPgshp. 7

where Qgshpc/h is the cooling or heating supply by the GSHP, and it could be written in Eq. (8):

Qgshpc/h=mQc/h. 8

where m denotes the proportion of cooling or heating quantity supplied by GSHP between the cooling or heating load requirements of the system, which determines the flexibility of the system and is chosen as the optimization variable. The ground source heat pump part is the same between the traditional CCHP-GSHP system and the reference system:

COPGSHP=COPgshpmax[a2ηgshp2+a1ηgshp]. 9

where ηgshp is the partial load coefficient of GSHP, and it could be written in Eq. (10).

ηgshp=Qgshpc/h/Qgshpmax. 10

where Qgshpmax is the rated capacity of the GSHP. The rated capacity of the PGU determines whether the system can efficiently realize the cascade utilization of energy. Therefore, it is also chosen as the optimization variable in the system, and the natural gas consumed by the PGU is:

Fpgu=Epgu/ηpgu. 11

where Epgu is the actual power generation of the PGU and can be expressed as follows20:

Epgu=00<f<tEpguft<f<1Epgumaxt<f<1. 12

Parameter t can effectively improve the power generation efficiency of the PGU and play a decisive role in improving the efficiency of the whole system. Parameter f is the partial load coefficient of the PGU and is chosen as the decision variable, which can be written as:

f=Epgu/Epgumax. 13
ηpguf=a0+a1fpgu+a2fpgu2. 14

where Epgumax is the rated power generation of the PGU, and ηpguf is the power generation efficiency. The thermal equilibrium of the coupled system can be expressed as:

Qpgu+Qb+ηtstQtstout-ηtstQtstin=Qab/COPab+Qhe/ηhe. 15
Qpgu=Fpgu(1-ηpgu)ηrec. 16
Qab=(1-m)Qc. 17

where Q stands for the regenerated heat. ηtst is the heat loss coefficient of the thermal storage tank per hour, and ηrec is the efficiency of the heat recovery system. COPab can be expressed as:

COPab=d3(ηab)3+d2(ηab)2+d1(ηab)+d0. 18
ηab=Qab/Qabmax. 19
Qheh=(1-m)Qh. 20

The gas consumed by the boiler can be calculated as follows:

Fb=Qb/ηb. 21

Two-point operation model CCHP-GSHP system with accumulator in prime motor

The schematic of the two-operation model CCHP-GSHP system with accumulator in PGU is shown in Fig. 3. The power balance formula of two-operation model CCHP-GSHP system is as follows:

Egrid+ηoutEbatout+Epgu=E+Eer+Egshp+ηcηinEbatin. 22

Egrid is the electricity consumption quantity of the grid, Epgu is the amount of power quantity that provided by the PGU, and E is the required electricity load of the building. Ebatout denotes the exported power quantity from the accumulator, and Ebatin is the imported power quantity to the accumulator. ηin and ηout are the charging efficiency and discharge efficiency of the battery21. In the two-point operation model CCHP-GSHP system, the capacity of the accumulator (Batmax) determines the regulating ability of the system, and it is adopted as the optimization variable.

Figure 3.

Figure 3

Two-point operation CCHP-GSHP system.

A bidirectional inverter is used to connect between the AC and DC buses, with an efficiency ηc22. Then the AC from the PGU is converted to DC to charge the battery, and the rest of the equipment model is consistent with the traditional system. The optimization variables include the rated capacity of the PGU and the load rate of the GSHP, while the starting parameters of the PGU are not considered because the operation mode of the PGU has been determined. Epgu is the actual power generation of the PGU, and it can be expressed as follows:

Epgu=0E+Eer+Egshp<ηoutEbatoutEpgumaxE+Eer+Egshp>ηoutEbatout. 23

Optimization program

Optimization algorithm

Genetic algorithms, which can also be called standard genetic algorithms, were first proposed by John Holland in 1975. The multipopulation genetic algorithm is based on the standard genetic algorithm. However, it breaks through the framework of only relying on a single population to achieve genetic evolution, and introduces multiple populations to search for the optimal results at the same time. Each population has different control parameters and achieves different search objectives. Different populations influence each other through migrant operators. Manual selection is used to obtain elite individuals. The ultimate best result is the combined effect of coevolution of all populations. Multiple populations, the genetic algorithm, are developed to optimize the rated capacitance of the prime motor and coupling system in the source heat pump heating/cooling load rate and storage capacity for the system decision variables for the overall optimization. The optimization goal considers the energy, environment, economic indicators, using MATLAB software to realize the whole calculation process.

Optimization objective

  1. Primary energy saving rate

The annual primary energy saving rate was selected as the energy index. Coupled system energy consumption includes natural gas consumed by PGU and boilers and fossil fuels consumed by electricity grids. It can be expressed as:

FCCHP=n=18760Fpgun+Fbn+Fgridn. 24

where FCCHP is the annual fossil energy consumption of the coupled system, Fpgun is the natural gas consumption per hour by the PGU, Fbn is the amount of natural gas consumption per hour by the boiler, and Fgridn is the amount of fossil fuel consumption per hour of the electricity grid, The energy consumption of the reference system including the fossil fuel consumption by the electricity grid, can be expressed as:

FGSHP=n=18760FGSHP,gridn. 25

where FGSHP is the annual fossil energy consumption of the reference system, and FGSHP,gridn is the amount of fossil fuel consumption per hour on the public electricity grid. Consequently, the annual energy saving rate can be written as:

Penergy=(FCGSHP-FCCCHP)/FCGSHP. 26

where Penergy is the primary energy saving rate of CCHP system, FGSHP is the annual energy consumption of the reference system, and FCCHP is the annual fossil energy consumption of the coupled system.

  • (B)

    Reduction rate of the annual total cost

The annual total cost is chosen as the economic indicator, which includes natural gas cost, carbon tax and annual initial investment and can be calculated as follows.

CRCCHP=n=18760(Ngas(Fpgun+Fbn)+NgridEgridn)+ERCCHPT+Pk=1yCakCok. 27

where CRCCHP is the total annual total cost of the coupled system, Ngas is the cost of natural gas per kilowatt per hour, Ngrid is the unit cost of the public electricity grid, ERCCHP is the annual CO2 emissions from the coupled system, Egridn is the consumption of power in the public electricity grid, and T represents the carbon tax. Cak is the unit capacity of equipment in a coupled system, Cok is the unit cost of equipment, and y is the number of pieces of equipment. P is the rate of return on investment, and it could be defined in Eq. (28).

P=(I(I+1)d)/((I+1)d-1). 28

where I is the rate of interest and d stands for the life of equipment; assume that I and d are equal for all equipment in this paper. Then the annual total cost of the reference system is shown in Eq. (29), and the reduction rate of the annual total cost can be written in Eq. (30).

CRGSHP=n=18760NGSHPEGSHP,gridn+ERGSHPT+Pk=1yCakCok. 29
Pcost=(CRGSHP-CRCCHP)/CRGSHP. 30
  • (C)

    Reduction rate of the annual emissions of CO2

The annual CO2 emission rate is chosen as the environmental indicator. The CO2 emission rate of the coupled system includes the consumption of natural gas by the PGU and boiler, and fossil fuel consumption by the public electricity grid, which can be expressed as:

ERCCHP=n=18760Mgas(Fpgun+Fbn)+MgridEgridn. 31

where ERCCHP is the annual CO2 emissions from the coupled system, Mgas is the CO2 emissions per unit of natural gas, and Mgrid is the CO2 emissions per unit of electricity grid. The emissions of CO2 of the reference system include fossil fuel consumption by the public electricity grid, and can be expressed as follows.

ERGSHP=n=18760MgridEGSHP,gridn. 32

where EGSHP,gridn is the power consumption per hour of the reference system. Therefore, the reduction rate of the annual emissions of CO2 can be expressed as Eq. (33) shows.

Penvironment=ERGSHP-ERCCHP/ERGSHP. 33
  • (D)

    Overall performance

To reflect the comprehensive performance of the coupled system, the energy, economic and environmental indicators are combined into the following expressions:

OB=max{δ1Penergy+δ2Pcost+δ3Penvironment}. 34

where δ1, δ2 and δ3 are weighting factors, which require 0δ1, δ21, δ31, and δ1+δ2+δ31. These values represent the importance of energy, economic and environmental indicators, respectively. According to the literature, δ1, δ2 and δ3 are set to 1/3 equally, which means that the environmental and economic indicators are equally important. The purpose of optimizing a model is to find the maximum value of the model. In this paper, the maximization problem is transformed into a minimization problem. Therefore, the optimization objective of this model is expressed as:

P=min(1-(δ1Penergy+δ2Pcost+δ3Penvironment)). 35

Case study

Building information

A hotel building is chosen to validate the proposed optimization model. The hotel building is located in Changsha city. Energy Plus software is used to simulate the hourly heating and cooling load of the building, and the results are shown in Fig. 4.

Figure 4.

Figure 4

Annual loads of one building.

System information

System costs and energy prices are shown in Table 1; system equipment parameters are shown in Table 2; and energy carbon emissions are shown in Table 3.

Table 1.

System costs23,24.

Energy and equipment Symbols Price (RMB)
TOU power price (6:00–22:00) Ngrid 1.2/kwh
TOU power price (23:00–5:00) Ngrid 0.711kwh
Natural gas Ngas 0.325/kwh
GSHP Cgshp 2200/kw
Prime motor and regenerators Cpgu+rec 2200/kw
Absorption refrigerator Cab 1200/kw
Gas-fired boiler Cb 300/kw
Accumulator Cba 2100/kw
Thermal storage tank Ctst 230/kw
Heat exchanger Che 200/kw
Carbon tax T 0.3/kg

Table 2.

System equipment parameters.

Equipment parameters Symbols Values
Power generation efficiency of the prime motor

Epgumax

a0

a1

0.39

0.049

0.7411

a2 − 0.4015
Efficiency of the regenerator ηrec 0.8
Efficiency of the absorption refrigerator Qabmax 0.8
d0 0.425
d1 1.683
d2 − 2.419
d3 1.108
Efficiency of the GSHP system COPgshpmax 4
a1 1.819
a2 − 0.819
Efficiency of the boiler ηb 0.8
Efficiency of the heat exchanger ηhe 0.8
Efficiency of the accumulator ηin 0.85
ηout 1
ηba 0.2
ηc 0.95
Loss coefficient of the thermal storage tank ηtst 0.8
Efficiency of the electricity grid ηE 0.35
ηT 0.92
Efficiency of the equipment I 0.08
Equipment life d 20 years

Table 3.

Energy carbon emissions parameters.

Fuel Symbols Values (g/kWh)
Power Mgrid 968
Natural gas Mgas 220

Results and discussions

Annual power distribution of the system

As shown in Figs. 5 and 6, when the PGU uses the two-point operation strategy for the CCHP-GSHP system, the power generation efficiency has the highest level and battery efficiency is relatively high, which is a good adjustment for the system. The PGU has given much support with high efficiency in the interval work. Therefore, the electricity grid replenishment space greatly decreases and the capacity of the PGU does not significantly increase. From the perspective of energy savings and environmental protection, the overall performance of the whole system is improved.

Figure 5.

Figure 5

Annual power distributions of the traditional CCHP-GSHP system.

Figure 6.

Figure 6

Annual power distributions of the two-point operation CCHP-GSHP system.

Annual heat quantity distribution of the system

As seen from the comparison between Figs. 7 and 8, the PGU running at the two-point operation strategy for the CCHP system, which improves the utilization efficiency of the heat storage tank and plays a good role in regulating and providing more support for the PGU working at the high efficiency. Due to the lower economic cost of the power source in the two-point operation CCHP-GSHP system, the capacity of GSHP has been further improved. The cooling/heating cost is relatively reduced. The overall performance of the system is improved.

Figure 7.

Figure 7

Annual heat quantity distributions of the traditional CCHP-GSHP system.

Figure 8.

Figure 8

Annual heat quantity distributions of the two-point operation CCHP-GSHP system.

Optimization indexes

As shown in Fig. 9, compared with the reference system, the primary energy saving rate of the traditional CCHP-GSHP system is 27.7%, the annual total cost saving rate is 37.5%, the reduction rate of CO2 emissions is 47.7%, and the overall performance is 37.7%. The primary energy saving rate of the CCHP-GSHP system with batteries is 33.2%, the annual total cost saving rate is 38.5%, the reduction rate of CO2 emissions is 52.8%, and the overall performance is 41.5%. Therefore, the two-point operation CCHP-GSHP system with batteries has a 5.5%, 1%, 5.1% and 3.9% higher in primary energy saving rate, CO2 emission rate, annual total cost saving rate and overall performance than those of the traditional CCHP-GSHP system, respectively. Although the cost increases due to the increase in battery equipment, from the perspective of reducing fuel consumption, the performance of all aspects of the whole system has been improved.

Figure 9.

Figure 9

Optimization target values of two systems.

Conclusions

  1. Compared with the traditional CCHP-GSHP system, the proposed two-point operation mode CCHP-GSHP system has advantages in all aspects, which are 5.5%, 1%, 5.1% and 3.9% higher in primary energy saving rate, carbon emission rate, annual total cost saving rate and comprehensive performance, respectively. The results show that the optimized coupling system can work in a more energy saving, environmental protection and economic way and prove the effectiveness of the coupling system, operation strategy and optimization method.

  2. To satisfy the building load fluctuation and strengthen the combination performance of the coupled system, this paper provides a certain reference and suggestion for subsequent CCHP-GSHP system integration and operation strategy.

Acknowledgements

This research was funded by the National Natural Science Foundation of China (51776226), and supported by the Fundamental Research Funds for the Central Universities of Central South University (1053320214535).

Author contributions

Y.Z. and Y.D. designed and led the research work and with Y.Z. drafted the manuscript with input from all the authors. Y.Z., Y.D., Z.Z., and Y.Y. participated in the simulation work and Y.L. reviewed the manuscript.

Data availability

The datasets analyzed during the current study are available from the corresponding author on reasonable request.

Competing interests

The authors declare no competing interests.

Footnotes

Publisher's note

Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.

References

  • 1.Sadi M, Arabkoohsar A. Techno-economic analysis of off-grid solar-driven cold storage systems for preventing the waste of agricultural products in hot and humid climates. J. Clean. Prod. 2020;275:124143. doi: 10.1016/j.jclepro.2020.124143. [DOI] [Google Scholar]
  • 2.Deng Y, Liu YC, Zeng R, et al. A novel operation strategy based on black hole algorithm to optimize combined cooling, heating and power-ground source heat pump system. Energy. 2021;229:120637. doi: 10.1016/j.energy.2021.120637. [DOI] [Google Scholar]
  • 3.Deng Y, Zeng R, Liu YC, et al. A novel off-design model to optimize combined cooling, heating and power system with hybrid chillers for different operation strategies. Energy. 2022;239:122085. doi: 10.1016/j.energy.2021.122085. [DOI] [Google Scholar]
  • 4.Sayyad N, Kasra S, Kazem Z. Risk-based performance of combined cooling, heating and power (CCHP) integrated with renewable energies using information gap decision theory. Appl. Therm. Eng. 2019;159:113875. doi: 10.1016/j.applthermaleng.2019.113875. [DOI] [Google Scholar]
  • 5.Zeng R, Li H, Liu L, et al. A novel method based on multi-population genetic algorithm for CCHP–GSHP coupling system optimization. Energy Convers. Manag. 2015;105:1138–1148. doi: 10.1016/j.enconman.2015.08.057. [DOI] [Google Scholar]
  • 6.Zeng R, Zhang X, Deng Y, et al. An off-design model to optimize CCHP-GSHP system considering carbon tax. Energy Convers. Manag. 2019;189:105–117. doi: 10.1016/j.enconman.2019.03.062. [DOI] [Google Scholar]
  • 7.Zeng R, Zhang X, Deng Y, et al. Optimization and performance comparison of combined cooling, heating and power/ground source heat pump/photovoltaic/solar thermal system under different load ratio for two operation strategies. Energy Convers. Manag. 2020;208:112579. doi: 10.1016/j.enconman.2020.112579. [DOI] [Google Scholar]
  • 8.Saman S, Mohamad H, Mehri M. Modeling a novel CCHP system including solar and wind renewable energy resources and sizing by a CC-MOPSO algorithm. Appl. Energy. 2016;184:375–395. doi: 10.1016/j.apenergy.2016.09.110. [DOI] [Google Scholar]
  • 9.Lu S, Li Y, Xia H. Study on the configuration and operation optimization of CCHP coupling multiple energy system. Energy Convers. Manag. 2018;177:773–791. doi: 10.1016/j.enconman.2018.10.006. [DOI] [Google Scholar]
  • 10.Feng L, Dai L, Mo J, et al. Performance assessment of CCHP systems with different cooling supply modes and operation strategies. Energy Convers. Manag. 2019;192:188–201. doi: 10.1016/j.enconman.2019.04.048. [DOI] [Google Scholar]
  • 11.Su PW. Analysis of distributed energy supply system with ground source heat pump on 3E benefits. Dalian University of Technology; 2019. [Google Scholar]
  • 12.Chu XL, Yang D. Stochastic chance-constrained optimization programming for CCHP-GSHP coupling system considering carbon tax. J. Donghua Univ. 2019;45(05):759–764. [Google Scholar]
  • 13.Yan Y, Zhang CH, Li K, et al. The optimal operation strategy for hybrid combined cooling, heating and power microgrid with compressed air energy storage. Proceeding of CSEE, 2018, 38(23): 6924–6936+7126.
  • 14.Li B, Hu P, Zhu N, et al. Performance analysis and optimization of a CCHP-GSHP coupling system based on quantum genetic algorithm. Sustain. Cities Soc. 2019;46:101408. doi: 10.1016/j.scs.2018.12.036. [DOI] [Google Scholar]
  • 15.Zhang J, Cao S, Yu L, et al. Comparison of combined cooling, heating and power (CCHP) systems with different cooling modes based on energetic, environmental and economic criteria. Energy Convers. Manag. 2018;160:60–73. doi: 10.1016/j.enconman.2018.01.019. [DOI] [Google Scholar]
  • 16.Arabkoohsar A, Sadi M. Thermodynamics, economic and environmental analyses of a hybrid waste–solar thermal power plant. J. Thermal Anal. Calorim. 2020;214:570–584. [Google Scholar]
  • 17.Sadi M, Chakravarty KH, Behzadi A, et al. Techno-economic-environmental investigation of various biomass types and innovative biomass-firing technologies for cost-effective cooling in India. Energy. 2021;219:119561. doi: 10.1016/j.energy.2020.119561. [DOI] [Google Scholar]
  • 18.Sadi M, Arabkoohsar A, Joshi AK. Techno-economic optimization and improvement of combined solar-powered cooling system for storage of agricultural products. Sustain. Energy Technol. Assess. 2021;45(1):101057. [Google Scholar]
  • 19.Shoeibi S, Kargarsharifabad H, Sadi M, et al. A review on using thermoelectric cooling, heating, and electricity generators in solar energy applications. Sustain. Energy Technol. Assess. 2022;52:102105. [Google Scholar]
  • 20.Zhou, W.B. Research on optimal design and uncertain operating of combined cooling heating and power system with synergy of multiple energy sources. Xi’an University of Architecture and Technology, Xi’an, China (2018) (in Chinese)
  • 21.Yang H, Zhou W, Lu L, et al. Optimal sizing method for stand-alone hybrid solar–wind system with LPSP technology by using genetic algorithm. Sol. Energy. 2008;82(4):354–367. doi: 10.1016/j.solener.2007.08.005. [DOI] [Google Scholar]
  • 22.Kim H, Ryu M, Baek J, et al. High-efficiency isolated bidirectional AC–DC converter for a DC distribution system. IEEE Trans. Power Electron. 2013;28(4):1642–1654. doi: 10.1109/TPEL.2012.2213347. [DOI] [Google Scholar]
  • 23.Wang JJ, Jing RY, Zhang RF. Optimization of capacity and operation for CCHP system by genetic algorithm. Appl. Energy. 2010;87(4):1325–1335. doi: 10.1016/j.apenergy.2009.08.005. [DOI] [Google Scholar]
  • 24.Deng Y, Liu YC, Zhang Y, et al. Optimization and performance analysis of CCHP-GSHP-SE system under different start factors. Energy Convers. Manag. 2022;266:115827. doi: 10.1016/j.enconman.2022.115827. [DOI] [Google Scholar]

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Data Availability Statement

The datasets analyzed during the current study are available from the corresponding author on reasonable request.


Articles from Scientific Reports are provided here courtesy of Nature Publishing Group

RESOURCES