Accounting for Data Errors Discovered from an Audit in Multiple Linear Regression

Bryan E Shepherd 1,*, Chang Yu 1
PMCID: PMC3092800  NIHMSID: NIHMS260622  PMID: 21281274

Summary

A data coordinating team performed on-site audits and discovered discrepancies between the data sent to the coordinating center and that recorded at sites. We present statistical methods for incorporating audit results into analyses. This can be thought of as a measurement error problem, where the distribution of errors is a mixture with a point mass at 0. If the error rate is non-zero, then even if the mean of the discrepancy between the reported and correct values of a predictor is 0, naive estimates of the association between two continuous variables will be biased. We consider scenarios where there are 1) errors in the predictor, 2) errors in the outcome, and 3) possibly correlated errors in the predictor and outcome. We show how to incorporate the error rate and magnitude, estimated from a random subset (the audited records), to compute unbiased estimates of association and proper confidence intervals. We then extend these results to multiple linear regression where multiple covariates may be incorrect in the database and the rate and magnitude of the errors may depend on study site. We study the finite sample properties of our estimators using simulations, discuss some practical considerations, and illustrate our methods with data from 2815 HIV-infected patients in Latin America, of whom 234 had their data audited using a sequential auditing plan.

Keywords: Data quality, HIV/AIDS, Measurement error

1. Introduction

Data quality is often assessed with an audit, in which the values recorded in the database for a random subset of records are compared to their corresponding entries in primary source documents. Data audits are common in multicenter clinical trials, where error rates are expected to be low. However, many research studies use existing datasets which are observational and retrospective, and the importance of checking the validity of these data sources is particularly important given their higher propensity for error. Based on our experience, audits of this type of data almost always reveal errors, leaving the research team with a difficult decision: use the existing data, discard the data, or correct the errors in all records. Obviously it is best to have accurate data; incorporating data with errors can yield biased results (Mullooly, 1990). However, re-abstracting and re-entering all data, followed by a second audit, can be very time-consuming and expensive, and may not be feasible or worth the effort when error rates are low or moderate.

For example, the Caribbean, Central and South America Network for HIV Research (CCASAnet) is a multi-site cohort which uses existing clinical databases to address questions about the HIV epidemic in Latin America (McGowan et al., 2007). A team from the CCASAnet data coordinating center recently conducted on-site data audits at participating sites, comparing data in the CCASAnet database with data in patients’ clinical charts. The audit team found non-negligible error rates for some variables, and asked one site to re-enter a key variable which had what the data coordinating center felt to be a particularly high error rate. However, it was not possible to re-enter all variables at all sites. Therefore, although subsequent studies using the CCASAnet data acknowledged that errors were discovered during an audit, their analyses used the original data which had only been corrected for the relatively small proportion of audited records (Tuboi et al., 2009).

An alternative approach would be to adjust estimates based on audit findings. Here we present statistical methods for incorporating results from audits into an analysis. Specifically, we will consider measuring the association between two continuous variables when there are data errors in some of the records. Our problem is similar to that of classical measurement error (Fuller, 1987; Carroll et al., 2006) where the true value of the variable is taken to be the value in the source document (e.g., the clinical chart) and the observed value, possibly recorded with error, is what is found in the database. However, there are important differences between our problem and classical measurement error. First, not all records have data entry error: the distribution of the errors can be thought of as a mixture distribution with a point mass at zero. Second, both the predictor and outcome variables could be incorrectly entered in the database, and the existence and magnitude of these errors could be correlated. To our knowledge, neither scenario has been explicitly addressed in the measurement error literature.

In this manuscript we show how to incorporate the error rate and the magnitude of the error, estimated from the audit data, to compute unbiased estimates of association and proper confidence intervals. We will consider situations where for an unknown proportion of records 1) the value for the predictor variable is incorrect, 2) the value of the outcome variable is incorrect, and 3) the values of the predictor and/or outcome variables are incorrect where the error probability is correlated between variables, as well as the magnitude of the error. In each situation, we demonstrate the extent to which naive estimates of the association will be biased. We then propose methods to correct estimates and confidence intervals based on audit findings. We then extend these results to multiple linear regression where multiple covariates may be incorrect in the database and the rate and magnitude of the errors may depend on study site. We demonstrate the finite sample performance of our estimators using simulation studies and discuss some practical considerations. We then illustrate our methods using data from 2815 HIV-infected initiators of antiretroviral therapy (ART) in the CCASAnet cohort, of whom 123 had their data checked in an initial audit, followed by a second audit of 111 additional patient records. Finally, we discuss results and offer suggestions for future research.

2. Methods

In this section we study scenarios where 1) the predictor, 2) the outcome, and 3) the predictor and the outcome are sometimes incorrect in the database. We then extend these results to settings where there are multiple covariates and the errors may differ by site.

2.1 Predictor is sometimes incorrect in database

Let Y and X be the outcome and predictor variables, respectively, and their relationship is given by the equation

Y=β0+β1X+ε, (1)

where ε has mean zero and is independent of X. Instead of X, the analyst has W recorded in the database:

W=X+SU, (2)

where S is an indicator variable that X is not correctly recorded in the database, and U is the discrepancy between the true predictor value (i.e., the value in the chart) and that in the database. We assume that U has expectation zero and

S,Uε,X,

where AB indicates that A is independent of B. The predictor X is treated as a random variable and thus the model (1)–(2) is structural (Carroll et al., 2006). The values of U and S are not known unless an audit has been performed. Let V be the indicator that a data audit is performed, so that (X, S, U) are known if V = 1. We assume that V is independent of the other variables; this is ensured by randomly selecting records to be audited. Let (Yi, Xi, Wi, Si, Ui, εi, Vi) for subjects i = 1, · · ·, N be identical and independent draws from (Y, X, W, S, U, ε, V ).

Our goal is to estimate β1. Notice that this set-up is essentially the classical measurement error problem (Fuller, 1987), except the inclusion of S ensures that only an unknown proportion of the predictors are measured with error. Following Section 1.1.6 of Fuller, it can easily be shown that if we fit the model E(Y|W) = γ0 + γ1W, then our least squares estimate of γ1, denoted γ̂1, will be a biased estimate of β1. Specifically, E(γ̂1) = β1λ, where

λ=σx2σx2+σu2p, (3)

with σx2Var(X),σu2Var(U), and pPr(S = 1). Notice that λ is between 0 and 1, so the estimated regression coefficient is attenuated. The seriousness of the attenuation depends on the proportion of predictor variables with error (p) and the variance of the error magnitude ( σu2), relative to the variance of the predictor ( σx2). These results are similar to results from the classical measurement error problem, the only difference being the inclusion of p in the denominator of λ. In the measurement error literature, λ is sometimes referred to as the “reliability ratio.”

We can use the audit data to get an unbiased estimate of β1. A natural estimator for β1 is simply γ̂1/λ̂1, where

λ^1=σ^x2σ^x2+σ^u2p^.

The estimates σ^x2,σ^u2, and are all obtained from the audited data as follows:

σ^x2=Vi(XiX¯)2Vi1,σ^u2=ViSiUi2ViSi1,p^=ViSiVi,

where = Σ ViXiVi.

Confidence intervals around the corrected estimate can be computed by applying M-estimation techniques and appealing to large-sample theory (Stefanski and Boos, 2002). Specifically, let θ=(γ0,γ1,μx,σx2,p,σu2) where μx is the mean of X. Our estimates, θ̂, solve the equations i=1Nψi(θ)=0, where

ψi(θ)={Yiγ0γ1Wi(Yiγ0γ1Wi)Wi(Xiμx)Vi((Xiμx)2σx2)Vi(Sip)Vi(Ui2σu2)SiVi.

Define

A(θ^)=1Ni=1Nψi(θ^)θandB(θ^)=1Ni=1Nψi(θ^)ψi(θ^)T.

Then the variance of θ̂ can be estimated as V (θ̂) = A(θ̂)−1 B(θ̂) A(θ̂)−1/N. Define g(θ)=γ1(σx2+σu2p)/σx2. Therefore,

g(θ)θ=(0,σx2+σu2pσx2,0,γ1σu2p(σx2)2,γ1σu2σx2,γ1pσx2),

and from the delta method, an approximation of the variance of γ̂1/λ̂1 can be computed by an estimate of the variance of the asymptotic normal law for γ̂1/λ̂1, g(θ^)θV(θ^)g(θ^)Tθ.

There are other consistent estimators of β1 which incorporate audit results. Notice that the reliability ratio, λ, could also be estimated as

λ^2=σ^w2σ^u2p^σ^w2,

where σ^w2=(WiW¯)2/(N1). One could also use standard measurement error techniques, estimating λ without estimating the proportion incorrect p. Specifically, define T as equal to 0 if S = 0 and equal to U if S = 1. T has expectation zero, is independent of ε and X, and Var(T)=σt2=pσu2. Therefore, another consistent estimator of β1 is γ̂1/λ̂3 with

λ^3=σ^x2σ^x2+σ^t2,

where σ^t2=ViTi2/(Vi1). Confidence intervals for these estimators using λ̂2 and λ̂3 can be constructed in a manner similar to that described above using λ̂1.

2.2 Outcome is sometimes incorrect in database

Suppose now that some values of the outcome are incorrect in the database, such that

Y=Y+SyUy, (4)

where Y* is the outcome observed in the database, Sy is the indicator that the outcome is incorrect in the database, and Uy is the discrepancy between the true value of the outcome and that in the database. The true relationship between X and Y is given by (1), with Sy, Uyε, X, and X is observable. Instead of regressing Y on X, we regress Y* on X, fitting the model E(Y*|X) = γ0 + γ1X. What is the relationship between γ1 and β1?

It is well-known that if Y is measured with error (i.e., Pr(Sy = 1) = 1), then the least squares estimate of γ1 is a consistent estimator of β1 (Fuller, 1987). The answer is the same in our situation: from (1) and (4), we can write Y* = β0 + β1X + SyUy + ε and since X and ε are independent of Sy and Uy, the regression of Y* on X will be consistent with the regression of Y on X.

2.3 Predictor and outcome are sometimes incorrect in database

Now consider the case where the value for the predictor and/or the outcome may be incorrect in the database. The true relationship between X and Y is given by (1), but instead of observing X and Y we observe W and Y* where W = X + SU as given in (2) and

Y=Y+SyUy+SU, (5)

where Sy, Uy, and S are as defined earlier, and U* denotes the shift in the outcome variable due to an error in the predictor variable. Notice that this model is similar to combining the models of the previous sections except we now allow some errors in the predictor variable to lead to errors in the outcome. This model is particularly motivated by our audits of the CCASAnet dataset, where X was date of ART initiation and Y was the CD4 count measurement taken closest to date of ART initiation. (Low CD4 count suggests that an individual’s immune system has been compromised.) If the date of ART initiation was incorrect in the database, then the CD4 count at ART initiation recorded in the database was likely incorrect, shifted by some amount U*. It is also possible that there are data errors in the outcome which are unrelated to data errors in the predictor; hence the inclusion of Sy and Uy in the model.

Therefore, we can think of there being two sets of errors: those related to a recording error in the predictor (S, U, U*) and those related to a recording error in the outcome (Sy, Uy). We assume that these sets of error variables are independent: S, U, U*Sy, Uy. Notice that we make no assumption of independence between U and U*, as we expect these errors to be associated. For example, if date of ART initiation is incorrect (S = 1) then we might expect the magnitude of the induced error in the CD4 count at ART initiation (U*) to be correlated with the magnitude of the error in the date of ART initiation (U). Similar to the previous sections, we assume that U, Uy, and U* are centered at 0, and that εX, S, U, Sy, Uy, U*.

Consider the naive analysis where we fit the model E(Y*|W) = γ0 + γ1W. In the online supplement we show that the expectation of the least squares estimate of γ1 is

E(γ^1)=β1λ+ν,

where λ was defined earlier by (3) and

ν=pσu,uσx2+pσu2,

where σu,u* = Cov(U, U*).

Some intuition describing the bias is warranted: Errors in X lead to attenuation or a flatter estimate of the slope. Errors in X and Y which are positively correlated tend to tilt the slope in a positive direction, whereas errors in X and Y which are negatively correlated tend to make the slope more negative. For example, if X and Y are positively correlated and both have positively correlated errors (i.e., σu,u* > 0), then the errors in X will flatten the slope towards 0 whereas the positive correlation between the errors of X and Y will act in the opposite direction and steepen the slope. The direction of the bias will therefore depend on the relative magnitude of these two different components of error.

Notice that if U and U* are not correlated, then σu,u* = 0 and we are left with the same bias derived when there were only errors in the dataset for the predictor. This makes sense, as we have seen that estimates are unbiased when only the outcome variable has errors, so if both the outcome and predictor have errors but these errors are independent, then we would expect the same attenuation as in the scenario where only the predictor has errors.

As we have an expression for the bias of the least squares estimate of γ1, we can correct the bias using data from an audit in a manner similar to that described earlier. Specifically, we can estimate β1 with

β^1=γ^1(σ^x2+pσ^u2)p^σ^u,uσ^x2.

We have already described estimation of all these quantities except for σ̂u,u*, the covariance between U and U*. The covariance between U and U* is equal to the covariance between the residual error terms Y*Y and WX given S = 1, because of the independence of U and (Sy, Uy). Therefore, we can estimate σu,u* as ViSi(YiYi)Ui/(ViSi1).

Confidence intervals for β1 can be constructed using M-estimation techniques as described in Section 2.1 with only a few adjustments: define θ1 = (θ, σu,u*), add the line SiVi((YiYi)(WiXi)σu,u) to the estimating equations given in section 2.1, and define g1(θ1)=γ1(σx2+σu2p)/σx2pσu,u/σx2, so that

g1(θ1)θ1=(0,σx2+σu2pσx2,0,γ1σu2p+pσu,u(σx2)2,γ1σu2σu,uσx2,γ1pσx2,pσx2).

2.4 Including Covariates

The models and methods described above can be extended to include covariates. Now suppose X consists of multiple variables that are sometimes incorrect in the database, and let W be the value of X recorded in the database, S a vector of error indicators, and U the magnitude of the errors (centered at 0) with W = X + SU. Notice that under this scenario, the error rates p and magnitudes U may be different for different variables and may be correlated. Suppose there are also covariates Z that are recorded without error in the database. Let Y = β0 + βxX + βzZ + ε. Similar to section 2.1 but conditional on Z, we assume that S, Uε, X and εX. We also allow Y to be incorrectly recorded in the database with Y* = Y + SyUy + SU*, where Sy and Uy are independent of all other variables conditional on Z, but U* may be correlated with U. For notational convenience, define T = (S1U1, · · ·, SkUk) and T=(S1U1,,SkUk) where k is the dimension of X. Notice that this model encompasses all of those presented in sections 2.1–2.3.

Consistent, moment-based estimators of (βx, βz) are

(^xx^xz^zx^zz)1(^xy^zy), (6)

where Σ̂ab designates the sample covariance between the variables A and B. However, from the database, instead of Σ̂xx, Σ̂zx, Σ̂xy, and Σ̂zy, we have Σ̂ww, Σ̂zw, Σ̂wy*, and Σ̂zy*. If we fit the model, E(Y*|W, Z) = γ0 + γxW + γzZ, then (γ̂x, γ̂z) are biased estimates of (βx, βz).

We can obtain consistent estimates of (βx, βz) using the audit data. We know that Σxx = Σww − Σtt, Σxz = Σwz, Σxy = Σwy* − Σtt* 1, and Σzy = Σzy*. Therefore, a consistent estimator of (βx, βz) is

(^ww^tt^wz^zw^zz)1(^wy^tt1^zy). (7)

The estimates Σ̂tt and Σ̂tt* 1 are available from the audit data. Notice that as before there are several potential approaches for estimating these quantities. For example, suppose there are two variables that are sometimes incorrect in the database. Analogous to the single predictor case (section 2.1), one could directly compute Σ̂tt among those with V = 1 or as

(p^1^u1u1p^1p^21^u1u2p^1p^21^u1u2p^2^u2u2,)

where p2|1 = Pr(S2 = 1|S1 = 1); alternatively instead of computing Σ̂ww − Σ̂tt, one could simply compute Σ̂xx from the audit data. Depending on the specific context of the analysis, one may also be willing to make certain assumptions that will force some quantities to be 0. For example, one might assume that an error in X never induces an error in Y, therefore forcing Σtt* = 0.

In practice, it is likely that the error rate and/or magnitude differ by site. This would lead to a model of the following form:

W=X+SzUzY=Y+SyUY+SzUz.

In practice, it is also likely that the audited charts are randomly selected within site, or that conditional on Z, V is independent of all other variables. Under these models, estimation still is based on equation (7), only now one estimates Σxx with ΣwwEztt|z), or estimating site-specific error variances based on the audits and then taking a weighted average based on the proportion of all records belonging to a particular site. The models given above can also be slightly altered. For example, depending on the context one could assume that the distribution of (Uz, Uz) is the same across some or all sites, perhaps improving precision.

Confidence intervals for parameter estimates can be constructed using M-estimation techniques in a manner similar to that described in sections 2.1. Code implementing these computations is given in the online supplement.

3. Simulations

We investigated the finite sample properties of our estimators using simulation experiments. First we performed simulations under scenarios where the predictor only was sometimes incorrect in the database (corresponding to the methods of Section 2.1). In each simulation we generated N = 1000 vectors (Y, X, W, S, U, ε) using the models described in Section 2.1, with X, U, and ε normally distributed, S generated from a binomial distribution with success probability p ∈ (0.05, 0.10, 0.20, 0.30), σu ∈ (20, 50), and (β0, β1, σε, σx, μx) = (6, −0.01, 0.5, 50, 200). These parameter values were chosen to roughly mimic the relationship between CD4 count (X) and log-transformed HIV viral load (Y). Within each simulation experiment, we computed estimates with the number of audited charts (nv) being 0, 25, 50, 100, 200, 300, and 1000. Zero audited charts corresponded to no audit, and the resulting estimates were simply the naive estimates obtained by regressing Y on W. One thousand audited charts corresponded to having correct data for all records and estimates were obtained by regressing Y on X. When the number of audited charts was 25 to 300, we estimated β1 and computed 95% confidence intervals (CI) using λ̂1 as described in Section 2.1; for those records with V = 0, we treated X, S, and U as if they were unknown. The audited records were selected independently of all other variables. If no errors were discovered in the audited data (i.e., ΣViSi = 0), then our corrected estimate was set equal to the naive estimate regressing Y on W. If only one error was discovered in the audit (i.e., Σ ViSi = 1), then σ^u2=ViSiUi2. We performed 5,000 simulation replications for each of the data-generating scenarios. All simulation and analysis code is provided in the Supplementary Materials.

Simulation results are given in Table 1. With few errors of low relative magnitude (e.g., p = 0.05 and σu = 20), the bias of naive estimates was minimal and the coverage probability of 95% CI was good. However, as the error rate (p) and variance of the magnitude of the error (σu) increased, the bias of naive estimates increased and the coverage of 95% CI declined. Naturally, as the number of randomly audited charts increased, the performance of the corrected estimates improved. Bias greatly improved over the naive estimates by auditing as few as 25 charts, although with so few audits there was generally little, if any, information to estimate σu, and hence the variance of estimates was quite high and coverage did not achieve its nominal level. Coverage improved as the number of audits increased, achieving the nominal 95% level in our simulations after auditing approximately 50 and 200 charts for σu = 20 and 50, respectively. Despite the universal improvement over naive estimates in terms of bias and coverage, the mean squared error of corrected estimates were worse than the mean squared error of naive estimates for p = 0.05 and nv = 25, 50 as well as p = 0.1 and nv = 25, highlighting the importance of auditing a sufficient number of records. The performance of estimators was primarily driven by the number of records audited, not the overall sample size, as results were simular with N = 500 and 100 (Supplementary Material). In additional simulations, when few records were audited (e.g. ≤ 50), estimates based on λ̂1 tended to outperform estimates using λ̂2 and λ̂3 in terms of mean squared error; performance was similar when more records were audited (Supplementary Material).

Table 1.

Simulation Results when Predictor is Sometimes Incorrect

p nv σu = 20
σu = 50
%-Biasa SE¯b (×100) Coverage MSE (×107) %-Bias SE¯ (×100) Coverage MSE (×107)
0.05 0 −0.8 0.032 0.948 1 −4.78 0.032 0.663 3.4
25 0.06 0.034 0.95 1.3 0.38 0.066 0.847 10
50 0.01 0.033 0.951 1.1 0.26 0.056 0.898 5.1
100 0.01 0.032 0.952 1 0.13 0.047 0.934 2.6
300 0 0.032 0.953 1 −0.03 0.037 0.953 1.4
1000 0 0.032 0.954 1 −0.03 0.032 0.952 1
0.1 0 −1.58 0.032 0.911 1.3 −9.03 0.032 0.206 9.4
25 0.09 0.037 0.94 1.6 0.71 0.09 0.766 17.6
50 0.03 0.034 0.947 1.3 0.31 0.071 0.873 7.4
100 0.01 0.033 0.949 1.1 0.23 0.057 0.926 3.8
300 0 0.032 0.949 1.1 0.06 0.042 0.944 1.9
1000 −0.01 0.032 0.951 1 0.03 0.032 0.947 1
0.2 0 −3.1 0.032 0.835 2 −16.66 0.031 0.001 28.9
25 0.28 0.041 0.943 2 1.43 0.126 0.798 30.1
50 0.14 0.037 0.952 1.4 0.64 0.094 0.88 11.3
100 0.06 0.035 0.954 1.2 0.28 0.072 0.928 5.7
200 0.03 0.033 0.955 1.1 0.1 0.055 0.944 3.2
1000 0.01 0.032 0.953 1 −0.01 0.032 0.948 1
0.3 0 −4.54 0.032 0.696 3.1 −23.09 0.031 0 54.5
25 0.39 0.045 0.939 2.4 2.59 0.151 0.839 36.8
50 0.21 0.039 0.944 1.7 1.14 0.11 0.895 15.5
100 0.12 0.036 0.948 1.3 0.53 0.081 0.927 7.2
200 0.07 0.034 0.947 1.2 0.26 0.061 0.942 3.9
1000 0.03 0.032 0.951 1 0.08 0.032 0.95 1
a

Percentbias=(β^ββ)×100%.

b

SE¯=meanstandarderrorofestimates.

Next we performed simulations to examine the behavior of our estimators when the predictor and outcome were sometimes incorrect in the database (corresponding to the methods of Section 2.3). In each simulation we generated N = 1000 vectors (Y, X, W, S, U, ε) as described above. In addition, we generated Sy from a binomial distribution with success probability 0.2; Uy from a normal distribution with mean 0 and standard deviation 1; U* from a normal distribution with mean 0, standard deviation 0.5, and correlation with U set as ρu,u* ∈ {−0.5, 0, 0.5}. We subsequently generated Y* using equation (5). Again, we varied p, σu, and N across simulation experiments (5,000 replications per parameter setting) and nv within each simulation experiment. Simulation results for σu = 50 and N = 1000 are shown in Table 2.

Table 2.

Simulation Results when Predictor and Outcome are Sometimes Incorrect

p nv ρu,u* = −0.5 ρu,u* = 0 ρu,u* = 0.5
%-Biasa SE¯b (×100) Coverage MSE (×107) %-Bias SE¯ (×100) Coverage MSE (×107) %-Bias SE¯ (×100) Coverage MSE (×107)
0.05 0 −2.29 0.042 0.907 2.4 −4.69 0.043 0.785 4.3 −7.08 0.043 0.619 7.2
25 −2.62 0.073 0.877 19.6 −0.90 0.086 0.849 20.0 0.76 0.103 0.797 28.7
50 −2.62 0.061 0.872 7.4 −1.36 0.071 0.869 9.0 0.11 0.084 0.867 11.9
100 −1.55 0.053 0.916 3.6 −0.81 0.061 0.918 4.8 −0.08 0.070 0.914 6.0
300 −0.42 0.046 0.948 2.2 −0.20 0.049 0.946 2.6 −0.01 0.053 0.952 2.8
1000 −0.01 0.032 0.946 1.0 0.03 0.032 0.947 1.0 0.02 0.032 0.953 1.0
0.1 0 −4.54 0.042 0.796 3.9 −9.05 0.043 0.439 10.3 −13.62 0.044 0.147 21.0
25 −5.51 0.097 0.793 28.4 −1.57 0.124 0.758 34.0 1.63 0.151 0.727 55.4
50 −3.06 0.075 0.856 10.0 −1.26 0.095 0.853 13.6 0.19 0.115 0.840 19.9
100 −1.42 0.062 0.917 4.6 −0.62 0.075 0.914 6.9 −0.09 0.089 0.907 9.5
300 −0.49 0.050 0.948 2.6 −0.16 0.055 0.943 3.3 −0.12 0.061 0.948 3.8
1000 −0.06 0.032 0.954 1.0 0.02 0.032 0.951 1.0 0.04 0.032 0.949 1.0
0.2 0 −8.23 0.041 0.473 8.5 −16.73 0.043 0.035 30.1 −24.92 0.044 0 64.6
25 −5.54 0.132 0.787 37.7 −1.78 0.172 0.764 51.2 3.00 0.217 0.795 84.4
50 −2.42 0.098 0.883 13.0 −0.98 0.128 0.868 20.9 0.84 0.158 0.866 32.1
100 −1.05 0.076 0.933 6.5 −0.66 0.096 0.924 9.9 0.57 0.117 0.924 15.2
300 −0.29 0.056 0.951 3.2 −0.23 0.064 0.946 4.2 0.17 0.073 0.944 5.6
1000 0.08 0.032 0.954 1.0 −0.09 0.032 0.949 1.0 0.02 0.032 0.951 1.0
0.3 0 −11.60 0.040 0.179 15.2 −23.06 0.042 0 55.3 −34.60 0.044 0 122
25 −4.90 0.162 0.817 46.5 −0.80 0.210 0.804 71.4 4.54 0.266 0.834 115
50 −2.39 0.117 0.893 17.5 −0.47 0.151 0.886 28.3 2.49 0.191 0.893 45.8
100 −1.29 0.088 0.925 9.0 −0.19 0.111 0.927 13.7 1.33 0.137 0.925 20.9
300 −0.58 0.061 0.947 3.8 −0.11 0.071 0.952 5.2 0.33 0.082 0.946 6.8
1000 −0.08 0.032 0.950 1.0 −0.01 0.032 0.946 1.0 −0.04 0.032 0.955 1.0
a

Percentbias=(β^ββ)×100%.

b

SE¯=meanstandarderrorofestimates.

For ρu,u* = −0.5, depending on the error rate p, fairly large audits were needed to perform as well as the naive estimator. For p = 0.05, bias and coverage of corrected estimators were only better than the naive estimator when nv = 100, whereas an improvement in mean squared error required nv = 300. In contrast, for ρu,u* = 0 and 0.5, bias and coverage were better than the naive analysis in all simulation scenarios, even with audits as small as 25; mean squared error was typically better with audits of size 50–100, depending on the error rate. These phenomena can be explained in part because the bias of naive estimators was not very large for ρu,u* = −0.5. The percent-bias of naive estimates is (λ1+νβ1)×100%. Since β1 < 0 in our simulations, when ρu,u* > 0 (and hence ν> 0) then the percent-bias was more negative than it would have been if ρu,u* = 0; when ρu,u* < 0 then the percent-bias was less negative. The simulation results given in Table 1 were based on a model which assumed ρu,u* = 0; therefore the percent-bias for naive estimators under ρu,u* = 0 given in Table 2 was similar to those of Table 1. The performance of our estimators was slightly worse in Table 2, however, because the estimation procedure did not assume ρu,u* = 0. Standard errors and the mean squared error were also slightly larger because in these simulations data were generated including independent errors in the outcome (Sy and Uy).

Finally, we repeated simulations including one additional covariate recorded without error in the database (corresponding to a simple case of the methods described in Section 2.4). Z was randomly generated from a normal distribution with mean 0, variance 1, and correlation with X of 0.3. The coefficient βz was set at 1. All other parameters were fixed at their values described above for generating simulated datasets with errors in both X and Y. Simulation results are given in the Supplementary Material. In summary, the performance of estimators of βx were similar to that shown in Table 2. In general, the bias and coverage of naive estimates of βz worsened for larger values of p and σu, although bias and coverage of naive estimates were not as poor for βz as for βx. For σu = 50, it generally took audit sizes of 50–100 for corrected estimates of βz to have lower mean squared errors than naive estimates. For σu = 20, the mean squared errors of naive estimates of βz were quite similar to those of corrected estimates at all audit sizes considered.

4. Practical Considerations

The primary purpose of an audit is to examine and confirm the accuracy of data. To this end, an audit is often performed by an independent group, and the rate of errors, p, and the distribution of the magnitude of the errors, U, are of primary interest. The sample size of an initial audit should therefore depend on the desired precision for estimating the error rate. Audit sizes have been discussed elsewhere and are based on standard formulas (e.g., Arens (2008), page 593).

The audit sample size needed to accurately correct estimates of association may need to be larger, or smaller, than the size of the initial audit. Therefore, depending on results of the first audit, a second audit may be desirable. The purpose of this second audit would be to refine estimates of p, σu2, and ρu,u* to reduce standard errors of corrected estimates. Therefore, sample sizes of these second audits can be based on the desired precision or mean squared error for a regression of Y on X, and preliminary data from the first audit. We were unable to derive a simple formula to estimate the audit size needed to obtain a given level of precision. We therefore recommend computing sample sizes for the second audit through simulation. A second audit may not be necessary in sites less prone to errors based on data from the first audit.

Given the purpose of a second audit, an internal audit or self-assessment of the data by local investigators may be sufficient and reduce study costs over performing a second audit by an independent group.

5. Data Example

Data were collected on 3480 HIV-positive individuals from CCASAnet sites in Argentina, Brazil, Chile, Honduras, Mexico, and Peru. To preserve the anonymity of the clinics, we have labeled them randomly as sites A-F. Each site sent a database containing patient characteristics at initiation of antiretroviral therapy (ART). The CCASAnet data coordinating center at Vanderbilt University randomly selected 191 records, approximately 30 per site, to be audited, and sent a team to each site to compare the values of key variables in the database with those found in the charts for these records. One hundred sixty seven of the 191 randomly selected records were initially audited (16 records could not be located or were unavailable because they were needed for patient care, 8 records were not audited because of time constraints). Audited values for each variable for each record were coded as one of the following: 1) correct, 2) minor or rounding error, 3) major error – value in database did not match value in chart, 4) missing – value recorded as missing in the database found in the clinical record, or 5) sourceless – value recorded in the database not found in the clinical record. For our analysis, sourceless errors (code=5) were treated as not audited (V = 0). Records missing either the outcome or predictor variable in the database were not included in analyses; therefore, we excluded records missing a variable that was later found during the audit (code=4). Finally, those 24 records that were supposed to be audited but were not were assigned V = 0. These three analysis decisions essentially assume that the distribution of analysis variables for individuals with these types of errors/missing data is similar to that of individuals included in the study.

We considered the association between date of ART initiation and CD4 count. Patients who start ART at higher CD4 counts tend to have a better prognosis, so there has been a push to treat patients at higher CD4 levels (Stohr et al., 2007). Therefore, a positive trend between date of ART initiation and CD4 count would indicate that in recent years HIV-positive patients have been starting their medications in less advanced stages of HIV-disease. Unadjusted analyses of the original data suggest that CD4 was on average 0.044 cells1/2 lower per year (95% CI −0.15, 0.06). (CD4 was transformed to make it less skewed.) However, after adjusting for study site the trend was towards higher CD4 levels among patients initiating ART in more recent years: 0.11 cells1/2 per year (95% CI −0.01, 0.24).

Data audits were performed and 18/123 (15%) of audited ART initiation dates had a value in the database different from the value in the clinical charts. The range of the discrepancy was −76 days to 1489 days (4.1 years), with a median of 7 days. As discussed in Section 2.3, if date of ART initiation was incorrect in the database, then the CD4 count recorded in the database at the incorrect date was often not the same as the CD4 measurement at the true date of ART initiation. For those 18 patients with an incorrect date of ART initiation, Figure 1A is a scatterplot of the magnitude of the error in date of ART initiation versus the magnitude of the induced error in CD4. (Note that CD4 at ART initiation was defined as the CD4 measurement taken closest to, but no more than 7 days after or 180 days before, the date of ART initiation (Tuboi et al., 2009). Therefore, for many of the minor errors in date of ART initiation, the previous baseline CD4 measurement was still the measurement closest to the date of ART initiation, and hence the change in CD4 was 0.)

Figure 1.

Figure 1

The magnitude of the error in date of ART initiation versus the magnitude of the induced error in square-root transformed CD4 at ART initiation. A. Data from first audit. B. Data from first and second audits combined.

In an initial analysis applying the methods of Section 2.3, the corrected unadjusted estimate for β1 was

β^1=γ^1(σ^x2+p^σ^u2)p^σ^u,uσ^x2=0.044(2.02+0.15×0.962)0.15(2.1)2.02,

or that CD4 at ART initiation was on average 0.035 cells1/2 higher per year (95% CI −0.17, 0.24). This estimate is substantively different from the uncorrected estimate (−0.044 cells1/2 per year), and its confidence interval is substantially wider and includes 0. However, the corrected estimate was largely driven by one extreme value (seen in Figure 1A). With this record removed, the estimated variance of the magnitude of the error for date of ART initiation ( σ^u2) and its covariance with the magnitude of error for CD4(σ^u,u) greatly decreased, and hence the estimate for β1 was −0.043 cells1/2 per year (95% CI −0.15, 0.06), very similar to the uncorrected estimate.

To refine our estimates, we decided to perform additional targeted audits. The error rates and magnitudes seen in the initial audit were quite variable across sites (see Table 3). For example, 0 of 25 audited charts in Site F had errors in the date of ART initiation whereas 6 of 20 audited charts in Site C had errors and the variance of the magnitude of the errors was large. Using site-specific parameter estimates from the initial audits, we simulated datasets and applied the methods of Section 2.3 to determine the impact of additional audits on the bias, confidence interval width, and mean-squared error of our estimates for each site (details in the online Supplement). We decided to audit approximately 50 additional records from Site C and 25 from Sites A, B, and E. Sites A and D had similar low error rates and magnitudes; we sampled additional records from Site A because our data audit team was going to be on-site for a different purpose. Charts for auditing were randomly selected within site by the data coordinating center. The second audits were performed by local investigators at all four sites, although in Sites A and C our data audit team verified the accuracy of the local audit by re-auditing the same records. Error rates and magnitudes between the first and second audits were similar within sites (see Table 3). Because some of the selected charts were missing CD4 or were unavailable at the time of the audit, the actual number of additional audits included in these analyses were 19, 22, 44, and 26 for Sites A, B, C, and E, respectively.

Table 3.

Error rates and magnitudes based on the audits.

Site N nv Σ SiVi σ̂u σ̂x ρ̂u,u*
First Audit
 Site A 260 15 1 0.07 0.02 1.5 0
 Site B 439 22 4 0.18 0.07 1.2 0
 Site C 687 20 6 0.30 1.64 1.2 −0.99
 Site D 332 15 1 0.07 0.10 2.7 0
 Site E 396 26 6 0.23 0.23 1.6 −0.78
 Site F 703 25 0 0 1.3
 Combined 2817 123 18 0.15 0.96 2.0 −0.98
First and Second Audits
 Site A 259 34 4 0.12 0.06 1.7 0
 Site B 439 44 6 0.14 0.05 1.2 0
 Site C 686 64 16 0.25 1.16 1.1 −0.71
 Site D 332 15 1 0.07 0.10 2.7 0
 Site E 396 52 10 0.19 0.19 1.5 −0.27
 Site F 703 25 0 0 1.3
 Combined 2815a 234 37 0.16 0.76 1.7 −0.49
a

Two patients were excluded from the analysis after the second audit: one from Site C had no CD4 measurement at corrected date of HAART initiation, and one from Site A was found to no longer meet inclusion criteria because they started a non-qualifying treatment regimen.

In analyses applying the methods of Section 2.3 using the combined data from the first and second audits (which ignored the fact that we selected charts to audit conditional on study site), our new estimate of β̂1 was 0.006 (95% CI −0.16, 0.17). Using the data from both audits, the correlation between the magnitude of errors in date of ART initiation and CD4 was less extreme and results were not as dependent on a single outlying measurement (see Table 3 and Figure 1B). Naturally, the confidence interval for the estimate was also more narrow, although not as narrow as that of the naive estimate.

We then applied the methods of Section 2.4 to adjust for study site and to properly acknowledge that audit selection depended on site. In this analysis we also allowed error rates and magnitudes to vary by site. (Results were nearly identical if we assumed the error distributions were the same for Sites A, B, and D; data not shown.) The estimated adjusted slope in this analysis was 0.18 (95% CI 0.00, 0.37), compared to the naive estimate of 0.11 (95% CI −0.01, 0.24). The corrected estimate suggests a slightly stronger trend towards patients initiating ART at higher CD4 in more recent years. The corrected estimate’s wider confidence interval reflects additional uncertainty in our estimate to correct the bias using the audit data.

Finally, we performed a similar analysis also adjusting for age at ART initiation and sex. Sex was correctly recorded in all audited records, but there were 26 errors in age at ART initiation (11% of audited charts), 4 of which were due to incorrect dates of ART initiation in the database. (Note that age was recorded in years whereas date of ART initation was in terms of days.) Therefore, S2 and U2 (indicator and magnitude of error in age, respectively) were correlated with S1 and U1 (indicator and magnitude of error in date of ART initiation), and also free to differ between sites. In this analysis, U1 (magnitude of error in CD4 due to error in date of ART initiation) also was free to vary by site. We assumed that errors in age did not induce errors in CD4, so our model did not include U2. Results of this analysis for all variables are shown in Table 4 compared to their corresponding estimates in naive analyses that ignored the database errors. Effect estimates for all variables differ from their naive counterparts, although general conclusions are the same except for date of ART initiation, where corrected 95% CI no longer include zero.

Table 4.

Effect sizes and 95% confidence intervals for naive and corrected estimates of CD4.

Variable Naive
Corrected
Estimate (95% CI) Estimate (95% CI)
Date of ART initiation (per year) 0.12 (−0.01, 0.24) 0.19 (0.01, 0.37)
Age (per 10 years) −0.02 (−0.21, 0.18) −0.05 (−0.25, 0.16)
Male Sex −0.73 (−1.18, −0.29) −0.73 (−1.18, −0.28)
Study Site
 Site A 1.28 (0.54, 2.03) 1.32 (0.67, 1.97)
 Site B 0.94 (0.27, 1.60) 1.07 (0.40, 1.75)
 Site C 2.76 (2.20, 3.32) 2.83 (2.24, 3.43)
 Site D 2.40 (1.60, 3.19) 2.64 (1.74, 3.54)
 Site E 0.58 (−0.07, 1.23) 0.64 (0.01, 1.28)
 Site F (reference category) 0 0

6. Discussion

We have developed methods to correct linear regression estimates when some variables have errors in the database that are discovered by an audit. Our methods incorporate data from the audit and are applicable to settings with multiple incorrect variables, correlation between error rates and magnitudes across variables, and differing error rates across variables and sites. Our methods also extend measurement error models to scenarios where only a portion of records have errors and to scenarios where there are possibly correlated errors in both the outcome and the predictor.

Data audits are an important component of biomedical research – particularly observational studies which may be especially prone to data errors. When errors are found in an audit, our methods provide investigators with an alternative to either ignoring audit results or re-abstracting all data. Of course, if error rates and magnitudes are particularly high one may need to re-enter all data. Alternatively, if error rates and/or magnitudes are low, results incorporating audit findings using our methods may be similar to naive analyses. Even in this case, computing corrected estimates is worthwhile, as they demonstrate the validity of results.

In our example analysis, there were several records that were supposed to be audited but were not, and there were several records where a value for a variable was in the database but was not found in the clinical charts. Our analyses assumed the distribution of variables among these records was the same as among those that were not selected to be audited. In our data example, we also removed records in which the outcome or predictor was missing in the database, implicitly assuming the data were missing completely at random. These assumptions could presumably be relaxed by incorporating techniques for addressing missing data (Little and Rubin, 2002). More generally, our problem could be framed as a missing data problem where the true value of variables is only observed in the audited subgroup, but can be predicted/imputed using values in the database.

Other potential directions for future research include developing methods for settings where the errors are not centered at 0, or where the relationship between X and Y and/or U and U* are nonlinear. We have seen that results were sensitive to extreme values; approaches for dealing with outliers and small audit sizes perhaps along the lines of Fuller (1987) or Cheng, Schneeweiss, and Thamerus (2000) are warranted. As seen from our simulations, when few records are audited the improvements in bias of our corrected estimates may not be worth their added variability. We would also like to extend these methods to analyses with other outcomes such as binary and right-censored time-to-event outcomes.

Supplementary Material

Supp Appendix

Acknowledgments

The authors would like to thank the CCASAnet team, particularly the data managers at each of the sites and Dan Masys, Catherine McGowan, Stephany Duda, and Firas Wehbe, for performing the audits and providing data. This work was supported in part by the National Institutes of Health grant numbers 1 U01 AI069923 and UL1 RR024975.

Footnotes

Supplementary Materials

Tables and material referenced in Sections 2, 3, and 5, are available under the Paper Information link at the Biometrics website http://www.biometrics.tibs.org. The R code used in the simulations is posted at http://biostat.mc.vanderbilt.edu/DataAuditSimulationCode.

References

  1. Arens AA, Elder RJ, Beasley MS. Auditing and Assurance Services: An Integrated Approach. 12. Upper Saddle River, New Jersey: Prentice Hall; 2008. [Google Scholar]
  2. Carroll RJ, Ruppert D, Stefanski LA, Crainiceanu CM. Measurement Error in Nonlinear Models, A Modern Perspective. 2. Boca Raton, Florida: Chapman and Hall; 2006. [Google Scholar]
  3. Cheng CL, Schneeweiss H, Thamerus M. A small sample estimator for a polynomial regression with errors in the variables. JRSSB. 2000;62:699–709. [Google Scholar]
  4. Fuller WA. Measurement Error Models. New York: John Wiley & Sons; 1987. [Google Scholar]
  5. Little RJA, Rubin DB. Statistical Analysis With Missing Data. New York: Wiley; 2002. [Google Scholar]
  6. Mullooly JP. The effects of data entry error: an analysis of partial verification. Computers and Biomedical Research. 1990;23:259–267. doi: 10.1016/0010-4809(90)90020-d. [DOI] [PubMed] [Google Scholar]
  7. McGowan CC, Cahn P, Gotuzzo E, Padgett D, Pape JW, Wolff M, Schechter M, Masys DR. Cohort profile: Caribbean, Central and South America Network for HIV research (CCASAnet) collaboration within International Epidemiologic Databases to Evaluate AIDS (IeDEA) programme. International Journal of Epidemiology. 2007;36:969–976. doi: 10.1093/ije/dym073. [DOI] [PubMed] [Google Scholar]
  8. Stefanski LA, Boos DD. The calculus of M-estimation. The American Statistician. 2002;56:29–38. [Google Scholar]
  9. Stohr W, Dunn DT, Porter K, Hill T, Gazzard B, Walsh J, Gilson R, Easterbrook P, Fisher M, Johnson MA, Delpech VC, Phillips AN, Sabin CA. CD4 cell count trends and initiation of antiretroviral therapy: trends in seven UK centres, 1997–2003. HIV Medicine. 2007;8:135–141. doi: 10.1111/j.1468-1293.2007.00443.x. [DOI] [PubMed] [Google Scholar]
  10. Tuboi SH, Schechter M, McGowan CC, Cesar C, Krolewiecki A, Cahn P, Wolff M, Pape JW, Padgett D, Madero JS, et al. Mortality during the first year of potent antiretroviral therapy in HIV-1-infected patients in 7 sites throughout Latin America and the Caribbean. Journal of Acquired Immune Deficiency Syndrome. 2009;51:615–623. doi: 10.1097/QAI.0b013e3181a44f0a. [DOI] [PMC free article] [PubMed] [Google Scholar]

Associated Data

This section collects any data citations, data availability statements, or supplementary materials included in this article.

Supplementary Materials

Supp Appendix

RESOURCES